<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://omnicommons.org/mediawiki/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=Kkr</id>
	<title>Omni Commons - User contributions [en]</title>
	<link rel="self" type="application/atom+xml" href="https://omnicommons.org/mediawiki/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=Kkr"/>
	<link rel="alternate" type="text/html" href="https://omnicommons.org/wiki/Special:Contributions/Kkr"/>
	<updated>2026-04-22T15:29:24Z</updated>
	<subtitle>User contributions</subtitle>
	<generator>MediaWiki 1.37.2</generator>
	<entry>
		<id>https://omnicommons.org/mediawiki/index.php?title=Volunteer&amp;diff=3920</id>
		<title>Volunteer</title>
		<link rel="alternate" type="text/html" href="https://omnicommons.org/mediawiki/index.php?title=Volunteer&amp;diff=3920"/>
		<updated>2015-08-31T16:37:10Z</updated>

		<summary type="html">&lt;p&gt;Kkr: /* Building renovation projects */ this was not pointing to the current updated list&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;The Omni Commons is 100% volunteer-run. We&amp;#039;ve got lots to do and there are tons of ways you can help out!&lt;br /&gt;
&lt;br /&gt;
=Join the mailing list=&lt;br /&gt;
Sign up for our low-traffic volunteer mailing list to receive announcements about upcoming work parties and calls for volunteers for specific tasks: https://omnicommons.org/lists/listinfo/volunteers&lt;br /&gt;
&lt;br /&gt;
=Working Groups=&lt;br /&gt;
We have a number of [[Working Groups]] dedicated to specific aspects of the projects functioning. Visit the links to any given working group to learn more and join the mailing list:&lt;br /&gt;
* The [[Commons Working Group]] coordinates booking and event management for the common spaces of the building - meets Saturdays at 1pm in the Blue Classroom.&lt;br /&gt;
* The [[Building_Construction_and_Maintenance_Working_Group|Building Working Group]] focuses on physical construction, maintenance and alteration projects - meets Mondays at 8pm.&lt;br /&gt;
* The [[Challenging Dominant Culture Working Group]] explores bias and issues of difference and inclusion in the space, challenging dominant cultural influences and developing projects and relationships more in line with the values of the Omni, as stated in the founding document and statement of solidarity - meets every Sunday at 3pm in La Commune.&lt;br /&gt;
* The [[Finances Working Group]] ensures the continued financial health of the Omni Oakland Commons - meets every other Thursday at 7pm.&lt;br /&gt;
* The [[Welcoming Committee]] organizes around creating a welcoming and inclusive experience for newcomers and visitors to the project - meets Thursdays at 6pm.&lt;br /&gt;
&lt;br /&gt;
=High Priority Needs=&lt;br /&gt;
* Accounting / Finance&lt;br /&gt;
* Electrical&lt;br /&gt;
* Plumbing&lt;br /&gt;
* Construction&lt;br /&gt;
* Legal / Permits&lt;br /&gt;
&lt;br /&gt;
=Simple things you can do to help=&lt;br /&gt;
See [[Simple_things_you_can_do_to_help|this wiki page]]&lt;br /&gt;
&lt;br /&gt;
=Building renovation projects=&lt;br /&gt;
See [[ToFix|this wiki page]]&lt;/div&gt;</summary>
		<author><name>Kkr</name></author>
	</entry>
	<entry>
		<id>https://omnicommons.org/mediawiki/index.php?title=ToFix&amp;diff=3919</id>
		<title>ToFix</title>
		<link rel="alternate" type="text/html" href="https://omnicommons.org/mediawiki/index.php?title=ToFix&amp;diff=3919"/>
		<updated>2015-08-31T16:31:08Z</updated>

		<summary type="html">&lt;p&gt;Kkr: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;stuff in the building to fix&lt;br /&gt;
&lt;br /&gt;
==General==&lt;br /&gt;
Remove all extension cords, replace with conduit or install outlets if necessary&lt;br /&gt;
&lt;br /&gt;
== Ballroom ==&lt;br /&gt;
&lt;br /&gt;
=== Bar ===&lt;br /&gt;
&lt;br /&gt;
* Outlets on east/shattuck-side wall need to be: removed, wire-nutted, wrapped in elec tape, covered with blank faceplates. TURN OFF CIRCUIT FIRST. Note: furthest N outlet not disconnected, only outlet in the center of the wall&lt;br /&gt;
* sink needs to have hole/leak repaired (stainless steel), and possibly re-mounted / re-caulked.&lt;br /&gt;
** Need to remove blue masonite tabletop as it is weighing the sink down! Modify and return as actual cabinetry / surface.&lt;br /&gt;
&lt;br /&gt;
=== Ballroom-Shattuck Exit Area ===&lt;br /&gt;
* install light cover into flourescent panel (22&amp;quot;x3&amp;#039;) - flourescents are 2x 2&amp;#039; bulbs&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine ===&lt;br /&gt;
* SW staircase up: Repair hole in south wall near floor immediately across from stairs (see south wall acoustic treatment)&lt;br /&gt;
* SW &amp;amp; SE staircases: motion detectors up &amp;amp; down&lt;br /&gt;
* SW &amp;amp; SE staircases: LED strip lighting on each side&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine Bathroom ===&lt;br /&gt;
* outlet needs to be replaced with GFCI - Note: no ground; Gerald suggests decommissioning and installing new grounded plug in wall just above counter; go into wall from other side, need to locate grounded location&lt;br /&gt;
* all exposed bulb fixtures need be replaced with covered fixtures (2x)&lt;br /&gt;
* Install paper towel holder&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine &amp;quot;Book Room&amp;quot; ===&lt;br /&gt;
* 4&amp;quot;x4&amp;quot; Outlets affixed to top of Electrical subpanel must be removed from subpanel, and affixed to balcony (code violation) (3x)&lt;br /&gt;
&lt;br /&gt;
=== Crow&amp;#039;s Nest ===&lt;br /&gt;
* Clear everything 3&amp;#039; in front of electrical subpanel including all cords, lighitng, etc&lt;br /&gt;
* acquire &amp;amp; install cover for light (fixture takes glass orb / cover around bulb, it is missing)&lt;br /&gt;
* extend balcony railing to out in front of balcony hatch - on E side of R&amp;amp;J balcony (building &amp;amp; osha safety)&lt;br /&gt;
&lt;br /&gt;
=== A/V Room ===&lt;br /&gt;
* Patch long thinnish strip above door where conduit is exposed.&lt;br /&gt;
* &amp;lt;s&amp;gt;Patch hole near floor in NW corner of this room near door jamb.&amp;lt;/s&amp;gt; &amp;lt;--needs another coat but effectively done&lt;br /&gt;
&lt;br /&gt;
=== Ticketbooth Room ===&lt;br /&gt;
* Patch small hole in ceiling corner above ticket window where new conduit was run. &lt;br /&gt;
* install new outlet (existing is cracked and not attached to wall&lt;br /&gt;
&lt;br /&gt;
== Front Area == &lt;br /&gt;
* cover floor sink behind front counter area w minimum 3/4&amp;quot; plywood cut out and sealant (trip hazard/health)&lt;br /&gt;
* build secure mailbox&lt;br /&gt;
&lt;br /&gt;
=== balcony ===&lt;br /&gt;
* 4&amp;#039;x2&amp;#039; light fixture panel cover&lt;br /&gt;
* &amp;lt;s&amp;gt;install paper towel dispenser and paper towels&amp;lt;/s&amp;gt;  &lt;br /&gt;
* bathroom: Replace light fixture (sub-8&amp;#039;) with standard caged bell-jar type&lt;br /&gt;
* between fridges: Lock roofer&amp;#039;s ladder (that lives b/t fridges in balcony) to wall. &lt;br /&gt;
* kitchenette: replace CFL bulb in kitchen with &amp;#039;safe&amp;#039; LED (silicone-wrapped kind) spot shape - e.g. for food safety if CFL breaks http://www.homedepot.com/p/Philips-60W-Equivalent-Soft-White-A19-A-Line-Spiral-CFL-Light-Bulb-2-Pack-E-434357/203001435&lt;br /&gt;
&lt;br /&gt;
=== TIL ===&lt;br /&gt;
* cover exposed wires in east wall (near bookshelf). can use a plate&lt;br /&gt;
* get clear cover to put over wall switch for old electric timer in wall in big bookshelf unit in south wall of TL&lt;br /&gt;
&lt;br /&gt;
== Basement ==&lt;br /&gt;
&lt;br /&gt;
* south wall: close holes in basement wall where opened to remove mold.&lt;br /&gt;
* Phat Beets room ventilation doesn&amp;#039;t work. people can suffocate in there.&lt;br /&gt;
* repair red stage &amp;lt;--- Removed baseboard, 3 broken joists, got one supplemental joist in, another one is most of the way in. Joists are 55 1/2&amp;quot; long, feet are 7&amp;quot; tall.&lt;br /&gt;
* clear remaining junk&lt;br /&gt;
&lt;br /&gt;
=== ceiling ===&lt;br /&gt;
* Acquire &amp;amp; install light fixture covers for the 4&amp;#039; flourescent fixtures in basement offices (bunker rooms) - roughly ~48&amp;quot;x16&amp;quot;. &lt;br /&gt;
* install protective bulb covers over remaining working 8&amp;#039; flourescents: 6x&lt;br /&gt;
* unscrew piece of broken lightbulb from East basement hallway, replace bare-bulb fixture with covered fixture&lt;br /&gt;
* re-attach and restore service to entire strip of 8&amp;#039; flourescents along west wall (closest to sudo) that had been decommissioned&lt;br /&gt;
* acquire and affix 1&amp;#039;x1&amp;#039; ceiling tiles in NW corner of basement, so lighting fixture &amp;amp; strip of lights can be re-connected. ~120 tiles&lt;br /&gt;
* Cut &amp;amp; attach drywall AND then also affix 1&amp;#039;x1&amp;#039; ceiling tiles to exposed ceiling areas in basement (2 areas)&lt;br /&gt;
* Replace bad ballast in any 8&amp;#039; flourescent fixture (that is not turning on. If not sure try lights in it that do work in another fixture.&lt;br /&gt;
&lt;br /&gt;
== Bocce Court ==&lt;br /&gt;
* hallway: install paper towel dispenser and paper towels&lt;br /&gt;
* entire room perimeter - 5LB ABC fire extinguishers at correct height every ~75&amp;#039; - starting w under each exit sign&lt;br /&gt;
&lt;br /&gt;
===  Sudo ===&lt;br /&gt;
* created dedicated space for storing excess lumber (long pieces), pipe, metal pieces, etc so they are not in jumbles (fire code).&lt;br /&gt;
* west wall - run more 3/4&amp;quot; conduit further down west wall. Must know code.&lt;br /&gt;
&lt;br /&gt;
=== CCL ===&lt;br /&gt;
* run new conduit / circuits to reduce excessive extension cord usage (fire code)&lt;br /&gt;
* west closet: clean up &amp;amp; seal west wall&lt;br /&gt;
* west closet: put bulb covers over the 2x 4&amp;#039; flourescents&lt;br /&gt;
* west closet: put bulb covers over the 2x 4&amp;#039; flourescents in annex/closet&lt;br /&gt;
* west closet: replace ballast in flourescent fixture in this room&lt;br /&gt;
* east closet: cover exposed octogon junction box in ceiling with appropriate octogon plate&lt;br /&gt;
* east closet: replace exposed wiring from new LED fixture to ceiling with armored flex or EMT&lt;br /&gt;
&lt;br /&gt;
== Disco Room ==&lt;br /&gt;
* light switch cover near 48th street door should be replaced by one with less-sharp edges (better-sized)&lt;br /&gt;
* giant lateral file cabinet needs to be removed / find a better home somewhere JOHN GIVENS TO REMOVE - email photo&lt;br /&gt;
* Trace &amp;amp; label ALL elec outlets in this room&lt;br /&gt;
* A/V instructions need to be made for home stereo / speaker setup, mixer in crows nest etc. in this room&lt;br /&gt;
* West exit door (top landing to 48th st staircase) needs be panic bar&amp;#039;d&lt;br /&gt;
* install closer to main (east) door of disco room&lt;br /&gt;
* install closer to west / emergency exit door of disco room&lt;br /&gt;
* remove or permanently mount ALL LARGE UNMOUNTED PLATE GLASS MIRRORS in this room: safety hazard&lt;br /&gt;
* hole in wall in west staircase down to 48th needs be covered&lt;br /&gt;
* plate to be installed to cover exposed ceiling wires immediately in front of 48th st street door leading up to disco room&lt;br /&gt;
* crow&amp;#039;s nest: giant hole in crows nest west wall needs to be a) filled with insulation b) covered (drywall etc)&lt;br /&gt;
* crow&amp;#039;s nest west wall: exposed electrical wires / fixture needs to be covered (and traced)&lt;br /&gt;
&lt;br /&gt;
== Rise Above ==&lt;br /&gt;
* replaced busted circuit breaker in every electrical panel (like in the 42 breaker panel) with either working breaker or factory blanks.&lt;br /&gt;
* remove 2x6 on ceiling on south side of room (COORDINATE WITH GABRIELA 1ST - move or cover all her stuff.&lt;br /&gt;
* stage left - install paper towel dispenser and paper towels.&lt;br /&gt;
&lt;br /&gt;
&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&lt;br /&gt;
= Doors =&lt;br /&gt;
&lt;br /&gt;
=== shattuck-ballroom outer ===&lt;br /&gt;
* need panic bars&lt;br /&gt;
&lt;br /&gt;
=== shattuck-ballroom inner ===&lt;br /&gt;
* needs to be hung, closers, panic bars&lt;br /&gt;
&lt;br /&gt;
=== cafe-basement (big white door) ===&lt;br /&gt;
* needs closer&lt;br /&gt;
* fix panic bar&lt;br /&gt;
&lt;br /&gt;
=== bocce hallway ===&lt;br /&gt;
* needs rehang, closer, panic bar, lock&lt;br /&gt;
&lt;br /&gt;
=== bocce-basement ===&lt;br /&gt;
* if possible, put closer on this door (may not be possible)&lt;br /&gt;
&lt;br /&gt;
=== bocce-ballroom ===&lt;br /&gt;
* closer&lt;br /&gt;
&lt;br /&gt;
=== mezzanine book room ===&lt;br /&gt;
* Replace door handle with non-locking handle.&lt;br /&gt;
&lt;br /&gt;
=== opal ===&lt;br /&gt;
* Install real doorknob, remove latch&lt;br /&gt;
&lt;br /&gt;
=== rise above ===&lt;br /&gt;
* replace locking main door to Rise Above in hallway with twenty minute solid-core (fire-code)&lt;br /&gt;
* replace 2x hollow-core sliding doors with 20 minutes solid-core sliding doors (fire-code)&lt;br /&gt;
* put closer on main door to Rise Above&lt;br /&gt;
&lt;br /&gt;
=== Blue Room ===&lt;br /&gt;
* to hallway: closer&lt;br /&gt;
* to ballroom: closer&lt;br /&gt;
&lt;br /&gt;
&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
= Wishlist =&lt;br /&gt;
&lt;br /&gt;
== Ballroom Area ==&lt;br /&gt;
* balance ballroom fans&lt;br /&gt;
&lt;br /&gt;
=== Bar ===&lt;br /&gt;
* Determine fix for leaking sink in 3-sink (weld?) - southmost sink (on left if you are behind bar)&lt;br /&gt;
* Install floor sink under 3-sink as per health code&lt;br /&gt;
&lt;br /&gt;
=== Crow&amp;#039;s Nest ===&lt;br /&gt;
* Make main (east) door to this room better fitting / gasketed against all air gaps so it functions for soundproofing&lt;br /&gt;
* rebalance fan&lt;br /&gt;
* ensure balcony hatch is robust enough to support 300lb standing weight&lt;br /&gt;
* Refinish &amp;amp; airgap-seal east wall above loft in this room so room functions as soundproofing / air barrier to exterior of bldg&lt;br /&gt;
* make north door to romeo &amp;amp; juliet balcony airtight (or better fitting) for turning this room into a soundproofing barrier&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine Bathroom ===&lt;br /&gt;
* active ventilation needs to be wired &amp;amp; installed (exhaust) in current ventilation window&lt;br /&gt;
* install door stop so the door can be propped open sometimes.&lt;br /&gt;
&lt;br /&gt;
=== Stage ===&lt;br /&gt;
* Create wider storage openings under stage. Not insubstantial. See stage storage build plan.&lt;br /&gt;
&lt;br /&gt;
=== Ticketbooth Room ===&lt;br /&gt;
* Install threshold plate to base of jamb (no more than 1/2&amp;quot; high as per ADA) to cut down on sound from ballroom &lt;br /&gt;
* install gaskets to door jambs to cut down on sound. (icarus)&lt;br /&gt;
* Install door closer&lt;br /&gt;
&lt;br /&gt;
== Basement ==&lt;br /&gt;
&lt;br /&gt;
=== kitchen ===&lt;br /&gt;
* Resurface kitchen floor, cover with quarry tile, or seal / treat concrete&lt;br /&gt;
* Fix or replace corroded window frames along shattuck&lt;br /&gt;
* Cut in mop sink in westmost pantry area&lt;br /&gt;
* Acquire and install tankless water heater, check gas line diameter &amp;amp; exhaust ductwork &lt;br /&gt;
* Purchase and affix Class-K extinguisher at correct height&lt;br /&gt;
* Cover exposed wiring in FNB locked-pantry ceiling (with e.g. metal plate)&lt;br /&gt;
* Install Ansul fire-suppression in hood&lt;br /&gt;
* Replace entire 4&amp;#039; flourescent light fixture closest to stove (has 1x broken tube holder)&lt;br /&gt;
* Acquire makeup air into kitchen (remove desk fan from duct, replace with something to code - 95% of hood CFM)&lt;br /&gt;
* Put closers on both basement kitchen doors&lt;br /&gt;
* steam clean stove hood&lt;br /&gt;
* Knock out / expand west kitchen wall to next-west supporting pipe&lt;br /&gt;
* Remove firred-out drywall, cover with FRP&lt;br /&gt;
&lt;br /&gt;
== Front Area ==&lt;br /&gt;
* fix broken glass pane in 4th window west of front door in La Commune&lt;br /&gt;
&lt;br /&gt;
=== Balcony ===&lt;br /&gt;
&lt;br /&gt;
* between fridges: get an exterior outlet plastic cover for 4&amp;quot;x4&amp;quot; outlet box here, so outlets do not get wet if it rains when roof hatch is open&lt;br /&gt;
* ~6&amp;quot; high barrier along balcony (to stop drinks etc from being knocked off onto those in cafe)&lt;br /&gt;
* bathroom: install ceiling exhaust fan&lt;br /&gt;
&lt;br /&gt;
=== TIL ===&lt;br /&gt;
* Get clear cover to put over wall switch for old electric timer in wall in big bookshelf unit in south wall of TIL&lt;br /&gt;
&lt;br /&gt;
== Disco Room ==&lt;br /&gt;
* test linoleum for asbestos content&lt;br /&gt;
* remove linoleum (may need to hire certified abatement company if asbestos present)&lt;br /&gt;
* sand wood floor and seal with water based polyurethane&lt;br /&gt;
* all A/V &amp;amp; musical equipment (including in crow&amp;#039;s nest) needs to be recorded (serial #s) and ownership determined&lt;br /&gt;
* ensure remaining shelving along north wall of disco room is fixed/affixed more safely&lt;br /&gt;
* pendant lights should probably be raised a bit higher up (low priority)&lt;br /&gt;
* pendant light switch(es): consider replacing with dimmers&lt;br /&gt;
* lightswitch cover near 48th st door should be replaced with one with less-sharp edges (better-sized)&lt;br /&gt;
* weight load for high-up triangular shelves in corners to be assessed (julia) to determine if speakers etc can be placed there&lt;/div&gt;</summary>
		<author><name>Kkr</name></author>
	</entry>
	<entry>
		<id>https://omnicommons.org/mediawiki/index.php?title=ToFix&amp;diff=3915</id>
		<title>ToFix</title>
		<link rel="alternate" type="text/html" href="https://omnicommons.org/mediawiki/index.php?title=ToFix&amp;diff=3915"/>
		<updated>2015-08-26T21:25:44Z</updated>

		<summary type="html">&lt;p&gt;Kkr: /* balcony */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;stuff in the building to fix&lt;br /&gt;
&lt;br /&gt;
==General==&lt;br /&gt;
Remove all extension cords, replace with conduit or install outlets if necessary&lt;br /&gt;
&lt;br /&gt;
== Ballroom ==&lt;br /&gt;
&lt;br /&gt;
=== Bar ===&lt;br /&gt;
&lt;br /&gt;
* Outlets on east/shattuck-side wall need to be: removed, wire-nutted, wrapped in elec tape, covered with blank faceplates. TURN OFF CIRCUIT FIRST. Note: furthest N outlet not disconnected, only outlet in the center of the wall&lt;br /&gt;
* sink needs to have hole/leak repaired (stainless steel), and possibly re-mounted / re-caulked.&lt;br /&gt;
** Need to remove blue masonite tabletop as it is weighing the sink down! Modify and return as actual cabinetry / surface.&lt;br /&gt;
&lt;br /&gt;
=== Ballroom-Shattuck Exit Area ===&lt;br /&gt;
* install light cover into flourescent panel (22&amp;quot;x3&amp;#039;) - flourescents are 2x 2&amp;#039; bulbs&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine ===&lt;br /&gt;
* SW staircase up: Repair hole in south wall near floor immediately across from stairs (see south wall acoustic treatment)&lt;br /&gt;
* SW &amp;amp; SE staircases: motion detectors up &amp;amp; down&lt;br /&gt;
* SW &amp;amp; SE staircases: LED strip lighting on each side&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine Bathroom ===&lt;br /&gt;
* outlet needs to be replaced with GFCI - Note: no ground; Gerald suggests decommissioning and installing new grounded plug in wall just above counter; go into wall from other side, need to locate grounded location&lt;br /&gt;
* all exposed bulb fixtures need be replaced with covered fixtures (2x)&lt;br /&gt;
* Install paper towell holder&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine &amp;quot;Book Room&amp;quot; ===&lt;br /&gt;
* 4&amp;quot;x4&amp;quot; Outlets affixed to top of Electrical subpanel must be removed from subpanel, and affixed to balcony (code violation) (3x)&lt;br /&gt;
&lt;br /&gt;
=== Crow&amp;#039;s Nest ===&lt;br /&gt;
* Clear everything 3&amp;#039; in front of electrical subpanel including all cords, lighitng, etc&lt;br /&gt;
* acquire &amp;amp; install cover for light (fixture takes glass orb / cover around bulb, it is missing)&lt;br /&gt;
* extend balcony railing to out in front of balcony hatch - on E side of R&amp;amp;J balcony (building &amp;amp; osha safety)&lt;br /&gt;
&lt;br /&gt;
=== A/V Room ===&lt;br /&gt;
* Patch long thinnish strip above door where conduit is exposed.&lt;br /&gt;
* &amp;lt;s&amp;gt;Patch hole near floor in NW corner of this room near door jamb.&amp;lt;/s&amp;gt; &amp;lt;--needs another coat but effectively done&lt;br /&gt;
&lt;br /&gt;
=== Ticketbooth Room ===&lt;br /&gt;
* Patch small hole in ceiling corner above ticket window where new conduit was run. &lt;br /&gt;
* install new outlet (existing is cracked and not attached to wall&lt;br /&gt;
&lt;br /&gt;
== Front Area == &lt;br /&gt;
* cover floor sink behind front counter area w minimum 3/4&amp;quot; plywood cut out and sealant (trip hazard/health)&lt;br /&gt;
* build secure mailbox&lt;br /&gt;
&lt;br /&gt;
=== balcony ===&lt;br /&gt;
* 4&amp;#039;x2&amp;#039; light fixture panel cover&lt;br /&gt;
* &amp;lt;s&amp;gt;install paper towel dispenser&amp;lt;/s&amp;gt; and paper towels &amp;lt;----hung the paper towel dispenser, need to install a 2nd screw for stability + locate paper towels =p -kkr&lt;br /&gt;
* bathroom: Replace light fixture (sub-8&amp;#039;) with standard caged bell-jar type&lt;br /&gt;
* between fridges: Lock roofer&amp;#039;s ladder (that lives b/t fridges in balcony) to wall. &lt;br /&gt;
* kitchenette: replace CFL bulb in kitchen with &amp;#039;safe&amp;#039; LED (silicone-wrapped kind) spot shape - e.g. for food safety if CFL breaks&lt;br /&gt;
&lt;br /&gt;
=== TIL ===&lt;br /&gt;
* cover exposed wires in east wall (near bookshelf). can use a plate&lt;br /&gt;
* get clear cover to put over wall switch for old electric timer in wall in big bookshelf unit in south wall of TL&lt;br /&gt;
&lt;br /&gt;
== Basement ==&lt;br /&gt;
&lt;br /&gt;
* south wall: close holes in basement wall where opened to remove mold.&lt;br /&gt;
* Phat Beets room ventilation doesn&amp;#039;t work. people can suffocate in there.&lt;br /&gt;
* repair red stage&lt;br /&gt;
* clear remaining junk&lt;br /&gt;
&lt;br /&gt;
=== ceiling ===&lt;br /&gt;
* Acquire &amp;amp; install light fixture covers for the 4&amp;#039; flourescent fixtures in basement offices (bunker rooms) - roughly ~48&amp;quot;x16&amp;quot;. &lt;br /&gt;
* install protective bulb covers over remaining working 8&amp;#039; flourescents: 6x&lt;br /&gt;
* unscrew piece of broken lightbulb from East basement hallway, replace bare-bulb fixture with covered fixture&lt;br /&gt;
* re-attach and restore service to entire strip of 8&amp;#039; flourescents along west wall (closest to sudo) that had been decommissioned&lt;br /&gt;
* acquire and affix 1&amp;#039;x1&amp;#039; ceiling tiles in NW corner of basement, so lighting fixture &amp;amp; strip of lights can be re-connected. ~120 tiles&lt;br /&gt;
* Cut &amp;amp; attach drywall AND then also affix 1&amp;#039;x1&amp;#039; ceiling tiles to exposed ceiling areas in basement (2 areas)&lt;br /&gt;
* Replace bad ballast in any 8&amp;#039; flourescent fixture (that is not turning on. If not sure try lights in it that do work in another fixture.&lt;br /&gt;
&lt;br /&gt;
== Bocce Court ==&lt;br /&gt;
* hallway: install paper towel dispenser and paper towels&lt;br /&gt;
* entire room perimeter - 5LB ABC fire extinguishers at correct height every ~75&amp;#039; - starting w under each exit sign&lt;br /&gt;
&lt;br /&gt;
===  Sudo ===&lt;br /&gt;
* created dedicated space for storing excess lumber (long pieces), pipe, metal pieces, etc so they are not in jumbles (fire code).&lt;br /&gt;
* west wall - run more 3/4&amp;quot; conduit further down west wall. Must know code.&lt;br /&gt;
&lt;br /&gt;
=== CCL ===&lt;br /&gt;
* run new conduit / circuits to reduce excessive extension cord usage (fire code)&lt;br /&gt;
* west closet: clean up &amp;amp; seal west wall&lt;br /&gt;
* west closet: put bulb covers over the 2x 4&amp;#039; flourescents&lt;br /&gt;
* west closet: put bulb covers over the 2x 4&amp;#039; flourescents in annex/closet&lt;br /&gt;
* west closet: replace ballast in flourescent fixture in this room&lt;br /&gt;
* east closet: cover exposed octogon junction box in ceiling with appropriate octogon plate&lt;br /&gt;
* east closet: replace exposed wiring from new LED fixture to ceiling with armored flex or EMT&lt;br /&gt;
&lt;br /&gt;
== Disco Room ==&lt;br /&gt;
* light switch cover near 48th street door should be replaced by one with less-sharp edges (better-sized)&lt;br /&gt;
* giant lateral file cabinet needs to be removed / find a better home somewhere JOHN GIVENS TO REMOVE - email photo&lt;br /&gt;
* Trace &amp;amp; label ALL elec outlets in this room&lt;br /&gt;
* A/V instructions need to be made for home stereo / speaker setup, mixer in crows nest etc. in this room&lt;br /&gt;
* West exit door (top landing to 48th st staircase) needs be panic bar&amp;#039;d&lt;br /&gt;
* install closer to main (east) door of disco room&lt;br /&gt;
* install closer to west / emergency exit door of disco room&lt;br /&gt;
* remove or permanently mount ALL LARGE UNMOUNTED PLATE GLASS MIRRORS in this room: safety hazard&lt;br /&gt;
* hole in wall in west staircase down to 48th needs be covered&lt;br /&gt;
* plate to be installed to cover exposed ceiling wires immediately in front of 48th st street door leading up to disco room&lt;br /&gt;
* crow&amp;#039;s nest: giant hole in crows nest west wall needs to be a) filled with insulation b) covered (drywall etc)&lt;br /&gt;
* crow&amp;#039;s nest west wall: exposed electrical wires / fixture needs to be covered (and traced)&lt;br /&gt;
&lt;br /&gt;
== Rise Above ==&lt;br /&gt;
* replaced busted circuit breaker in every electrial panel (like in the 42 breaker panel) with either working breaker or factory blanks.&lt;br /&gt;
* remove 2x6 on ceiling on south side of room (COORDINATE WITH GABRIELA 1ST - move or cover all her stuff.&lt;br /&gt;
* stage left - install paper towel dispenser and paper towels.&lt;br /&gt;
&lt;br /&gt;
&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&lt;br /&gt;
= Doors =&lt;br /&gt;
&lt;br /&gt;
=== shattuck-ballroom outer ===&lt;br /&gt;
* need panic bars&lt;br /&gt;
&lt;br /&gt;
=== shattuck-ballroom inner ===&lt;br /&gt;
* needs to be hung, closers, panic bars&lt;br /&gt;
&lt;br /&gt;
=== cafe-basement (big white door) ===&lt;br /&gt;
* needs closer&lt;br /&gt;
* fix panic bar&lt;br /&gt;
&lt;br /&gt;
=== bocce hallway ===&lt;br /&gt;
* needs rehang, closer, panic bar, lock&lt;br /&gt;
&lt;br /&gt;
=== bocce-basement ===&lt;br /&gt;
* if possible, put closer on this door (may not be possible)&lt;br /&gt;
&lt;br /&gt;
=== bocce-ballroom ===&lt;br /&gt;
* closer&lt;br /&gt;
&lt;br /&gt;
=== mezzanine book room ===&lt;br /&gt;
* Replace door handle with non-locking handle.&lt;br /&gt;
&lt;br /&gt;
=== opal ===&lt;br /&gt;
* Install real doorknob, remove latch&lt;br /&gt;
&lt;br /&gt;
=== rise above ===&lt;br /&gt;
* replace locking main door to Rise Above in hallway with twenty minute solid-core (fire-code)&lt;br /&gt;
* replace 2x hollow-core sliding doors with 20 minutes solid-core sliding doors (fire-code)&lt;br /&gt;
* put closer on main door to Rise Above&lt;br /&gt;
&lt;br /&gt;
=== Blue Room ===&lt;br /&gt;
* to hallway: closer&lt;br /&gt;
* to ballroom: closer&lt;br /&gt;
&lt;br /&gt;
&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
= Wishlist =&lt;br /&gt;
&lt;br /&gt;
== Ballroom Area ==&lt;br /&gt;
* balance ballroom fans&lt;br /&gt;
&lt;br /&gt;
=== Bar ===&lt;br /&gt;
* Determine fix for leaking sink in 3-sink (weld?) - southmost sink (on left if you are behind bar)&lt;br /&gt;
* Install floor sink under 3-sink as per health code&lt;br /&gt;
&lt;br /&gt;
=== Crow&amp;#039;s Nest ===&lt;br /&gt;
* Make main (east) door to this room better fitting / gasketed against all air gaps so it functions for soundproofing&lt;br /&gt;
* rebalance fan&lt;br /&gt;
* ensure balcony hatch is robust enough to support 300lb standing weight&lt;br /&gt;
* Refinish &amp;amp; airgap-seal east wall above loft in this room so room functions as soundproofing / air barrier to exterior of bldg&lt;br /&gt;
* make north door to romeo &amp;amp; juliet balcony airtight (or better fitting) for turning this room into a soundproofing barrier&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine Bathroom ===&lt;br /&gt;
* active ventilation needs to be wired &amp;amp; installed (exhaust) in current ventilation window&lt;br /&gt;
* install door stop so the door can be propped open sometimes.&lt;br /&gt;
&lt;br /&gt;
=== Stage ===&lt;br /&gt;
* Create wider storage openings under stage. Not insubstantial. See stage storage build plan.&lt;br /&gt;
&lt;br /&gt;
=== Ticketbooth Room ===&lt;br /&gt;
* Install threshold plate to base of jamb (no more than 1/2&amp;quot; high as per ADA) to cut down on sound from ballroom &lt;br /&gt;
* install gaskets to door jambs to cut down on sound. (icarus)&lt;br /&gt;
* Install door closer&lt;br /&gt;
&lt;br /&gt;
== Basement ==&lt;br /&gt;
&lt;br /&gt;
=== kitchen ===&lt;br /&gt;
* Resurface kitchen floor, cover with quarry tile, or seal / treat concrete&lt;br /&gt;
* Fix or replace corroded window frames along shattuck&lt;br /&gt;
* Cut in mop sink in westmost pantry area&lt;br /&gt;
* Acquire and install tankless water heater, check gas line diameter &amp;amp; exhaust ductwork &lt;br /&gt;
* Purchase and affix Class-K extinguisher at correct height&lt;br /&gt;
* Cover exposed wiring in FNB locked-pantry ceiling (with e.g. metal plate)&lt;br /&gt;
* Install Ansul fire-suppression in hood&lt;br /&gt;
* Replace entire 4&amp;#039; flourescent light fixture closest to stove (has 1x broken tube holder)&lt;br /&gt;
* Acquire makeup air into kitchen (remove desk fan from duct, replace with something to code - 95% of hood CFM)&lt;br /&gt;
* Put closers on both basement kitchen doors&lt;br /&gt;
* steam clean stove hood&lt;br /&gt;
* Knock out / expand west kitchen wall to next-west supporting pipe&lt;br /&gt;
* Remove firred-out drywall, cover with FRP&lt;br /&gt;
&lt;br /&gt;
== Front Area ==&lt;br /&gt;
* fix broken glass pane in 4th window west of front door in La Commune&lt;br /&gt;
&lt;br /&gt;
=== Balcony ===&lt;br /&gt;
&lt;br /&gt;
* between fridges: get an exterior outlet plastic cover for 4&amp;quot;x4&amp;quot; outlet box here, so outlets do not get wet if it rains when roof hatch is open&lt;br /&gt;
* ~6&amp;quot; high barrier along balcony (to stop drinks etc from being knocked off onto those in cafe)&lt;br /&gt;
* bathroom: install ceiling exhaust fan&lt;br /&gt;
&lt;br /&gt;
=== TIL ===&lt;br /&gt;
* Get clear cover to put over wall switch for old electric timer in wall in big bookshelf unit in south wall of TIL&lt;br /&gt;
&lt;br /&gt;
== Disco Room ==&lt;br /&gt;
* test linoleum for asbestos content&lt;br /&gt;
* remove linoleum (may need to hire certified abatement company if asbestos present)&lt;br /&gt;
* sand wood floor and seal with water based polyurethane&lt;br /&gt;
* all A/V &amp;amp; musical equipment (including in crow&amp;#039;s nest) needs to be recorded (serial #s) and ownership determined&lt;br /&gt;
* ensure remaining shelving along north wall of disco room is fixed/affixed more safely&lt;br /&gt;
* pendant lights should probably be raised a bit higher up (low priority)&lt;br /&gt;
* pendant light switch(es): consider replacing with dimmers&lt;br /&gt;
* lightswitch cover near 48th st door should be replaced with one with less-sharp edges (better-sized)&lt;br /&gt;
* weight load for high-up triangular shelves in corners to be assessed (julia) to determine if speakers etc can be placed there&lt;/div&gt;</summary>
		<author><name>Kkr</name></author>
	</entry>
	<entry>
		<id>https://omnicommons.org/mediawiki/index.php?title=ToFix&amp;diff=3914</id>
		<title>ToFix</title>
		<link rel="alternate" type="text/html" href="https://omnicommons.org/mediawiki/index.php?title=ToFix&amp;diff=3914"/>
		<updated>2015-08-26T21:13:36Z</updated>

		<summary type="html">&lt;p&gt;Kkr: /* A/V Room */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;stuff in the building to fix&lt;br /&gt;
&lt;br /&gt;
==General==&lt;br /&gt;
Remove all extension cords, replace with conduit or install outlets if necessary&lt;br /&gt;
&lt;br /&gt;
== Ballroom ==&lt;br /&gt;
&lt;br /&gt;
=== Bar ===&lt;br /&gt;
&lt;br /&gt;
* Outlets on east/shattuck-side wall need to be: removed, wire-nutted, wrapped in elec tape, covered with blank faceplates. TURN OFF CIRCUIT FIRST. Note: furthest N outlet not disconnected, only outlet in the center of the wall&lt;br /&gt;
* sink needs to have hole/leak repaired (stainless steel), and possibly re-mounted / re-caulked.&lt;br /&gt;
** Need to remove blue masonite tabletop as it is weighing the sink down! Modify and return as actual cabinetry / surface.&lt;br /&gt;
&lt;br /&gt;
=== Ballroom-Shattuck Exit Area ===&lt;br /&gt;
* install light cover into flourescent panel (22&amp;quot;x3&amp;#039;) - flourescents are 2x 2&amp;#039; bulbs&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine ===&lt;br /&gt;
* SW staircase up: Repair hole in south wall near floor immediately across from stairs (see south wall acoustic treatment)&lt;br /&gt;
* SW &amp;amp; SE staircases: motion detectors up &amp;amp; down&lt;br /&gt;
* SW &amp;amp; SE staircases: LED strip lighting on each side&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine Bathroom ===&lt;br /&gt;
* outlet needs to be replaced with GFCI - Note: no ground; Gerald suggests decommissioning and installing new grounded plug in wall just above counter; go into wall from other side, need to locate grounded location&lt;br /&gt;
* all exposed bulb fixtures need be replaced with covered fixtures (2x)&lt;br /&gt;
* Install paper towell holder&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine &amp;quot;Book Room&amp;quot; ===&lt;br /&gt;
* 4&amp;quot;x4&amp;quot; Outlets affixed to top of Electrical subpanel must be removed from subpanel, and affixed to balcony (code violation) (3x)&lt;br /&gt;
&lt;br /&gt;
=== Crow&amp;#039;s Nest ===&lt;br /&gt;
* Clear everything 3&amp;#039; in front of electrical subpanel including all cords, lighitng, etc&lt;br /&gt;
* acquire &amp;amp; install cover for light (fixture takes glass orb / cover around bulb, it is missing)&lt;br /&gt;
* extend balcony railing to out in front of balcony hatch - on E side of R&amp;amp;J balcony (building &amp;amp; osha safety)&lt;br /&gt;
&lt;br /&gt;
=== A/V Room ===&lt;br /&gt;
* Patch long thinnish strip above door where conduit is exposed.&lt;br /&gt;
* &amp;lt;s&amp;gt;Patch hole near floor in NW corner of this room near door jamb.&amp;lt;/s&amp;gt; &amp;lt;--needs another coat but effectively done&lt;br /&gt;
&lt;br /&gt;
=== Ticketbooth Room ===&lt;br /&gt;
* Patch small hole in ceiling corner above ticket window where new conduit was run. &lt;br /&gt;
* install new outlet (existing is cracked and not attached to wall&lt;br /&gt;
&lt;br /&gt;
== Front Area == &lt;br /&gt;
* cover floor sink behind front counter area w minimum 3/4&amp;quot; plywood cut out and sealant (trip hazard/health)&lt;br /&gt;
* build secure mailbox&lt;br /&gt;
&lt;br /&gt;
=== balcony ===&lt;br /&gt;
* 4&amp;#039;x2&amp;#039; light fixture panel cover&lt;br /&gt;
* install paper towel dispenser and paper towels&lt;br /&gt;
* bathroom: Replace light fixture (sub-8&amp;#039;) with standard caged bell-jar type&lt;br /&gt;
* between fridges: Lock roofer&amp;#039;s ladder (that lives b/t fridges in balcony) to wall. &lt;br /&gt;
* kitchenette: replace CFL bulb in kitchen with &amp;#039;safe&amp;#039; LED (silicone-wrapped kind) spot shape - e.g. for food safety if CFL breaks&lt;br /&gt;
&lt;br /&gt;
=== TIL ===&lt;br /&gt;
* cover exposed wires in east wall (near bookshelf). can use a plate&lt;br /&gt;
* get clear cover to put over wall switch for old electric timer in wall in big bookshelf unit in south wall of TL&lt;br /&gt;
&lt;br /&gt;
== Basement ==&lt;br /&gt;
&lt;br /&gt;
* south wall: close holes in basement wall where opened to remove mold.&lt;br /&gt;
* Phat Beets room ventilation doesn&amp;#039;t work. people can suffocate in there.&lt;br /&gt;
* repair red stage&lt;br /&gt;
* clear remaining junk&lt;br /&gt;
&lt;br /&gt;
=== ceiling ===&lt;br /&gt;
* Acquire &amp;amp; install light fixture covers for the 4&amp;#039; flourescent fixtures in basement offices (bunker rooms) - roughly ~48&amp;quot;x16&amp;quot;. &lt;br /&gt;
* install protective bulb covers over remaining working 8&amp;#039; flourescents: 6x&lt;br /&gt;
* unscrew piece of broken lightbulb from East basement hallway, replace bare-bulb fixture with covered fixture&lt;br /&gt;
* re-attach and restore service to entire strip of 8&amp;#039; flourescents along west wall (closest to sudo) that had been decommissioned&lt;br /&gt;
* acquire and affix 1&amp;#039;x1&amp;#039; ceiling tiles in NW corner of basement, so lighting fixture &amp;amp; strip of lights can be re-connected. ~120 tiles&lt;br /&gt;
* Cut &amp;amp; attach drywall AND then also affix 1&amp;#039;x1&amp;#039; ceiling tiles to exposed ceiling areas in basement (2 areas)&lt;br /&gt;
* Replace bad ballast in any 8&amp;#039; flourescent fixture (that is not turning on. If not sure try lights in it that do work in another fixture.&lt;br /&gt;
&lt;br /&gt;
== Bocce Court ==&lt;br /&gt;
* hallway: install paper towel dispenser and paper towels&lt;br /&gt;
* entire room perimeter - 5LB ABC fire extinguishers at correct height every ~75&amp;#039; - starting w under each exit sign&lt;br /&gt;
&lt;br /&gt;
===  Sudo ===&lt;br /&gt;
* created dedicated space for storing excess lumber (long pieces), pipe, metal pieces, etc so they are not in jumbles (fire code).&lt;br /&gt;
* west wall - run more 3/4&amp;quot; conduit further down west wall. Must know code.&lt;br /&gt;
&lt;br /&gt;
=== CCL ===&lt;br /&gt;
* run new conduit / circuits to reduce excessive extension cord usage (fire code)&lt;br /&gt;
* west closet: clean up &amp;amp; seal west wall&lt;br /&gt;
* west closet: put bulb covers over the 2x 4&amp;#039; flourescents&lt;br /&gt;
* west closet: put bulb covers over the 2x 4&amp;#039; flourescents in annex/closet&lt;br /&gt;
* west closet: replace ballast in flourescent fixture in this room&lt;br /&gt;
* east closet: cover exposed octogon junction box in ceiling with appropriate octogon plate&lt;br /&gt;
* east closet: replace exposed wiring from new LED fixture to ceiling with armored flex or EMT&lt;br /&gt;
&lt;br /&gt;
== Disco Room ==&lt;br /&gt;
* light switch cover near 48th street door should be replaced by one with less-sharp edges (better-sized)&lt;br /&gt;
* giant lateral file cabinet needs to be removed / find a better home somewhere JOHN GIVENS TO REMOVE - email photo&lt;br /&gt;
* Trace &amp;amp; label ALL elec outlets in this room&lt;br /&gt;
* A/V instructions need to be made for home stereo / speaker setup, mixer in crows nest etc. in this room&lt;br /&gt;
* West exit door (top landing to 48th st staircase) needs be panic bar&amp;#039;d&lt;br /&gt;
* install closer to main (east) door of disco room&lt;br /&gt;
* install closer to west / emergency exit door of disco room&lt;br /&gt;
* remove or permanently mount ALL LARGE UNMOUNTED PLATE GLASS MIRRORS in this room: safety hazard&lt;br /&gt;
* hole in wall in west staircase down to 48th needs be covered&lt;br /&gt;
* plate to be installed to cover exposed ceiling wires immediately in front of 48th st street door leading up to disco room&lt;br /&gt;
* crow&amp;#039;s nest: giant hole in crows nest west wall needs to be a) filled with insulation b) covered (drywall etc)&lt;br /&gt;
* crow&amp;#039;s nest west wall: exposed electrical wires / fixture needs to be covered (and traced)&lt;br /&gt;
&lt;br /&gt;
== Rise Above ==&lt;br /&gt;
* replaced busted circuit breaker in every electrial panel (like in the 42 breaker panel) with either working breaker or factory blanks.&lt;br /&gt;
* remove 2x6 on ceiling on south side of room (COORDINATE WITH GABRIELA 1ST - move or cover all her stuff.&lt;br /&gt;
* stage left - install paper towel dispenser and paper towels.&lt;br /&gt;
&lt;br /&gt;
&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&lt;br /&gt;
= Doors =&lt;br /&gt;
&lt;br /&gt;
=== shattuck-ballroom outer ===&lt;br /&gt;
* need panic bars&lt;br /&gt;
&lt;br /&gt;
=== shattuck-ballroom inner ===&lt;br /&gt;
* needs to be hung, closers, panic bars&lt;br /&gt;
&lt;br /&gt;
=== cafe-basement (big white door) ===&lt;br /&gt;
* needs closer&lt;br /&gt;
* fix panic bar&lt;br /&gt;
&lt;br /&gt;
=== bocce hallway ===&lt;br /&gt;
* needs rehang, closer, panic bar, lock&lt;br /&gt;
&lt;br /&gt;
=== bocce-basement ===&lt;br /&gt;
* if possible, put closer on this door (may not be possible)&lt;br /&gt;
&lt;br /&gt;
=== bocce-ballroom ===&lt;br /&gt;
* closer&lt;br /&gt;
&lt;br /&gt;
=== mezzanine book room ===&lt;br /&gt;
* Replace door handle with non-locking handle.&lt;br /&gt;
&lt;br /&gt;
=== opal ===&lt;br /&gt;
* Install real doorknob, remove latch&lt;br /&gt;
&lt;br /&gt;
=== rise above ===&lt;br /&gt;
* replace locking main door to Rise Above in hallway with twenty minute solid-core (fire-code)&lt;br /&gt;
* replace 2x hollow-core sliding doors with 20 minutes solid-core sliding doors (fire-code)&lt;br /&gt;
* put closer on main door to Rise Above&lt;br /&gt;
&lt;br /&gt;
=== Blue Room ===&lt;br /&gt;
* to hallway: closer&lt;br /&gt;
* to ballroom: closer&lt;br /&gt;
&lt;br /&gt;
&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
= Wishlist =&lt;br /&gt;
&lt;br /&gt;
== Ballroom Area ==&lt;br /&gt;
* balance ballroom fans&lt;br /&gt;
&lt;br /&gt;
=== Bar ===&lt;br /&gt;
* Determine fix for leaking sink in 3-sink (weld?) - southmost sink (on left if you are behind bar)&lt;br /&gt;
* Install floor sink under 3-sink as per health code&lt;br /&gt;
&lt;br /&gt;
=== Crow&amp;#039;s Nest ===&lt;br /&gt;
* Make main (east) door to this room better fitting / gasketed against all air gaps so it functions for soundproofing&lt;br /&gt;
* rebalance fan&lt;br /&gt;
* ensure balcony hatch is robust enough to support 300lb standing weight&lt;br /&gt;
* Refinish &amp;amp; airgap-seal east wall above loft in this room so room functions as soundproofing / air barrier to exterior of bldg&lt;br /&gt;
* make north door to romeo &amp;amp; juliet balcony airtight (or better fitting) for turning this room into a soundproofing barrier&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine Bathroom ===&lt;br /&gt;
* active ventilation needs to be wired &amp;amp; installed (exhaust) in current ventilation window&lt;br /&gt;
* install door stop so the door can be propped open sometimes.&lt;br /&gt;
&lt;br /&gt;
=== Stage ===&lt;br /&gt;
* Create wider storage openings under stage. Not insubstantial. See stage storage build plan.&lt;br /&gt;
&lt;br /&gt;
=== Ticketbooth Room ===&lt;br /&gt;
* Install threshold plate to base of jamb (no more than 1/2&amp;quot; high as per ADA) to cut down on sound from ballroom &lt;br /&gt;
* install gaskets to door jambs to cut down on sound. (icarus)&lt;br /&gt;
* Install door closer&lt;br /&gt;
&lt;br /&gt;
== Basement ==&lt;br /&gt;
&lt;br /&gt;
=== kitchen ===&lt;br /&gt;
* Resurface kitchen floor, cover with quarry tile, or seal / treat concrete&lt;br /&gt;
* Fix or replace corroded window frames along shattuck&lt;br /&gt;
* Cut in mop sink in westmost pantry area&lt;br /&gt;
* Acquire and install tankless water heater, check gas line diameter &amp;amp; exhaust ductwork &lt;br /&gt;
* Purchase and affix Class-K extinguisher at correct height&lt;br /&gt;
* Cover exposed wiring in FNB locked-pantry ceiling (with e.g. metal plate)&lt;br /&gt;
* Install Ansul fire-suppression in hood&lt;br /&gt;
* Replace entire 4&amp;#039; flourescent light fixture closest to stove (has 1x broken tube holder)&lt;br /&gt;
* Acquire makeup air into kitchen (remove desk fan from duct, replace with something to code - 95% of hood CFM)&lt;br /&gt;
* Put closers on both basement kitchen doors&lt;br /&gt;
* steam clean stove hood&lt;br /&gt;
* Knock out / expand west kitchen wall to next-west supporting pipe&lt;br /&gt;
* Remove firred-out drywall, cover with FRP&lt;br /&gt;
&lt;br /&gt;
== Front Area ==&lt;br /&gt;
* fix broken glass pane in 4th window west of front door in La Commune&lt;br /&gt;
&lt;br /&gt;
=== Balcony ===&lt;br /&gt;
&lt;br /&gt;
* between fridges: get an exterior outlet plastic cover for 4&amp;quot;x4&amp;quot; outlet box here, so outlets do not get wet if it rains when roof hatch is open&lt;br /&gt;
* ~6&amp;quot; high barrier along balcony (to stop drinks etc from being knocked off onto those in cafe)&lt;br /&gt;
* bathroom: install ceiling exhaust fan&lt;br /&gt;
&lt;br /&gt;
=== TIL ===&lt;br /&gt;
* Get clear cover to put over wall switch for old electric timer in wall in big bookshelf unit in south wall of TIL&lt;br /&gt;
&lt;br /&gt;
== Disco Room ==&lt;br /&gt;
* test linoleum for asbestos content&lt;br /&gt;
* remove linoleum (may need to hire certified abatement company if asbestos present)&lt;br /&gt;
* sand wood floor and seal with water based polyurethane&lt;br /&gt;
* all A/V &amp;amp; musical equipment (including in crow&amp;#039;s nest) needs to be recorded (serial #s) and ownership determined&lt;br /&gt;
* ensure remaining shelving along north wall of disco room is fixed/affixed more safely&lt;br /&gt;
* pendant lights should probably be raised a bit higher up (low priority)&lt;br /&gt;
* pendant light switch(es): consider replacing with dimmers&lt;br /&gt;
* lightswitch cover near 48th st door should be replaced with one with less-sharp edges (better-sized)&lt;br /&gt;
* weight load for high-up triangular shelves in corners to be assessed (julia) to determine if speakers etc can be placed there&lt;/div&gt;</summary>
		<author><name>Kkr</name></author>
	</entry>
	<entry>
		<id>https://omnicommons.org/mediawiki/index.php?title=ToFix&amp;diff=3913</id>
		<title>ToFix</title>
		<link rel="alternate" type="text/html" href="https://omnicommons.org/mediawiki/index.php?title=ToFix&amp;diff=3913"/>
		<updated>2015-08-26T21:12:41Z</updated>

		<summary type="html">&lt;p&gt;Kkr: /* A/V Room */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;stuff in the building to fix&lt;br /&gt;
&lt;br /&gt;
==General==&lt;br /&gt;
Remove all extension cords, replace with conduit or install outlets if necessary&lt;br /&gt;
&lt;br /&gt;
== Ballroom ==&lt;br /&gt;
&lt;br /&gt;
=== Bar ===&lt;br /&gt;
&lt;br /&gt;
* Outlets on east/shattuck-side wall need to be: removed, wire-nutted, wrapped in elec tape, covered with blank faceplates. TURN OFF CIRCUIT FIRST. Note: furthest N outlet not disconnected, only outlet in the center of the wall&lt;br /&gt;
* sink needs to have hole/leak repaired (stainless steel), and possibly re-mounted / re-caulked.&lt;br /&gt;
** Need to remove blue masonite tabletop as it is weighing the sink down! Modify and return as actual cabinetry / surface.&lt;br /&gt;
&lt;br /&gt;
=== Ballroom-Shattuck Exit Area ===&lt;br /&gt;
* install light cover into flourescent panel (22&amp;quot;x3&amp;#039;) - flourescents are 2x 2&amp;#039; bulbs&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine ===&lt;br /&gt;
* SW staircase up: Repair hole in south wall near floor immediately across from stairs (see south wall acoustic treatment)&lt;br /&gt;
* SW &amp;amp; SE staircases: motion detectors up &amp;amp; down&lt;br /&gt;
* SW &amp;amp; SE staircases: LED strip lighting on each side&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine Bathroom ===&lt;br /&gt;
* outlet needs to be replaced with GFCI - Note: no ground; Gerald suggests decommissioning and installing new grounded plug in wall just above counter; go into wall from other side, need to locate grounded location&lt;br /&gt;
* all exposed bulb fixtures need be replaced with covered fixtures (2x)&lt;br /&gt;
* Install paper towell holder&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine &amp;quot;Book Room&amp;quot; ===&lt;br /&gt;
* 4&amp;quot;x4&amp;quot; Outlets affixed to top of Electrical subpanel must be removed from subpanel, and affixed to balcony (code violation) (3x)&lt;br /&gt;
&lt;br /&gt;
=== Crow&amp;#039;s Nest ===&lt;br /&gt;
* Clear everything 3&amp;#039; in front of electrical subpanel including all cords, lighitng, etc&lt;br /&gt;
* acquire &amp;amp; install cover for light (fixture takes glass orb / cover around bulb, it is missing)&lt;br /&gt;
* extend balcony railing to out in front of balcony hatch - on E side of R&amp;amp;J balcony (building &amp;amp; osha safety)&lt;br /&gt;
&lt;br /&gt;
=== A/V Room ===&lt;br /&gt;
* Patch small hole above door where conduit is peeking through.&lt;br /&gt;
* &amp;lt;s&amp;gt;Patch hole near floor in NW corner of this room near door jamb.&amp;lt;/s&amp;gt; &amp;lt;--needs another coat but effectively done&lt;br /&gt;
&lt;br /&gt;
=== Ticketbooth Room ===&lt;br /&gt;
* Patch small hole in ceiling corner above ticket window where new conduit was run. &lt;br /&gt;
* install new outlet (existing is cracked and not attached to wall&lt;br /&gt;
&lt;br /&gt;
== Front Area == &lt;br /&gt;
* cover floor sink behind front counter area w minimum 3/4&amp;quot; plywood cut out and sealant (trip hazard/health)&lt;br /&gt;
* build secure mailbox&lt;br /&gt;
&lt;br /&gt;
=== balcony ===&lt;br /&gt;
* 4&amp;#039;x2&amp;#039; light fixture panel cover&lt;br /&gt;
* install paper towel dispenser and paper towels&lt;br /&gt;
* bathroom: Replace light fixture (sub-8&amp;#039;) with standard caged bell-jar type&lt;br /&gt;
* between fridges: Lock roofer&amp;#039;s ladder (that lives b/t fridges in balcony) to wall. &lt;br /&gt;
* kitchenette: replace CFL bulb in kitchen with &amp;#039;safe&amp;#039; LED (silicone-wrapped kind) spot shape - e.g. for food safety if CFL breaks&lt;br /&gt;
&lt;br /&gt;
=== TIL ===&lt;br /&gt;
* cover exposed wires in east wall (near bookshelf). can use a plate&lt;br /&gt;
* get clear cover to put over wall switch for old electric timer in wall in big bookshelf unit in south wall of TL&lt;br /&gt;
&lt;br /&gt;
== Basement ==&lt;br /&gt;
&lt;br /&gt;
* south wall: close holes in basement wall where opened to remove mold.&lt;br /&gt;
* Phat Beets room ventilation doesn&amp;#039;t work. people can suffocate in there.&lt;br /&gt;
* repair red stage&lt;br /&gt;
* clear remaining junk&lt;br /&gt;
&lt;br /&gt;
=== ceiling ===&lt;br /&gt;
* Acquire &amp;amp; install light fixture covers for the 4&amp;#039; flourescent fixtures in basement offices (bunker rooms) - roughly ~48&amp;quot;x16&amp;quot;. &lt;br /&gt;
* install protective bulb covers over remaining working 8&amp;#039; flourescents: 6x&lt;br /&gt;
* unscrew piece of broken lightbulb from East basement hallway, replace bare-bulb fixture with covered fixture&lt;br /&gt;
* re-attach and restore service to entire strip of 8&amp;#039; flourescents along west wall (closest to sudo) that had been decommissioned&lt;br /&gt;
* acquire and affix 1&amp;#039;x1&amp;#039; ceiling tiles in NW corner of basement, so lighting fixture &amp;amp; strip of lights can be re-connected. ~120 tiles&lt;br /&gt;
* Cut &amp;amp; attach drywall AND then also affix 1&amp;#039;x1&amp;#039; ceiling tiles to exposed ceiling areas in basement (2 areas)&lt;br /&gt;
* Replace bad ballast in any 8&amp;#039; flourescent fixture (that is not turning on. If not sure try lights in it that do work in another fixture.&lt;br /&gt;
&lt;br /&gt;
== Bocce Court ==&lt;br /&gt;
* hallway: install paper towel dispenser and paper towels&lt;br /&gt;
* entire room perimeter - 5LB ABC fire extinguishers at correct height every ~75&amp;#039; - starting w under each exit sign&lt;br /&gt;
&lt;br /&gt;
===  Sudo ===&lt;br /&gt;
* created dedicated space for storing excess lumber (long pieces), pipe, metal pieces, etc so they are not in jumbles (fire code).&lt;br /&gt;
* west wall - run more 3/4&amp;quot; conduit further down west wall. Must know code.&lt;br /&gt;
&lt;br /&gt;
=== CCL ===&lt;br /&gt;
* run new conduit / circuits to reduce excessive extension cord usage (fire code)&lt;br /&gt;
* west closet: clean up &amp;amp; seal west wall&lt;br /&gt;
* west closet: put bulb covers over the 2x 4&amp;#039; flourescents&lt;br /&gt;
* west closet: put bulb covers over the 2x 4&amp;#039; flourescents in annex/closet&lt;br /&gt;
* west closet: replace ballast in flourescent fixture in this room&lt;br /&gt;
* east closet: cover exposed octogon junction box in ceiling with appropriate octogon plate&lt;br /&gt;
* east closet: replace exposed wiring from new LED fixture to ceiling with armored flex or EMT&lt;br /&gt;
&lt;br /&gt;
== Disco Room ==&lt;br /&gt;
* light switch cover near 48th street door should be replaced by one with less-sharp edges (better-sized)&lt;br /&gt;
* giant lateral file cabinet needs to be removed / find a better home somewhere JOHN GIVENS TO REMOVE - email photo&lt;br /&gt;
* Trace &amp;amp; label ALL elec outlets in this room&lt;br /&gt;
* A/V instructions need to be made for home stereo / speaker setup, mixer in crows nest etc. in this room&lt;br /&gt;
* West exit door (top landing to 48th st staircase) needs be panic bar&amp;#039;d&lt;br /&gt;
* install closer to main (east) door of disco room&lt;br /&gt;
* install closer to west / emergency exit door of disco room&lt;br /&gt;
* remove or permanently mount ALL LARGE UNMOUNTED PLATE GLASS MIRRORS in this room: safety hazard&lt;br /&gt;
* hole in wall in west staircase down to 48th needs be covered&lt;br /&gt;
* plate to be installed to cover exposed ceiling wires immediately in front of 48th st street door leading up to disco room&lt;br /&gt;
* crow&amp;#039;s nest: giant hole in crows nest west wall needs to be a) filled with insulation b) covered (drywall etc)&lt;br /&gt;
* crow&amp;#039;s nest west wall: exposed electrical wires / fixture needs to be covered (and traced)&lt;br /&gt;
&lt;br /&gt;
== Rise Above ==&lt;br /&gt;
* replaced busted circuit breaker in every electrial panel (like in the 42 breaker panel) with either working breaker or factory blanks.&lt;br /&gt;
* remove 2x6 on ceiling on south side of room (COORDINATE WITH GABRIELA 1ST - move or cover all her stuff.&lt;br /&gt;
* stage left - install paper towel dispenser and paper towels.&lt;br /&gt;
&lt;br /&gt;
&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&lt;br /&gt;
= Doors =&lt;br /&gt;
&lt;br /&gt;
=== shattuck-ballroom outer ===&lt;br /&gt;
* need panic bars&lt;br /&gt;
&lt;br /&gt;
=== shattuck-ballroom inner ===&lt;br /&gt;
* needs to be hung, closers, panic bars&lt;br /&gt;
&lt;br /&gt;
=== cafe-basement (big white door) ===&lt;br /&gt;
* needs closer&lt;br /&gt;
* fix panic bar&lt;br /&gt;
&lt;br /&gt;
=== bocce hallway ===&lt;br /&gt;
* needs rehang, closer, panic bar, lock&lt;br /&gt;
&lt;br /&gt;
=== bocce-basement ===&lt;br /&gt;
* if possible, put closer on this door (may not be possible)&lt;br /&gt;
&lt;br /&gt;
=== bocce-ballroom ===&lt;br /&gt;
* closer&lt;br /&gt;
&lt;br /&gt;
=== mezzanine book room ===&lt;br /&gt;
* Replace door handle with non-locking handle.&lt;br /&gt;
&lt;br /&gt;
=== opal ===&lt;br /&gt;
* Install real doorknob, remove latch&lt;br /&gt;
&lt;br /&gt;
=== rise above ===&lt;br /&gt;
* replace locking main door to Rise Above in hallway with twenty minute solid-core (fire-code)&lt;br /&gt;
* replace 2x hollow-core sliding doors with 20 minutes solid-core sliding doors (fire-code)&lt;br /&gt;
* put closer on main door to Rise Above&lt;br /&gt;
&lt;br /&gt;
=== Blue Room ===&lt;br /&gt;
* to hallway: closer&lt;br /&gt;
* to ballroom: closer&lt;br /&gt;
&lt;br /&gt;
&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&amp;lt;br /&amp;gt;&lt;br /&gt;
&lt;br /&gt;
= Wishlist =&lt;br /&gt;
&lt;br /&gt;
== Ballroom Area ==&lt;br /&gt;
* balance ballroom fans&lt;br /&gt;
&lt;br /&gt;
=== Bar ===&lt;br /&gt;
* Determine fix for leaking sink in 3-sink (weld?) - southmost sink (on left if you are behind bar)&lt;br /&gt;
* Install floor sink under 3-sink as per health code&lt;br /&gt;
&lt;br /&gt;
=== Crow&amp;#039;s Nest ===&lt;br /&gt;
* Make main (east) door to this room better fitting / gasketed against all air gaps so it functions for soundproofing&lt;br /&gt;
* rebalance fan&lt;br /&gt;
* ensure balcony hatch is robust enough to support 300lb standing weight&lt;br /&gt;
* Refinish &amp;amp; airgap-seal east wall above loft in this room so room functions as soundproofing / air barrier to exterior of bldg&lt;br /&gt;
* make north door to romeo &amp;amp; juliet balcony airtight (or better fitting) for turning this room into a soundproofing barrier&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine Bathroom ===&lt;br /&gt;
* active ventilation needs to be wired &amp;amp; installed (exhaust) in current ventilation window&lt;br /&gt;
* install door stop so the door can be propped open sometimes.&lt;br /&gt;
&lt;br /&gt;
=== Stage ===&lt;br /&gt;
* Create wider storage openings under stage. Not insubstantial. See stage storage build plan.&lt;br /&gt;
&lt;br /&gt;
=== Ticketbooth Room ===&lt;br /&gt;
* Install threshold plate to base of jamb (no more than 1/2&amp;quot; high as per ADA) to cut down on sound from ballroom &lt;br /&gt;
* install gaskets to door jambs to cut down on sound. (icarus)&lt;br /&gt;
* Install door closer&lt;br /&gt;
&lt;br /&gt;
== Basement ==&lt;br /&gt;
&lt;br /&gt;
=== kitchen ===&lt;br /&gt;
* Resurface kitchen floor, cover with quarry tile, or seal / treat concrete&lt;br /&gt;
* Fix or replace corroded window frames along shattuck&lt;br /&gt;
* Cut in mop sink in westmost pantry area&lt;br /&gt;
* Acquire and install tankless water heater, check gas line diameter &amp;amp; exhaust ductwork &lt;br /&gt;
* Purchase and affix Class-K extinguisher at correct height&lt;br /&gt;
* Cover exposed wiring in FNB locked-pantry ceiling (with e.g. metal plate)&lt;br /&gt;
* Install Ansul fire-suppression in hood&lt;br /&gt;
* Replace entire 4&amp;#039; flourescent light fixture closest to stove (has 1x broken tube holder)&lt;br /&gt;
* Acquire makeup air into kitchen (remove desk fan from duct, replace with something to code - 95% of hood CFM)&lt;br /&gt;
* Put closers on both basement kitchen doors&lt;br /&gt;
* steam clean stove hood&lt;br /&gt;
* Knock out / expand west kitchen wall to next-west supporting pipe&lt;br /&gt;
* Remove firred-out drywall, cover with FRP&lt;br /&gt;
&lt;br /&gt;
== Front Area ==&lt;br /&gt;
* fix broken glass pane in 4th window west of front door in La Commune&lt;br /&gt;
&lt;br /&gt;
=== Balcony ===&lt;br /&gt;
&lt;br /&gt;
* between fridges: get an exterior outlet plastic cover for 4&amp;quot;x4&amp;quot; outlet box here, so outlets do not get wet if it rains when roof hatch is open&lt;br /&gt;
* ~6&amp;quot; high barrier along balcony (to stop drinks etc from being knocked off onto those in cafe)&lt;br /&gt;
* bathroom: install ceiling exhaust fan&lt;br /&gt;
&lt;br /&gt;
=== TIL ===&lt;br /&gt;
* Get clear cover to put over wall switch for old electric timer in wall in big bookshelf unit in south wall of TIL&lt;br /&gt;
&lt;br /&gt;
== Disco Room ==&lt;br /&gt;
* test linoleum for asbestos content&lt;br /&gt;
* remove linoleum (may need to hire certified abatement company if asbestos present)&lt;br /&gt;
* sand wood floor and seal with water based polyurethane&lt;br /&gt;
* all A/V &amp;amp; musical equipment (including in crow&amp;#039;s nest) needs to be recorded (serial #s) and ownership determined&lt;br /&gt;
* ensure remaining shelving along north wall of disco room is fixed/affixed more safely&lt;br /&gt;
* pendant lights should probably be raised a bit higher up (low priority)&lt;br /&gt;
* pendant light switch(es): consider replacing with dimmers&lt;br /&gt;
* lightswitch cover near 48th st door should be replaced with one with less-sharp edges (better-sized)&lt;br /&gt;
* weight load for high-up triangular shelves in corners to be assessed (julia) to determine if speakers etc can be placed there&lt;/div&gt;</summary>
		<author><name>Kkr</name></author>
	</entry>
	<entry>
		<id>https://omnicommons.org/mediawiki/index.php?title=Event:2015/08/10_Building_Working_Group&amp;diff=3892</id>
		<title>Event:2015/08/10 Building Working Group</title>
		<link rel="alternate" type="text/html" href="https://omnicommons.org/mediawiki/index.php?title=Event:2015/08/10_Building_Working_Group&amp;diff=3892"/>
		<updated>2015-08-21T16:54:29Z</updated>

		<summary type="html">&lt;p&gt;Kkr: /* A/V Room */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Building WG August 10&lt;br /&gt;
&lt;br /&gt;
last week: https://omnicommons.org/wiki/Event:2015/08/03_Building_Working_Group&lt;br /&gt;
&lt;br /&gt;
== who&amp;#039;s here? ==&lt;br /&gt;
* rob, daniel, mary, matt, yar, joe, kerrie, laura late&lt;br /&gt;
&lt;br /&gt;
== south wall ==&lt;br /&gt;
* saturday work party was great! whitney said no safety issues, ready for inspection. just need to recap some wires because they weren&amp;#039;t twisted first, and connect some wires to their breakers.&lt;br /&gt;
* conduit against the wall needs a &amp;quot;dog-ear bend&amp;quot; to be against the wall, not just sitting straight - but this is ok for inspection right now&lt;br /&gt;
* matt says these will take &amp;quot;almost no time&amp;quot;&lt;br /&gt;
* rob says we need more tyvek&lt;br /&gt;
* joe will schedule the inspection&lt;br /&gt;
* still didn&amp;#039;t finish the exit sign because it has to go on the drywall. last inspection will cover that.&lt;br /&gt;
&lt;br /&gt;
== doors ==&lt;br /&gt;
* still waiting on jessie to make plumb lines&lt;br /&gt;
* matt: we have an actual plumb bob in the closet&lt;br /&gt;
&lt;br /&gt;
== money ==&lt;br /&gt;
* Rob wants money for a can of black paint&lt;br /&gt;
* Also for &amp;quot;shoulder nut eyes&amp;quot; to mount our projector in the ballroom. Probably $40 for 5 total including shipping online.&lt;br /&gt;
* Does anyone know if we have this in budget or do we have to ask finance?&lt;br /&gt;
* Rob already looked at Urban Ore ...&lt;br /&gt;
* Daniel wants to buy more ethernet cable for the run from Rise Above to Sudoroom routers. Would make everyone&amp;#039;s internet faster. Would also help create stage lighting for the ballroom.&lt;br /&gt;
&lt;br /&gt;
== regular saturday workday? ==&lt;br /&gt;
* yar: how about we do this every week?&lt;br /&gt;
* we really need to have organizers come BEFORE volunteers&lt;br /&gt;
&lt;br /&gt;
= LA LISTA =&lt;br /&gt;
&lt;br /&gt;
== Ballroom Area ==&lt;br /&gt;
&lt;br /&gt;
=== A/V Room ===&lt;br /&gt;
* &amp;lt;s&amp;gt;Electrical subpanel: Either replace broken breaker switches with with working ones, or install factory blanks.&amp;lt;/s&amp;gt; &amp;lt;-- MATT ALREADY DID THIS&lt;br /&gt;
* Patch small hole above door where conduit is peeking through.&lt;br /&gt;
* Patch hole near floor in NW corner of this room near door jamb. &amp;lt;--One last layer of mud...yaay&lt;br /&gt;
&lt;br /&gt;
=== Bar ===&lt;br /&gt;
* soffet-mounted ceiling light fixtures need: lightbulbs tested / replaced if necc&lt;br /&gt;
* Put up ABC signage req. for pub or private parties w/ alcohol re: cancer/pregnancy warning&lt;br /&gt;
* Determine fix for leaking sink in 3-sink (weld?) - southmost sink (on left if you are behind bar)&lt;br /&gt;
* Install floor sink under 3-sink as per health code&lt;br /&gt;
* Outlets on east/shattuck-side wall need to be: removed, wire-nutted, wrapped in elec tape, covered with blank faceplates. TURN OFF CIRCUIT FIRST. Note: furthest N outlet not disconnected, only outlet in the center of the wall&lt;br /&gt;
&lt;br /&gt;
=== Ballroom-Shattuck Exit Area ===&lt;br /&gt;
* install closers to both inner doors. &lt;br /&gt;
* install panic bars to both inner doors.&lt;br /&gt;
* install panic bars to both outer doors.&lt;br /&gt;
* install light cover into flourescent panel (22&amp;quot;x3&amp;#039;) - flourescents are 2x 2&amp;#039; bulbs&lt;br /&gt;
&lt;br /&gt;
=== Stage ===&lt;br /&gt;
* Create wider storage openings under stage. Not insubstantial. See stage storage build plan.&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine ===&lt;br /&gt;
* SE staircase: Install new led strip lighting on ea. side of stair to replace dead lighting strips&lt;br /&gt;
* SW staircase down: motion detector installed onto light fixture.&lt;br /&gt;
* SW staircase up: Install new led strip lighting on ea. side of stair to replace dead lighting strips&lt;br /&gt;
* SW staircase up: Repair hole in south wall near floor immediately across from stairs (see south wall acoustic treatment)&lt;br /&gt;
* SW staircase up: Determination if 3-way switch needs to be installed at top of stair. Currently there is only a switch at bottom landing.&lt;br /&gt;
* SW staircase up: motion detector installed onto light fixture.&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine Bathroom ===&lt;br /&gt;
* outlet needs to be replaced with GFCI - Note: no ground; Gerald suggests decommissioning and installing new grounded plug in wall just above counter; go into wall from other side, need to locate grounded location&lt;br /&gt;
* active ventilation needs to be wired &amp;amp; installed (exhaust) in current ventilation window&lt;br /&gt;
* all exposed bulb fixtures need be replaced with covered fixtures (2x)&lt;br /&gt;
* install door stop so the door can be propped open sometimes.&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine &amp;quot;Book Room&amp;quot; ===&lt;br /&gt;
* 4&amp;quot;x4&amp;quot; Outlets affixed to top of Electrical subpanel must be removed from subpanel, and affixed to balcony (code violation) (3x)&lt;br /&gt;
* Electrical subpanel needs be moved to plywood wall south of panel, onto drywall, 2&amp;#039; from ground.&lt;br /&gt;
* 3-way switch wiring (for chandelier) inside subpanel needs to be removed and placed elsewhere as not ok in-panel.&lt;br /&gt;
* Install closer to Mezzanine room door&lt;br /&gt;
&lt;br /&gt;
=== Crow&amp;#039;s Nest ===&lt;br /&gt;
* Clear everything 3&amp;#039; in front of electrical subpanel including all cords, lighitng, etc&lt;br /&gt;
* acquire &amp;amp; install cover for light (fixture takes glass orb / cover around bulb, it is missing)&lt;br /&gt;
* Make main (east) door to this room better fitting / gasketed against all air gaps so it functions for soundproofing&lt;br /&gt;
* rebalance fan&lt;br /&gt;
* extend balcony railing to out in front of balcony hatch - on E side of R&amp;amp;J balcony (building &amp;amp; osha safety)&lt;br /&gt;
* Refinish &amp;amp; airgap-seal east wall above loft in this room so room functions as soundproofing / air barrier to exterior of bldg&lt;br /&gt;
* Install real doorknob, remove latch&lt;br /&gt;
* make north door to romeo &amp;amp; juliet balcony airtight (or better fitting) for turning this room into a soundproofing barrier&lt;br /&gt;
* Install closer to main (east) door&lt;br /&gt;
* Install closer to north / balcony door&lt;br /&gt;
* ensure balcony hatch is robust enough to support 300lb standing weight&lt;br /&gt;
&lt;br /&gt;
=== Ticketbooth Room ===&lt;br /&gt;
* Remove giant bookshelf and all debris/material from this room. Call Emerson - ask them to get their table back, or are they donating to us ? :)&lt;br /&gt;
* &amp;lt;s&amp;gt;Make metal grille outside window openable, so the casement window can open.&amp;lt;/s&amp;gt; &amp;lt;== This would increase security risk and is not a building requirement&lt;br /&gt;
* Install threshold plate to base of jamb (no more than 1/2&amp;quot; high as per ADA) to cut down on sound from ballroom &lt;br /&gt;
* Install closer to Ticketbooth room door (pref. good kind with long close time for wheelchair)&lt;br /&gt;
* Patch small hole in ceiling corner above ticket window where new conduit was run. &lt;br /&gt;
* install gaskets to door jambs to cut down on sound. (icarus)&lt;br /&gt;
&lt;br /&gt;
== Disco Room ==&lt;br /&gt;
* 4th window from main door as a broken pane&lt;br /&gt;
* 5th window from main door the window frame rub against the wall on E side&lt;br /&gt;
* light switch cover near 48th street door should be replaced by one with less-sharp edges (better-sized)&lt;br /&gt;
* weight load for high triangular shelves in corners to be assessed (julia) to determine if speakers etc can be placed there&lt;br /&gt;
&lt;br /&gt;
== La Commune == &lt;br /&gt;
* install closer to basement stairs door&lt;br /&gt;
* cover floor sink behind front counter area w minimum 3/4&amp;quot; plywood cut out and sealant (trip hazard/health)&lt;br /&gt;
* fix broken glass pane in 4th window west of front door in La Commune&lt;br /&gt;
* replace all low uncover lights near entrance w cover lights x3&lt;br /&gt;
* take out and cap OR at least cover w small platform the copper water lines along floor behind the front counter&lt;br /&gt;
* locked storage - unplug and store all extension cords&lt;br /&gt;
 &lt;br /&gt;
== Rise Above ==&lt;br /&gt;
* replace locking main door to Rise Above in hallway with twenty minute solid-core (fire-code)&lt;br /&gt;
* replace 2x hollow-core sliding doors with 20 minutes solid-core sliding doors (fire-code)&lt;br /&gt;
* replaced busted circuit breaker in every electrial panel (like in the 42 breaker panel) with either working breaker or factory blanks.&lt;br /&gt;
* put closer on main door to Rise Above&lt;br /&gt;
* remove 2x6 on ceiling on south side of room (COORDINATE WITH GABRIELA 1ST - move or cover all her stuff.&lt;br /&gt;
* stage left - install paper towel dispenser and paper towels.&lt;br /&gt;
&lt;br /&gt;
==  Sudo ==&lt;br /&gt;
* created dedicated space for storing excess lumber (long pieces), pipe, metal pieces, etc so they are not in jumbles (fire code).&lt;br /&gt;
* Stairwell - sand down side of door so it does not stick closed so bad (belt sander optimal).&lt;br /&gt;
* west wall - run more 3/4&amp;quot; conduit further down west wall. Must know code.&lt;br /&gt;
&lt;br /&gt;
== Sudo/CCL ==&lt;br /&gt;
* along perimeter / walls do better job of affixing &amp;amp; routing low-voltage &amp;#039;inside wiring&amp;#039; ie all ethernet, phone cabling&lt;br /&gt;
* ballroom door - put closer on this door&lt;br /&gt;
* basement door - if possible, put closer on this door (may not be possible)&lt;br /&gt;
* entire room perimeter - 5LB ABC fire extinguishers at correct height every ~75&amp;#039; - starting w under each exit sign&lt;br /&gt;
* hallway door - install panic hardware &amp;amp; lock to this door&lt;br /&gt;
* hallway door - install closer to door&lt;br /&gt;
* ticket booth room - install new outlet (existing is cracked and not attached to wall)&lt;br /&gt;
&lt;br /&gt;
== TIL (TI) ==&lt;br /&gt;
* cover exposed wires in east wall (near bookshelf). can use a plate&lt;br /&gt;
* get clear cover to put over wall switch for old electric timer in wall in big bookshelf unit in south wall of TL&lt;br /&gt;
&lt;br /&gt;
== Basement ==&lt;br /&gt;
&lt;br /&gt;
* south wall: close holes in basement wall where opened to remove mold.&lt;br /&gt;
* identify stuff in bunker rooms &amp;amp; hallway: what is Phat Beets, Black Holes, what is junk/unclaimed?&lt;br /&gt;
* west wall: re-connect or newly connect toggle switch to basement ventilation fan in basement. Currently breakers turn it on.&lt;br /&gt;
* Phat Beets room ventilation doesn&amp;#039;t work. people can suffocate in there.&lt;br /&gt;
&lt;br /&gt;
=== ceiling ===&lt;br /&gt;
* Acquire &amp;amp; install light fixture covers for the 4&amp;#039; flourescent fixtures in basement offices (bunker rooms) - roughly ~48&amp;quot;x16&amp;quot;. &lt;br /&gt;
* install protective bulb covers over remaining working 8&amp;#039; flourescents: 6x&lt;br /&gt;
* unscrew piece of broken lightbulb from East basement hallway, replace bare-bulb fixture with covered fixture&lt;br /&gt;
* re-attach and restore service to entire strip of 8&amp;#039; flourescents along west wall (closest to sudo) that had been decommissioned&lt;br /&gt;
* acquire and affix 1&amp;#039;x1&amp;#039; ceiling tiles in NW corner of basement, so lighting fixture &amp;amp; strip of lights can be re-connected. ~120 tiles&lt;br /&gt;
* Cut &amp;amp; attach drywall AND then also affix 1&amp;#039;x1&amp;#039; ceiling tiles to exposed ceiling areas in basement (2 areas)&lt;br /&gt;
* Replace bad ballast in any 8&amp;#039; flourescent fixture (that is not turning on. If not sure try lights in it that do work in another fixture.&lt;br /&gt;
&lt;br /&gt;
=== kitchen ===&lt;br /&gt;
* Purchase and affix Class-K extinguisher at correct height&lt;br /&gt;
* Cover exposed wiring in FNB locked-pantry ceiling (with e.g. metal plate)&lt;br /&gt;
* Install Ansul fire-suppression in hood&lt;br /&gt;
* Replace entire 4&amp;#039; flourescent light fixture closest to stove (has 1x broken tube holder)&lt;br /&gt;
* Resurface kitchen floor, cover with quarry tile&lt;br /&gt;
* Knock out / expand west kitchen wall to next-west supporting pipe&lt;br /&gt;
* Fix or replace corroded window frames along shattuck&lt;br /&gt;
* Cut in mop sink in westmost pantry area&lt;br /&gt;
* Acquire and install tankless water heater, check gas line diameter &amp;amp; exhaust ductwork &lt;br /&gt;
* Acquire makeup air into kitchen (remove desk fan from duct, replace with something to code - 95% of hood CFM)&lt;br /&gt;
* Put closers on both basement kitchen doors&lt;br /&gt;
* Remove firred-out drywall, cover with FRP&lt;br /&gt;
* steam clean stove hood&lt;br /&gt;
&lt;br /&gt;
== Milestones ==&lt;br /&gt;
&lt;br /&gt;
* yar: what&amp;#039;s our next milestone? passing fire inspection for just the ballroom or the whole building?&lt;br /&gt;
* matt: ballroom&amp;#039;s most complicated because it&amp;#039;s classified as &amp;quot;assembly&amp;quot;. but inspector coming to ballroom won&amp;#039;t ignore rest of the building&lt;br /&gt;
* basement is connected to ballroom because they share the floor&lt;/div&gt;</summary>
		<author><name>Kkr</name></author>
	</entry>
	<entry>
		<id>https://omnicommons.org/mediawiki/index.php?title=Conflict_Steward&amp;diff=3882</id>
		<title>Conflict Steward</title>
		<link rel="alternate" type="text/html" href="https://omnicommons.org/mediawiki/index.php?title=Conflict_Steward&amp;diff=3882"/>
		<updated>2015-08-13T20:04:22Z</updated>

		<summary type="html">&lt;p&gt;Kkr: Undo revision 3881 by Kkr (talk)&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;The Conflict Steward helps to mediate conflicts by ensuring conflict resolution meetings happen between all involved parties, that conflicts are thoroughly documented, and that rights to privacy and fair process are assured.&lt;br /&gt;
&lt;br /&gt;
* Facilitates the conflict resolution process according to the Articles of Association, but not necessarily a moderator.&lt;br /&gt;
* Stewards selection of a moderator and schedules meetings among conflicting parties and moderator.&lt;br /&gt;
* Documents meetings and communications relevant to the conflict resolution process.&lt;br /&gt;
* Promotes good-faith participation in the process by conflicting parties on a basis of mutual respect and growth towards better relationships and a stronger community.&lt;br /&gt;
* If conflict resolution goes before the whole group, co-facilitates with Facilitator, and handles points of information about conflict resolution with reference to the documentation.&lt;br /&gt;
* Does not act as Conflict Steward in conflicts involving self.&lt;/div&gt;</summary>
		<author><name>Kkr</name></author>
	</entry>
	<entry>
		<id>https://omnicommons.org/mediawiki/index.php?title=Conflict_Steward&amp;diff=3881</id>
		<title>Conflict Steward</title>
		<link rel="alternate" type="text/html" href="https://omnicommons.org/mediawiki/index.php?title=Conflict_Steward&amp;diff=3881"/>
		<updated>2015-08-13T20:01:27Z</updated>

		<summary type="html">&lt;p&gt;Kkr: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;The Conflict Steward helps to mediate conflicts by ensuring conflict resolution meetings happen between all involved parties, that conflicts are thoroughly documented, and that rights to privacy and fair process are assured.&lt;br /&gt;
&lt;br /&gt;
* Facilitates the conflict resolution process according to the [[Articles of Association]], but not necessarily a moderator.&lt;br /&gt;
* Stewards selection of a moderator and schedules meetings among conflicting parties and moderator.&lt;br /&gt;
* Documents meetings and communications relevant to the conflict resolution process.&lt;br /&gt;
* Promotes good-faith participation in the process by conflicting parties on a basis of mutual respect and growth towards better relationships and a stronger community.&lt;br /&gt;
* If conflict resolution goes before the whole group, co-facilitates with Facilitator, and handles points of information about conflict resolution with reference to the documentation.&lt;br /&gt;
* Does not act as Conflict Steward in conflicts involving self.&lt;/div&gt;</summary>
		<author><name>Kkr</name></author>
	</entry>
	<entry>
		<id>https://omnicommons.org/mediawiki/index.php?title=User:Kkr&amp;diff=3880</id>
		<title>User:Kkr</title>
		<link rel="alternate" type="text/html" href="https://omnicommons.org/mediawiki/index.php?title=User:Kkr&amp;diff=3880"/>
		<updated>2015-08-13T19:11:50Z</updated>

		<summary type="html">&lt;p&gt;Kkr: Created page with &amp;quot;Sudo Room member.&amp;quot;&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;[[Sudo Room]] member.&lt;/div&gt;</summary>
		<author><name>Kkr</name></author>
	</entry>
	<entry>
		<id>https://omnicommons.org/mediawiki/index.php?title=Event:2015/08/10_Building_Working_Group&amp;diff=3879</id>
		<title>Event:2015/08/10 Building Working Group</title>
		<link rel="alternate" type="text/html" href="https://omnicommons.org/mediawiki/index.php?title=Event:2015/08/10_Building_Working_Group&amp;diff=3879"/>
		<updated>2015-08-13T00:28:08Z</updated>

		<summary type="html">&lt;p&gt;Kkr: /* TIL (TI) */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Building WG August 10&lt;br /&gt;
&lt;br /&gt;
last week: https://omnicommons.org/wiki/Event:2015/08/03_Building_Working_Group&lt;br /&gt;
&lt;br /&gt;
== who&amp;#039;s here? ==&lt;br /&gt;
* rob, daniel, mary, matt, yar, joe, kerrie, laura late&lt;br /&gt;
&lt;br /&gt;
== south wall ==&lt;br /&gt;
* saturday work party was great! whitney said no safety issues, ready for inspection. just need to recap some wires because they weren&amp;#039;t twisted first, and connect some wires to their breakers.&lt;br /&gt;
* conduit against the wall needs a &amp;quot;dog-ear bend&amp;quot; to be against the wall, not just sitting straight - but this is ok for inspection right now&lt;br /&gt;
* matt says these will take &amp;quot;almost no time&amp;quot;&lt;br /&gt;
* rob says we need more tyvek&lt;br /&gt;
* joe will schedule the inspection&lt;br /&gt;
* still didn&amp;#039;t finish the exit sign because it has to go on the drywall. last inspection will cover that.&lt;br /&gt;
&lt;br /&gt;
== doors ==&lt;br /&gt;
* still waiting on jessie to make plumb lines&lt;br /&gt;
* matt: we have an actual plumb bob in the closet&lt;br /&gt;
&lt;br /&gt;
== money ==&lt;br /&gt;
* Rob wants money for a can of black paint&lt;br /&gt;
* Also for &amp;quot;shoulder nut eyes&amp;quot; to mount our projector in the ballroom. Probably $40 for 5 total including shipping online.&lt;br /&gt;
* Does anyone know if we have this in budget or do we have to ask finance?&lt;br /&gt;
* Rob already looked at Urban Ore ...&lt;br /&gt;
* Daniel wants to buy more ethernet cable for the run from Rise Above to Sudoroom routers. Would make everyone&amp;#039;s internet faster. Would also help create stage lighting for the ballroom.&lt;br /&gt;
&lt;br /&gt;
== regular saturday workday? ==&lt;br /&gt;
* yar: how about we do this every week?&lt;br /&gt;
* we really need to have organizers come BEFORE volunteers&lt;br /&gt;
&lt;br /&gt;
= LA LISTA =&lt;br /&gt;
&lt;br /&gt;
== Ballroom Area ==&lt;br /&gt;
&lt;br /&gt;
=== A/V Room ===&lt;br /&gt;
* &amp;lt;s&amp;gt;Electrical subpanel: Either replace broken breaker switches with with working ones, or install factory blanks.&amp;lt;/s&amp;gt; &amp;lt;-- MATT ALREADY DID THIS&lt;br /&gt;
* Patch small hole above door where conduit is peeking through.&lt;br /&gt;
* Patch hole near floor in NW corner of this room near door jamb. &amp;lt;--In progress by kkr&lt;br /&gt;
&lt;br /&gt;
=== Bar ===&lt;br /&gt;
* soffet-mounted ceiling light fixtures need: lightbulbs tested / replaced if necc&lt;br /&gt;
* Put up ABC signage req. for pub or private parties w/ alcohol re: cancer/pregnancy warning&lt;br /&gt;
* Determine fix for leaking sink in 3-sink (weld?) - southmost sink (on left if you are behind bar)&lt;br /&gt;
* Install floor sink under 3-sink as per health code&lt;br /&gt;
* Outlets on east/shattuck-side wall need to be: removed, wire-nutted, wrapped in elec tape, covered with blank faceplates. TURN OFF CIRCUIT FIRST. Note: furthest N outlet not disconnected, only outlet in the center of the wall&lt;br /&gt;
&lt;br /&gt;
=== Ballroom-Shattuck Exit Area ===&lt;br /&gt;
* install closers to both inner doors. &lt;br /&gt;
* install panic bars to both inner doors.&lt;br /&gt;
* install panic bars to both outer doors.&lt;br /&gt;
* install light cover into flourescent panel (22&amp;quot;x3&amp;#039;) - flourescents are 2x 2&amp;#039; bulbs&lt;br /&gt;
&lt;br /&gt;
=== Stage ===&lt;br /&gt;
* Create wider storage openings under stage. Not insubstantial. See stage storage build plan.&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine ===&lt;br /&gt;
* SE staircase: Install new led strip lighting on ea. side of stair to replace dead lighting strips&lt;br /&gt;
* SW staircase down: motion detector installed onto light fixture.&lt;br /&gt;
* SW staircase up: Install new led strip lighting on ea. side of stair to replace dead lighting strips&lt;br /&gt;
* SW staircase up: Repair hole in south wall near floor immediately across from stairs (see south wall acoustic treatment)&lt;br /&gt;
* SW staircase up: Determination if 3-way switch needs to be installed at top of stair. Currently there is only a switch at bottom landing.&lt;br /&gt;
* SW staircase up: motion detector installed onto light fixture.&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine Bathroom ===&lt;br /&gt;
* outlet needs to be replaced with GFCI - Note: no ground; Gerald suggests decommissioning and installing new grounded plug in wall just above counter; go into wall from other side, need to locate grounded location&lt;br /&gt;
* active ventilation needs to be wired &amp;amp; installed (exhaust) in current ventilation window&lt;br /&gt;
* all exposed bulb fixtures need be replaced with covered fixtures (2x)&lt;br /&gt;
* install door stop so the door can be propped open sometimes.&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine &amp;quot;Book Room&amp;quot; ===&lt;br /&gt;
* 4&amp;quot;x4&amp;quot; Outlets affixed to top of Electrical subpanel must be removed from subpanel, and affixed to balcony (code violation) (3x)&lt;br /&gt;
* Electrical subpanel needs be moved to plywood wall south of panel, onto drywall, 2&amp;#039; from ground.&lt;br /&gt;
* 3-way switch wiring (for chandelier) inside subpanel needs to be removed and placed elsewhere as not ok in-panel.&lt;br /&gt;
* Install closer to Mezzanine room door&lt;br /&gt;
&lt;br /&gt;
=== Crow&amp;#039;s Nest ===&lt;br /&gt;
* Clear everything 3&amp;#039; in front of electrical subpanel including all cords, lighitng, etc&lt;br /&gt;
* acquire &amp;amp; install cover for light (fixture takes glass orb / cover around bulb, it is missing)&lt;br /&gt;
* Make main (east) door to this room better fitting / gasketed against all air gaps so it functions for soundproofing&lt;br /&gt;
* rebalance fan&lt;br /&gt;
* extend balcony railing to out in front of balcony hatch - on E side of R&amp;amp;J balcony (building &amp;amp; osha safety)&lt;br /&gt;
* Refinish &amp;amp; airgap-seal east wall above loft in this room so room functions as soundproofing / air barrier to exterior of bldg&lt;br /&gt;
* Install real doorknob, remove latch&lt;br /&gt;
* make north door to romeo &amp;amp; juliet balcony airtight (or better fitting) for turning this room into a soundproofing barrier&lt;br /&gt;
* Install closer to main (east) door&lt;br /&gt;
* Install closer to north / balcony door&lt;br /&gt;
* ensure balcony hatch is robust enough to support 300lb standing weight&lt;br /&gt;
&lt;br /&gt;
=== Ticketbooth Room ===&lt;br /&gt;
* Remove giant bookshelf and all debris/material from this room. Call Emerson - ask them to get their table back, or are they donating to us ? :)&lt;br /&gt;
* &amp;lt;s&amp;gt;Make metal grille outside window openable, so the casement window can open.&amp;lt;/s&amp;gt; &amp;lt;== This would increase security risk and is not a building requirement&lt;br /&gt;
* Install threshold plate to base of jamb (no more than 1/2&amp;quot; high as per ADA) to cut down on sound from ballroom &lt;br /&gt;
* Install closer to Ticketbooth room door (pref. good kind with long close time for wheelchair)&lt;br /&gt;
* Patch small hole in ceiling corner above ticket window where new conduit was run. &lt;br /&gt;
* install gaskets to door jambs to cut down on sound. (icarus)&lt;br /&gt;
&lt;br /&gt;
== Disco Room ==&lt;br /&gt;
* 4th window from main door as a broken pane&lt;br /&gt;
* 5th window from main door the window frame rub against the wall on E side&lt;br /&gt;
* light switch cover near 48th street door should be replaced by one with less-sharp edges (better-sized)&lt;br /&gt;
* weight load for high triangular shelves in corners to be assessed (julia) to determine if speakers etc can be placed there&lt;br /&gt;
&lt;br /&gt;
== La Commune == &lt;br /&gt;
* install closer to basement stairs door&lt;br /&gt;
* cover floor sink behind front counter area w minimum 3/4&amp;quot; plywood cut out and sealant (trip hazard/health)&lt;br /&gt;
* fix broken glass pane in 4th window west of front door in La Commune&lt;br /&gt;
* replace all low uncover lights near entrance w cover lights x3&lt;br /&gt;
* take out and cap OR at least cover w small platform the copper water lines along floor behind the front counter&lt;br /&gt;
* locked storage - unplug and store all extension cords&lt;br /&gt;
 &lt;br /&gt;
== Rise Above ==&lt;br /&gt;
* replace locking main door to Rise Above in hallway with twenty minute solid-core (fire-code)&lt;br /&gt;
* replace 2x hollow-core sliding doors with 20 minutes solid-core sliding doors (fire-code)&lt;br /&gt;
* replaced busted circuit breaker in every electrial panel (like in the 42 breaker panel) with either working breaker or factory blanks.&lt;br /&gt;
* put closer on main door to Rise Above&lt;br /&gt;
* remove 2x6 on ceiling on south side of room (COORDINATE WITH GABRIELA 1ST - move or cover all her stuff.&lt;br /&gt;
* stage left - install paper towel dispenser and paper towels.&lt;br /&gt;
&lt;br /&gt;
==  Sudo ==&lt;br /&gt;
* created dedicated space for storing excess lumber (long pieces), pipe, metal pieces, etc so they are not in jumbles (fire code).&lt;br /&gt;
* Stairwell - sand down side of door so it does not stick closed so bad (belt sander optimal).&lt;br /&gt;
* west wall - run more 3/4&amp;quot; conduit further down west wall. Must know code.&lt;br /&gt;
&lt;br /&gt;
== Sudo/CCL ==&lt;br /&gt;
* along perimeter / walls do better job of affixing &amp;amp; routing low-voltage &amp;#039;inside wiring&amp;#039; ie all ethernet, phone cabling&lt;br /&gt;
* ballroom door - put closer on this door&lt;br /&gt;
* basement door - if possible, put closer on this door (may not be possible)&lt;br /&gt;
* entire room perimeter - 5LB ABC fire extinguishers at correct height every ~75&amp;#039; - starting w under each exit sign&lt;br /&gt;
* hallway door - install panic hardware &amp;amp; lock to this door&lt;br /&gt;
* hallway door - install closer to door&lt;br /&gt;
* ticket booth room - install new outlet (existing is cracked and not attached to wall)&lt;br /&gt;
&lt;br /&gt;
== TIL (TI) ==&lt;br /&gt;
* cover exposed wires in east wall (near bookshelf). can use a plate&lt;br /&gt;
* get clear cover to put over wall switch for old electric timer in wall in big bookshelf unit in south wall of TL&lt;br /&gt;
&lt;br /&gt;
== Basement ==&lt;br /&gt;
&lt;br /&gt;
* south wall: close holes in basement wall where opened to remove mold.&lt;br /&gt;
* identify stuff in bunker rooms &amp;amp; hallway: what is Phat Beets, Black Holes, what is junk/unclaimed?&lt;br /&gt;
* west wall: re-connect or newly connect toggle switch to basement ventilation fan in basement. Currently breakers turn it on.&lt;br /&gt;
* Phat Beets room ventilation doesn&amp;#039;t work. people can suffocate in there.&lt;br /&gt;
&lt;br /&gt;
=== ceiling ===&lt;br /&gt;
* Acquire &amp;amp; install light fixture covers for the 4&amp;#039; flourescent fixtures in basement offices (bunker rooms) - roughly ~48&amp;quot;x16&amp;quot;. &lt;br /&gt;
* install protective bulb covers over remaining working 8&amp;#039; flourescents: 6x&lt;br /&gt;
* unscrew piece of broken lightbulb from East basement hallway, replace bare-bulb fixture with covered fixture&lt;br /&gt;
* re-attach and restore service to entire strip of 8&amp;#039; flourescents along west wall (closest to sudo) that had been decommissioned&lt;br /&gt;
* acquire and affix 1&amp;#039;x1&amp;#039; ceiling tiles in NW corner of basement, so lighting fixture &amp;amp; strip of lights can be re-connected. ~120 tiles&lt;br /&gt;
* Cut &amp;amp; attach drywall AND then also affix 1&amp;#039;x1&amp;#039; ceiling tiles to exposed ceiling areas in basement (2 areas)&lt;br /&gt;
* Replace bad ballast in any 8&amp;#039; flourescent fixture (that is not turning on. If not sure try lights in it that do work in another fixture.&lt;br /&gt;
&lt;br /&gt;
=== kitchen ===&lt;br /&gt;
* Purchase and affix Class-K extinguisher at correct height&lt;br /&gt;
* Cover exposed wiring in FNB locked-pantry ceiling (with e.g. metal plate)&lt;br /&gt;
* Install Ansul fire-suppression in hood&lt;br /&gt;
* Replace entire 4&amp;#039; flourescent light fixture closest to stove (has 1x broken tube holder)&lt;br /&gt;
* Resurface kitchen floor, cover with quarry tile&lt;br /&gt;
* Knock out / expand west kitchen wall to next-west supporting pipe&lt;br /&gt;
* Fix or replace corroded window frames along shattuck&lt;br /&gt;
* Cut in mop sink in westmost pantry area&lt;br /&gt;
* Acquire and install tankless water heater, check gas line diameter &amp;amp; exhaust ductwork &lt;br /&gt;
* Acquire makeup air into kitchen (remove desk fan from duct, replace with something to code - 95% of hood CFM)&lt;br /&gt;
* Put closers on both basement kitchen doors&lt;br /&gt;
* Remove firred-out drywall, cover with FRP&lt;br /&gt;
* steam clean stove hood&lt;br /&gt;
&lt;br /&gt;
== Milestones ==&lt;br /&gt;
&lt;br /&gt;
* yar: what&amp;#039;s our next milestone? passing fire inspection for just the ballroom or the whole building?&lt;br /&gt;
* matt: ballroom&amp;#039;s most complicated because it&amp;#039;s classified as &amp;quot;assembly&amp;quot;. but inspector coming to ballroom won&amp;#039;t ignore rest of the building&lt;br /&gt;
* basement is connected to ballroom because they share the floor&lt;/div&gt;</summary>
		<author><name>Kkr</name></author>
	</entry>
	<entry>
		<id>https://omnicommons.org/mediawiki/index.php?title=Event:2015/08/10_Building_Working_Group&amp;diff=3878</id>
		<title>Event:2015/08/10 Building Working Group</title>
		<link rel="alternate" type="text/html" href="https://omnicommons.org/mediawiki/index.php?title=Event:2015/08/10_Building_Working_Group&amp;diff=3878"/>
		<updated>2015-08-13T00:27:27Z</updated>

		<summary type="html">&lt;p&gt;Kkr: /* Sudo */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Building WG August 10&lt;br /&gt;
&lt;br /&gt;
last week: https://omnicommons.org/wiki/Event:2015/08/03_Building_Working_Group&lt;br /&gt;
&lt;br /&gt;
== who&amp;#039;s here? ==&lt;br /&gt;
* rob, daniel, mary, matt, yar, joe, kerrie, laura late&lt;br /&gt;
&lt;br /&gt;
== south wall ==&lt;br /&gt;
* saturday work party was great! whitney said no safety issues, ready for inspection. just need to recap some wires because they weren&amp;#039;t twisted first, and connect some wires to their breakers.&lt;br /&gt;
* conduit against the wall needs a &amp;quot;dog-ear bend&amp;quot; to be against the wall, not just sitting straight - but this is ok for inspection right now&lt;br /&gt;
* matt says these will take &amp;quot;almost no time&amp;quot;&lt;br /&gt;
* rob says we need more tyvek&lt;br /&gt;
* joe will schedule the inspection&lt;br /&gt;
* still didn&amp;#039;t finish the exit sign because it has to go on the drywall. last inspection will cover that.&lt;br /&gt;
&lt;br /&gt;
== doors ==&lt;br /&gt;
* still waiting on jessie to make plumb lines&lt;br /&gt;
* matt: we have an actual plumb bob in the closet&lt;br /&gt;
&lt;br /&gt;
== money ==&lt;br /&gt;
* Rob wants money for a can of black paint&lt;br /&gt;
* Also for &amp;quot;shoulder nut eyes&amp;quot; to mount our projector in the ballroom. Probably $40 for 5 total including shipping online.&lt;br /&gt;
* Does anyone know if we have this in budget or do we have to ask finance?&lt;br /&gt;
* Rob already looked at Urban Ore ...&lt;br /&gt;
* Daniel wants to buy more ethernet cable for the run from Rise Above to Sudoroom routers. Would make everyone&amp;#039;s internet faster. Would also help create stage lighting for the ballroom.&lt;br /&gt;
&lt;br /&gt;
== regular saturday workday? ==&lt;br /&gt;
* yar: how about we do this every week?&lt;br /&gt;
* we really need to have organizers come BEFORE volunteers&lt;br /&gt;
&lt;br /&gt;
= LA LISTA =&lt;br /&gt;
&lt;br /&gt;
== Ballroom Area ==&lt;br /&gt;
&lt;br /&gt;
=== A/V Room ===&lt;br /&gt;
* &amp;lt;s&amp;gt;Electrical subpanel: Either replace broken breaker switches with with working ones, or install factory blanks.&amp;lt;/s&amp;gt; &amp;lt;-- MATT ALREADY DID THIS&lt;br /&gt;
* Patch small hole above door where conduit is peeking through.&lt;br /&gt;
* Patch hole near floor in NW corner of this room near door jamb. &amp;lt;--In progress by kkr&lt;br /&gt;
&lt;br /&gt;
=== Bar ===&lt;br /&gt;
* soffet-mounted ceiling light fixtures need: lightbulbs tested / replaced if necc&lt;br /&gt;
* Put up ABC signage req. for pub or private parties w/ alcohol re: cancer/pregnancy warning&lt;br /&gt;
* Determine fix for leaking sink in 3-sink (weld?) - southmost sink (on left if you are behind bar)&lt;br /&gt;
* Install floor sink under 3-sink as per health code&lt;br /&gt;
* Outlets on east/shattuck-side wall need to be: removed, wire-nutted, wrapped in elec tape, covered with blank faceplates. TURN OFF CIRCUIT FIRST. Note: furthest N outlet not disconnected, only outlet in the center of the wall&lt;br /&gt;
&lt;br /&gt;
=== Ballroom-Shattuck Exit Area ===&lt;br /&gt;
* install closers to both inner doors. &lt;br /&gt;
* install panic bars to both inner doors.&lt;br /&gt;
* install panic bars to both outer doors.&lt;br /&gt;
* install light cover into flourescent panel (22&amp;quot;x3&amp;#039;) - flourescents are 2x 2&amp;#039; bulbs&lt;br /&gt;
&lt;br /&gt;
=== Stage ===&lt;br /&gt;
* Create wider storage openings under stage. Not insubstantial. See stage storage build plan.&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine ===&lt;br /&gt;
* SE staircase: Install new led strip lighting on ea. side of stair to replace dead lighting strips&lt;br /&gt;
* SW staircase down: motion detector installed onto light fixture.&lt;br /&gt;
* SW staircase up: Install new led strip lighting on ea. side of stair to replace dead lighting strips&lt;br /&gt;
* SW staircase up: Repair hole in south wall near floor immediately across from stairs (see south wall acoustic treatment)&lt;br /&gt;
* SW staircase up: Determination if 3-way switch needs to be installed at top of stair. Currently there is only a switch at bottom landing.&lt;br /&gt;
* SW staircase up: motion detector installed onto light fixture.&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine Bathroom ===&lt;br /&gt;
* outlet needs to be replaced with GFCI - Note: no ground; Gerald suggests decommissioning and installing new grounded plug in wall just above counter; go into wall from other side, need to locate grounded location&lt;br /&gt;
* active ventilation needs to be wired &amp;amp; installed (exhaust) in current ventilation window&lt;br /&gt;
* all exposed bulb fixtures need be replaced with covered fixtures (2x)&lt;br /&gt;
* install door stop so the door can be propped open sometimes.&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine &amp;quot;Book Room&amp;quot; ===&lt;br /&gt;
* 4&amp;quot;x4&amp;quot; Outlets affixed to top of Electrical subpanel must be removed from subpanel, and affixed to balcony (code violation) (3x)&lt;br /&gt;
* Electrical subpanel needs be moved to plywood wall south of panel, onto drywall, 2&amp;#039; from ground.&lt;br /&gt;
* 3-way switch wiring (for chandelier) inside subpanel needs to be removed and placed elsewhere as not ok in-panel.&lt;br /&gt;
* Install closer to Mezzanine room door&lt;br /&gt;
&lt;br /&gt;
=== Crow&amp;#039;s Nest ===&lt;br /&gt;
* Clear everything 3&amp;#039; in front of electrical subpanel including all cords, lighitng, etc&lt;br /&gt;
* acquire &amp;amp; install cover for light (fixture takes glass orb / cover around bulb, it is missing)&lt;br /&gt;
* Make main (east) door to this room better fitting / gasketed against all air gaps so it functions for soundproofing&lt;br /&gt;
* rebalance fan&lt;br /&gt;
* extend balcony railing to out in front of balcony hatch - on E side of R&amp;amp;J balcony (building &amp;amp; osha safety)&lt;br /&gt;
* Refinish &amp;amp; airgap-seal east wall above loft in this room so room functions as soundproofing / air barrier to exterior of bldg&lt;br /&gt;
* Install real doorknob, remove latch&lt;br /&gt;
* make north door to romeo &amp;amp; juliet balcony airtight (or better fitting) for turning this room into a soundproofing barrier&lt;br /&gt;
* Install closer to main (east) door&lt;br /&gt;
* Install closer to north / balcony door&lt;br /&gt;
* ensure balcony hatch is robust enough to support 300lb standing weight&lt;br /&gt;
&lt;br /&gt;
=== Ticketbooth Room ===&lt;br /&gt;
* Remove giant bookshelf and all debris/material from this room. Call Emerson - ask them to get their table back, or are they donating to us ? :)&lt;br /&gt;
* &amp;lt;s&amp;gt;Make metal grille outside window openable, so the casement window can open.&amp;lt;/s&amp;gt; &amp;lt;== This would increase security risk and is not a building requirement&lt;br /&gt;
* Install threshold plate to base of jamb (no more than 1/2&amp;quot; high as per ADA) to cut down on sound from ballroom &lt;br /&gt;
* Install closer to Ticketbooth room door (pref. good kind with long close time for wheelchair)&lt;br /&gt;
* Patch small hole in ceiling corner above ticket window where new conduit was run. &lt;br /&gt;
* install gaskets to door jambs to cut down on sound. (icarus)&lt;br /&gt;
&lt;br /&gt;
== Disco Room ==&lt;br /&gt;
* 4th window from main door as a broken pane&lt;br /&gt;
* 5th window from main door the window frame rub against the wall on E side&lt;br /&gt;
* light switch cover near 48th street door should be replaced by one with less-sharp edges (better-sized)&lt;br /&gt;
* weight load for high triangular shelves in corners to be assessed (julia) to determine if speakers etc can be placed there&lt;br /&gt;
&lt;br /&gt;
== La Commune == &lt;br /&gt;
* install closer to basement stairs door&lt;br /&gt;
* cover floor sink behind front counter area w minimum 3/4&amp;quot; plywood cut out and sealant (trip hazard/health)&lt;br /&gt;
* fix broken glass pane in 4th window west of front door in La Commune&lt;br /&gt;
* replace all low uncover lights near entrance w cover lights x3&lt;br /&gt;
* take out and cap OR at least cover w small platform the copper water lines along floor behind the front counter&lt;br /&gt;
* locked storage - unplug and store all extension cords&lt;br /&gt;
 &lt;br /&gt;
== Rise Above ==&lt;br /&gt;
* replace locking main door to Rise Above in hallway with twenty minute solid-core (fire-code)&lt;br /&gt;
* replace 2x hollow-core sliding doors with 20 minutes solid-core sliding doors (fire-code)&lt;br /&gt;
* replaced busted circuit breaker in every electrial panel (like in the 42 breaker panel) with either working breaker or factory blanks.&lt;br /&gt;
* put closer on main door to Rise Above&lt;br /&gt;
* remove 2x6 on ceiling on south side of room (COORDINATE WITH GABRIELA 1ST - move or cover all her stuff.&lt;br /&gt;
* stage left - install paper towel dispenser and paper towels.&lt;br /&gt;
&lt;br /&gt;
==  Sudo ==&lt;br /&gt;
* created dedicated space for storing excess lumber (long pieces), pipe, metal pieces, etc so they are not in jumbles (fire code).&lt;br /&gt;
* Stairwell - sand down side of door so it does not stick closed so bad (belt sander optimal).&lt;br /&gt;
* west wall - run more 3/4&amp;quot; conduit further down west wall. Must know code.&lt;br /&gt;
&lt;br /&gt;
== Sudo/CCL ==&lt;br /&gt;
* along perimeter / walls do better job of affixing &amp;amp; routing low-voltage &amp;#039;inside wiring&amp;#039; ie all ethernet, phone cabling&lt;br /&gt;
* ballroom door - put closer on this door&lt;br /&gt;
* basement door - if possible, put closer on this door (may not be possible)&lt;br /&gt;
* entire room perimeter - 5LB ABC fire extinguishers at correct height every ~75&amp;#039; - starting w under each exit sign&lt;br /&gt;
* hallway door - install panic hardware &amp;amp; lock to this door&lt;br /&gt;
* hallway door - install closer to door&lt;br /&gt;
* ticket booth room - install new outlet (existing is cracked and not attached to wall)&lt;br /&gt;
&lt;br /&gt;
== TIL (TI) ==&lt;br /&gt;
* cover exposed wires in east wall (near bookshelf). can use a plate&lt;br /&gt;
* get clear cover to put over wall switch for old electric timer in wall in big bookshelf unit in south wall of TL&lt;br /&gt;
&lt;br /&gt;
.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Basement ==&lt;br /&gt;
&lt;br /&gt;
* south wall: close holes in basement wall where opened to remove mold.&lt;br /&gt;
* identify stuff in bunker rooms &amp;amp; hallway: what is Phat Beets, Black Holes, what is junk/unclaimed?&lt;br /&gt;
* west wall: re-connect or newly connect toggle switch to basement ventilation fan in basement. Currently breakers turn it on.&lt;br /&gt;
* Phat Beets room ventilation doesn&amp;#039;t work. people can suffocate in there.&lt;br /&gt;
&lt;br /&gt;
=== ceiling ===&lt;br /&gt;
* Acquire &amp;amp; install light fixture covers for the 4&amp;#039; flourescent fixtures in basement offices (bunker rooms) - roughly ~48&amp;quot;x16&amp;quot;. &lt;br /&gt;
* install protective bulb covers over remaining working 8&amp;#039; flourescents: 6x&lt;br /&gt;
* unscrew piece of broken lightbulb from East basement hallway, replace bare-bulb fixture with covered fixture&lt;br /&gt;
* re-attach and restore service to entire strip of 8&amp;#039; flourescents along west wall (closest to sudo) that had been decommissioned&lt;br /&gt;
* acquire and affix 1&amp;#039;x1&amp;#039; ceiling tiles in NW corner of basement, so lighting fixture &amp;amp; strip of lights can be re-connected. ~120 tiles&lt;br /&gt;
* Cut &amp;amp; attach drywall AND then also affix 1&amp;#039;x1&amp;#039; ceiling tiles to exposed ceiling areas in basement (2 areas)&lt;br /&gt;
* Replace bad ballast in any 8&amp;#039; flourescent fixture (that is not turning on. If not sure try lights in it that do work in another fixture.&lt;br /&gt;
&lt;br /&gt;
=== kitchen ===&lt;br /&gt;
* Purchase and affix Class-K extinguisher at correct height&lt;br /&gt;
* Cover exposed wiring in FNB locked-pantry ceiling (with e.g. metal plate)&lt;br /&gt;
* Install Ansul fire-suppression in hood&lt;br /&gt;
* Replace entire 4&amp;#039; flourescent light fixture closest to stove (has 1x broken tube holder)&lt;br /&gt;
* Resurface kitchen floor, cover with quarry tile&lt;br /&gt;
* Knock out / expand west kitchen wall to next-west supporting pipe&lt;br /&gt;
* Fix or replace corroded window frames along shattuck&lt;br /&gt;
* Cut in mop sink in westmost pantry area&lt;br /&gt;
* Acquire and install tankless water heater, check gas line diameter &amp;amp; exhaust ductwork &lt;br /&gt;
* Acquire makeup air into kitchen (remove desk fan from duct, replace with something to code - 95% of hood CFM)&lt;br /&gt;
* Put closers on both basement kitchen doors&lt;br /&gt;
* Remove firred-out drywall, cover with FRP&lt;br /&gt;
* steam clean stove hood&lt;br /&gt;
&lt;br /&gt;
== Milestones ==&lt;br /&gt;
&lt;br /&gt;
* yar: what&amp;#039;s our next milestone? passing fire inspection for just the ballroom or the whole building?&lt;br /&gt;
* matt: ballroom&amp;#039;s most complicated because it&amp;#039;s classified as &amp;quot;assembly&amp;quot;. but inspector coming to ballroom won&amp;#039;t ignore rest of the building&lt;br /&gt;
* basement is connected to ballroom because they share the floor&lt;/div&gt;</summary>
		<author><name>Kkr</name></author>
	</entry>
	<entry>
		<id>https://omnicommons.org/mediawiki/index.php?title=Event:2015/08/10_Building_Working_Group&amp;diff=3877</id>
		<title>Event:2015/08/10 Building Working Group</title>
		<link rel="alternate" type="text/html" href="https://omnicommons.org/mediawiki/index.php?title=Event:2015/08/10_Building_Working_Group&amp;diff=3877"/>
		<updated>2015-08-13T00:24:01Z</updated>

		<summary type="html">&lt;p&gt;Kkr: /* Disco Room */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Building WG August 10&lt;br /&gt;
&lt;br /&gt;
last week: https://omnicommons.org/wiki/Event:2015/08/03_Building_Working_Group&lt;br /&gt;
&lt;br /&gt;
== who&amp;#039;s here? ==&lt;br /&gt;
* rob, daniel, mary, matt, yar, joe, kerrie, laura late&lt;br /&gt;
&lt;br /&gt;
== south wall ==&lt;br /&gt;
* saturday work party was great! whitney said no safety issues, ready for inspection. just need to recap some wires because they weren&amp;#039;t twisted first, and connect some wires to their breakers.&lt;br /&gt;
* conduit against the wall needs a &amp;quot;dog-ear bend&amp;quot; to be against the wall, not just sitting straight - but this is ok for inspection right now&lt;br /&gt;
* matt says these will take &amp;quot;almost no time&amp;quot;&lt;br /&gt;
* rob says we need more tyvek&lt;br /&gt;
* joe will schedule the inspection&lt;br /&gt;
* still didn&amp;#039;t finish the exit sign because it has to go on the drywall. last inspection will cover that.&lt;br /&gt;
&lt;br /&gt;
== doors ==&lt;br /&gt;
* still waiting on jessie to make plumb lines&lt;br /&gt;
* matt: we have an actual plumb bob in the closet&lt;br /&gt;
&lt;br /&gt;
== money ==&lt;br /&gt;
* Rob wants money for a can of black paint&lt;br /&gt;
* Also for &amp;quot;shoulder nut eyes&amp;quot; to mount our projector in the ballroom. Probably $40 for 5 total including shipping online.&lt;br /&gt;
* Does anyone know if we have this in budget or do we have to ask finance?&lt;br /&gt;
* Rob already looked at Urban Ore ...&lt;br /&gt;
* Daniel wants to buy more ethernet cable for the run from Rise Above to Sudoroom routers. Would make everyone&amp;#039;s internet faster. Would also help create stage lighting for the ballroom.&lt;br /&gt;
&lt;br /&gt;
== regular saturday workday? ==&lt;br /&gt;
* yar: how about we do this every week?&lt;br /&gt;
* we really need to have organizers come BEFORE volunteers&lt;br /&gt;
&lt;br /&gt;
= LA LISTA =&lt;br /&gt;
&lt;br /&gt;
== Ballroom Area ==&lt;br /&gt;
&lt;br /&gt;
=== A/V Room ===&lt;br /&gt;
* &amp;lt;s&amp;gt;Electrical subpanel: Either replace broken breaker switches with with working ones, or install factory blanks.&amp;lt;/s&amp;gt; &amp;lt;-- MATT ALREADY DID THIS&lt;br /&gt;
* Patch small hole above door where conduit is peeking through.&lt;br /&gt;
* Patch hole near floor in NW corner of this room near door jamb. &amp;lt;--In progress by kkr&lt;br /&gt;
&lt;br /&gt;
=== Bar ===&lt;br /&gt;
* soffet-mounted ceiling light fixtures need: lightbulbs tested / replaced if necc&lt;br /&gt;
* Put up ABC signage req. for pub or private parties w/ alcohol re: cancer/pregnancy warning&lt;br /&gt;
* Determine fix for leaking sink in 3-sink (weld?) - southmost sink (on left if you are behind bar)&lt;br /&gt;
* Install floor sink under 3-sink as per health code&lt;br /&gt;
* Outlets on east/shattuck-side wall need to be: removed, wire-nutted, wrapped in elec tape, covered with blank faceplates. TURN OFF CIRCUIT FIRST. Note: furthest N outlet not disconnected, only outlet in the center of the wall&lt;br /&gt;
&lt;br /&gt;
=== Ballroom-Shattuck Exit Area ===&lt;br /&gt;
* install closers to both inner doors. &lt;br /&gt;
* install panic bars to both inner doors.&lt;br /&gt;
* install panic bars to both outer doors.&lt;br /&gt;
* install light cover into flourescent panel (22&amp;quot;x3&amp;#039;) - flourescents are 2x 2&amp;#039; bulbs&lt;br /&gt;
&lt;br /&gt;
=== Stage ===&lt;br /&gt;
* Create wider storage openings under stage. Not insubstantial. See stage storage build plan.&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine ===&lt;br /&gt;
* SE staircase: Install new led strip lighting on ea. side of stair to replace dead lighting strips&lt;br /&gt;
* SW staircase down: motion detector installed onto light fixture.&lt;br /&gt;
* SW staircase up: Install new led strip lighting on ea. side of stair to replace dead lighting strips&lt;br /&gt;
* SW staircase up: Repair hole in south wall near floor immediately across from stairs (see south wall acoustic treatment)&lt;br /&gt;
* SW staircase up: Determination if 3-way switch needs to be installed at top of stair. Currently there is only a switch at bottom landing.&lt;br /&gt;
* SW staircase up: motion detector installed onto light fixture.&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine Bathroom ===&lt;br /&gt;
* outlet needs to be replaced with GFCI - Note: no ground; Gerald suggests decommissioning and installing new grounded plug in wall just above counter; go into wall from other side, need to locate grounded location&lt;br /&gt;
* active ventilation needs to be wired &amp;amp; installed (exhaust) in current ventilation window&lt;br /&gt;
* all exposed bulb fixtures need be replaced with covered fixtures (2x)&lt;br /&gt;
* install door stop so the door can be propped open sometimes.&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine &amp;quot;Book Room&amp;quot; ===&lt;br /&gt;
* 4&amp;quot;x4&amp;quot; Outlets affixed to top of Electrical subpanel must be removed from subpanel, and affixed to balcony (code violation) (3x)&lt;br /&gt;
* Electrical subpanel needs be moved to plywood wall south of panel, onto drywall, 2&amp;#039; from ground.&lt;br /&gt;
* 3-way switch wiring (for chandelier) inside subpanel needs to be removed and placed elsewhere as not ok in-panel.&lt;br /&gt;
* Install closer to Mezzanine room door&lt;br /&gt;
&lt;br /&gt;
=== Crow&amp;#039;s Nest ===&lt;br /&gt;
* Clear everything 3&amp;#039; in front of electrical subpanel including all cords, lighitng, etc&lt;br /&gt;
* acquire &amp;amp; install cover for light (fixture takes glass orb / cover around bulb, it is missing)&lt;br /&gt;
* Make main (east) door to this room better fitting / gasketed against all air gaps so it functions for soundproofing&lt;br /&gt;
* rebalance fan&lt;br /&gt;
* extend balcony railing to out in front of balcony hatch - on E side of R&amp;amp;J balcony (building &amp;amp; osha safety)&lt;br /&gt;
* Refinish &amp;amp; airgap-seal east wall above loft in this room so room functions as soundproofing / air barrier to exterior of bldg&lt;br /&gt;
* Install real doorknob, remove latch&lt;br /&gt;
* make north door to romeo &amp;amp; juliet balcony airtight (or better fitting) for turning this room into a soundproofing barrier&lt;br /&gt;
* Install closer to main (east) door&lt;br /&gt;
* Install closer to north / balcony door&lt;br /&gt;
* ensure balcony hatch is robust enough to support 300lb standing weight&lt;br /&gt;
&lt;br /&gt;
=== Ticketbooth Room ===&lt;br /&gt;
* Remove giant bookshelf and all debris/material from this room. Call Emerson - ask them to get their table back, or are they donating to us ? :)&lt;br /&gt;
* &amp;lt;s&amp;gt;Make metal grille outside window openable, so the casement window can open.&amp;lt;/s&amp;gt; &amp;lt;== This would increase security risk and is not a building requirement&lt;br /&gt;
* Install threshold plate to base of jamb (no more than 1/2&amp;quot; high as per ADA) to cut down on sound from ballroom &lt;br /&gt;
* Install closer to Ticketbooth room door (pref. good kind with long close time for wheelchair)&lt;br /&gt;
* Patch small hole in ceiling corner above ticket window where new conduit was run. &lt;br /&gt;
* install gaskets to door jambs to cut down on sound. (icarus)&lt;br /&gt;
&lt;br /&gt;
== Disco Room ==&lt;br /&gt;
* 4th window from main door as a broken pane&lt;br /&gt;
* 5th window from main door the window frame rub against the wall on E side&lt;br /&gt;
* light switch cover near 48th street door should be replaced by one with less-sharp edges (better-sized)&lt;br /&gt;
* weight load for high triangular shelves in corners to be assessed (julia) to determine if speakers etc can be placed there&lt;br /&gt;
&lt;br /&gt;
== La Commune == &lt;br /&gt;
* install closer to basement stairs door&lt;br /&gt;
* cover floor sink behind front counter area w minimum 3/4&amp;quot; plywood cut out and sealant (trip hazard/health)&lt;br /&gt;
* fix broken glass pane in 4th window west of front door in La Commune&lt;br /&gt;
* replace all low uncover lights near entrance w cover lights x3&lt;br /&gt;
* take out and cap OR at least cover w small platform the copper water lines along floor behind the front counter&lt;br /&gt;
* locked storage - unplug and store all extension cords&lt;br /&gt;
 &lt;br /&gt;
== Rise Above ==&lt;br /&gt;
* replace locking main door to Rise Above in hallway with twenty minute solid-core (fire-code)&lt;br /&gt;
* replace 2x hollow-core sliding doors with 20 minutes solid-core sliding doors (fire-code)&lt;br /&gt;
* replaced busted circuit breaker in every electrial panel (like in the 42 breaker panel) with either working breaker or factory blanks.&lt;br /&gt;
* put closer on main door to Rise Above&lt;br /&gt;
* remove 2x6 on ceiling on south side of room (COORDINATE WITH GABRIELA 1ST - move or cover all her stuff.&lt;br /&gt;
* stage left - install paper towel dispenser and paper towels.&lt;br /&gt;
&lt;br /&gt;
==  Sudo ==&lt;br /&gt;
* created dedicated space for storing excess lumber (long pieces), pipe, metal pieces, etc so they are not in jumbles (fire code).&lt;br /&gt;
* Stairwell - sand down sie of door so it does not stick closed so bad (belt sander optimal).&lt;br /&gt;
* west wall - run more 3/4&amp;quot; conduit further down west wall. Must know code.&lt;br /&gt;
&lt;br /&gt;
== Sudo/CCL ==&lt;br /&gt;
* along perimeter / walls do better job of affixing &amp;amp; routing low-voltage &amp;#039;inside wiring&amp;#039; ie all ethernet, phone cabling&lt;br /&gt;
* ballroom door - put closer on this door&lt;br /&gt;
* basement door - if possible, put closer on this door (may not be possible)&lt;br /&gt;
* entire room perimeter - 5LB ABC fire extinguishers at correct height every ~75&amp;#039; - starting w under each exit sign&lt;br /&gt;
* hallway door - install panic hardware &amp;amp; lock to this door&lt;br /&gt;
* hallway door - install closer to door&lt;br /&gt;
* ticket booth room - install new outlet (existing is cracked and not attached to wall)&lt;br /&gt;
&lt;br /&gt;
== TIL (TI) ==&lt;br /&gt;
* cover exposed wires in east wall (near bookshelf). can use a plate&lt;br /&gt;
* get clear cover to put over wall switch for old electric timer in wall in big bookshelf unit in south wall of TL&lt;br /&gt;
&lt;br /&gt;
.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Basement ==&lt;br /&gt;
&lt;br /&gt;
* south wall: close holes in basement wall where opened to remove mold.&lt;br /&gt;
* identify stuff in bunker rooms &amp;amp; hallway: what is Phat Beets, Black Holes, what is junk/unclaimed?&lt;br /&gt;
* west wall: re-connect or newly connect toggle switch to basement ventilation fan in basement. Currently breakers turn it on.&lt;br /&gt;
* Phat Beets room ventilation doesn&amp;#039;t work. people can suffocate in there.&lt;br /&gt;
&lt;br /&gt;
=== ceiling ===&lt;br /&gt;
* Acquire &amp;amp; install light fixture covers for the 4&amp;#039; flourescent fixtures in basement offices (bunker rooms) - roughly ~48&amp;quot;x16&amp;quot;. &lt;br /&gt;
* install protective bulb covers over remaining working 8&amp;#039; flourescents: 6x&lt;br /&gt;
* unscrew piece of broken lightbulb from East basement hallway, replace bare-bulb fixture with covered fixture&lt;br /&gt;
* re-attach and restore service to entire strip of 8&amp;#039; flourescents along west wall (closest to sudo) that had been decommissioned&lt;br /&gt;
* acquire and affix 1&amp;#039;x1&amp;#039; ceiling tiles in NW corner of basement, so lighting fixture &amp;amp; strip of lights can be re-connected. ~120 tiles&lt;br /&gt;
* Cut &amp;amp; attach drywall AND then also affix 1&amp;#039;x1&amp;#039; ceiling tiles to exposed ceiling areas in basement (2 areas)&lt;br /&gt;
* Replace bad ballast in any 8&amp;#039; flourescent fixture (that is not turning on. If not sure try lights in it that do work in another fixture.&lt;br /&gt;
&lt;br /&gt;
=== kitchen ===&lt;br /&gt;
* Purchase and affix Class-K extinguisher at correct height&lt;br /&gt;
* Cover exposed wiring in FNB locked-pantry ceiling (with e.g. metal plate)&lt;br /&gt;
* Install Ansul fire-suppression in hood&lt;br /&gt;
* Replace entire 4&amp;#039; flourescent light fixture closest to stove (has 1x broken tube holder)&lt;br /&gt;
* Resurface kitchen floor, cover with quarry tile&lt;br /&gt;
* Knock out / expand west kitchen wall to next-west supporting pipe&lt;br /&gt;
* Fix or replace corroded window frames along shattuck&lt;br /&gt;
* Cut in mop sink in westmost pantry area&lt;br /&gt;
* Acquire and install tankless water heater, check gas line diameter &amp;amp; exhaust ductwork &lt;br /&gt;
* Acquire makeup air into kitchen (remove desk fan from duct, replace with something to code - 95% of hood CFM)&lt;br /&gt;
* Put closers on both basement kitchen doors&lt;br /&gt;
* Remove firred-out drywall, cover with FRP&lt;br /&gt;
* steam clean stove hood&lt;br /&gt;
&lt;br /&gt;
== Milestones ==&lt;br /&gt;
&lt;br /&gt;
* yar: what&amp;#039;s our next milestone? passing fire inspection for just the ballroom or the whole building?&lt;br /&gt;
* matt: ballroom&amp;#039;s most complicated because it&amp;#039;s classified as &amp;quot;assembly&amp;quot;. but inspector coming to ballroom won&amp;#039;t ignore rest of the building&lt;br /&gt;
* basement is connected to ballroom because they share the floor&lt;/div&gt;</summary>
		<author><name>Kkr</name></author>
	</entry>
	<entry>
		<id>https://omnicommons.org/mediawiki/index.php?title=Event:2015/08/10_Building_Working_Group&amp;diff=3876</id>
		<title>Event:2015/08/10 Building Working Group</title>
		<link rel="alternate" type="text/html" href="https://omnicommons.org/mediawiki/index.php?title=Event:2015/08/10_Building_Working_Group&amp;diff=3876"/>
		<updated>2015-08-13T00:22:18Z</updated>

		<summary type="html">&lt;p&gt;Kkr: /* Disco Room */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Building WG August 10&lt;br /&gt;
&lt;br /&gt;
last week: https://omnicommons.org/wiki/Event:2015/08/03_Building_Working_Group&lt;br /&gt;
&lt;br /&gt;
== who&amp;#039;s here? ==&lt;br /&gt;
* rob, daniel, mary, matt, yar, joe, kerrie, laura late&lt;br /&gt;
&lt;br /&gt;
== south wall ==&lt;br /&gt;
* saturday work party was great! whitney said no safety issues, ready for inspection. just need to recap some wires because they weren&amp;#039;t twisted first, and connect some wires to their breakers.&lt;br /&gt;
* conduit against the wall needs a &amp;quot;dog-ear bend&amp;quot; to be against the wall, not just sitting straight - but this is ok for inspection right now&lt;br /&gt;
* matt says these will take &amp;quot;almost no time&amp;quot;&lt;br /&gt;
* rob says we need more tyvek&lt;br /&gt;
* joe will schedule the inspection&lt;br /&gt;
* still didn&amp;#039;t finish the exit sign because it has to go on the drywall. last inspection will cover that.&lt;br /&gt;
&lt;br /&gt;
== doors ==&lt;br /&gt;
* still waiting on jessie to make plumb lines&lt;br /&gt;
* matt: we have an actual plumb bob in the closet&lt;br /&gt;
&lt;br /&gt;
== money ==&lt;br /&gt;
* Rob wants money for a can of black paint&lt;br /&gt;
* Also for &amp;quot;shoulder nut eyes&amp;quot; to mount our projector in the ballroom. Probably $40 for 5 total including shipping online.&lt;br /&gt;
* Does anyone know if we have this in budget or do we have to ask finance?&lt;br /&gt;
* Rob already looked at Urban Ore ...&lt;br /&gt;
* Daniel wants to buy more ethernet cable for the run from Rise Above to Sudoroom routers. Would make everyone&amp;#039;s internet faster. Would also help create stage lighting for the ballroom.&lt;br /&gt;
&lt;br /&gt;
== regular saturday workday? ==&lt;br /&gt;
* yar: how about we do this every week?&lt;br /&gt;
* we really need to have organizers come BEFORE volunteers&lt;br /&gt;
&lt;br /&gt;
= LA LISTA =&lt;br /&gt;
&lt;br /&gt;
== Ballroom Area ==&lt;br /&gt;
&lt;br /&gt;
=== A/V Room ===&lt;br /&gt;
* &amp;lt;s&amp;gt;Electrical subpanel: Either replace broken breaker switches with with working ones, or install factory blanks.&amp;lt;/s&amp;gt; &amp;lt;-- MATT ALREADY DID THIS&lt;br /&gt;
* Patch small hole above door where conduit is peeking through.&lt;br /&gt;
* Patch hole near floor in NW corner of this room near door jamb. &amp;lt;--In progress by kkr&lt;br /&gt;
&lt;br /&gt;
=== Bar ===&lt;br /&gt;
* soffet-mounted ceiling light fixtures need: lightbulbs tested / replaced if necc&lt;br /&gt;
* Put up ABC signage req. for pub or private parties w/ alcohol re: cancer/pregnancy warning&lt;br /&gt;
* Determine fix for leaking sink in 3-sink (weld?) - southmost sink (on left if you are behind bar)&lt;br /&gt;
* Install floor sink under 3-sink as per health code&lt;br /&gt;
* Outlets on east/shattuck-side wall need to be: removed, wire-nutted, wrapped in elec tape, covered with blank faceplates. TURN OFF CIRCUIT FIRST. Note: furthest N outlet not disconnected, only outlet in the center of the wall&lt;br /&gt;
&lt;br /&gt;
=== Ballroom-Shattuck Exit Area ===&lt;br /&gt;
* install closers to both inner doors. &lt;br /&gt;
* install panic bars to both inner doors.&lt;br /&gt;
* install panic bars to both outer doors.&lt;br /&gt;
* install light cover into flourescent panel (22&amp;quot;x3&amp;#039;) - flourescents are 2x 2&amp;#039; bulbs&lt;br /&gt;
&lt;br /&gt;
=== Stage ===&lt;br /&gt;
* Create wider storage openings under stage. Not insubstantial. See stage storage build plan.&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine ===&lt;br /&gt;
* SE staircase: Install new led strip lighting on ea. side of stair to replace dead lighting strips&lt;br /&gt;
* SW staircase down: motion detector installed onto light fixture.&lt;br /&gt;
* SW staircase up: Install new led strip lighting on ea. side of stair to replace dead lighting strips&lt;br /&gt;
* SW staircase up: Repair hole in south wall near floor immediately across from stairs (see south wall acoustic treatment)&lt;br /&gt;
* SW staircase up: Determination if 3-way switch needs to be installed at top of stair. Currently there is only a switch at bottom landing.&lt;br /&gt;
* SW staircase up: motion detector installed onto light fixture.&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine Bathroom ===&lt;br /&gt;
* outlet needs to be replaced with GFCI - Note: no ground; Gerald suggests decommissioning and installing new grounded plug in wall just above counter; go into wall from other side, need to locate grounded location&lt;br /&gt;
* active ventilation needs to be wired &amp;amp; installed (exhaust) in current ventilation window&lt;br /&gt;
* all exposed bulb fixtures need be replaced with covered fixtures (2x)&lt;br /&gt;
* install door stop so the door can be propped open sometimes.&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine &amp;quot;Book Room&amp;quot; ===&lt;br /&gt;
* 4&amp;quot;x4&amp;quot; Outlets affixed to top of Electrical subpanel must be removed from subpanel, and affixed to balcony (code violation) (3x)&lt;br /&gt;
* Electrical subpanel needs be moved to plywood wall south of panel, onto drywall, 2&amp;#039; from ground.&lt;br /&gt;
* 3-way switch wiring (for chandelier) inside subpanel needs to be removed and placed elsewhere as not ok in-panel.&lt;br /&gt;
* Install closer to Mezzanine room door&lt;br /&gt;
&lt;br /&gt;
=== Crow&amp;#039;s Nest ===&lt;br /&gt;
* Clear everything 3&amp;#039; in front of electrical subpanel including all cords, lighitng, etc&lt;br /&gt;
* acquire &amp;amp; install cover for light (fixture takes glass orb / cover around bulb, it is missing)&lt;br /&gt;
* Make main (east) door to this room better fitting / gasketed against all air gaps so it functions for soundproofing&lt;br /&gt;
* rebalance fan&lt;br /&gt;
* extend balcony railing to out in front of balcony hatch - on E side of R&amp;amp;J balcony (building &amp;amp; osha safety)&lt;br /&gt;
* Refinish &amp;amp; airgap-seal east wall above loft in this room so room functions as soundproofing / air barrier to exterior of bldg&lt;br /&gt;
* Install real doorknob, remove latch&lt;br /&gt;
* make north door to romeo &amp;amp; juliet balcony airtight (or better fitting) for turning this room into a soundproofing barrier&lt;br /&gt;
* Install closer to main (east) door&lt;br /&gt;
* Install closer to north / balcony door&lt;br /&gt;
* ensure balcony hatch is robust enough to support 300lb standing weight&lt;br /&gt;
&lt;br /&gt;
=== Ticketbooth Room ===&lt;br /&gt;
* Remove giant bookshelf and all debris/material from this room. Call Emerson - ask them to get their table back, or are they donating to us ? :)&lt;br /&gt;
* &amp;lt;s&amp;gt;Make metal grille outside window openable, so the casement window can open.&amp;lt;/s&amp;gt; &amp;lt;== This would increase security risk and is not a building requirement&lt;br /&gt;
* Install threshold plate to base of jamb (no more than 1/2&amp;quot; high as per ADA) to cut down on sound from ballroom &lt;br /&gt;
* Install closer to Ticketbooth room door (pref. good kind with long close time for wheelchair)&lt;br /&gt;
* Patch small hole in ceiling corner above ticket window where new conduit was run. &lt;br /&gt;
* install gaskets to door jambs to cut down on sound. (icarus)&lt;br /&gt;
&lt;br /&gt;
== Disco Room ==&lt;br /&gt;
* 4th window from main door as a broken pane&lt;br /&gt;
* 5th window from main door the window frame rub against the wall on E side&lt;br /&gt;
* light switch cover near 48th street door should be replaced by one with less-sharp edges (better-sized)&lt;br /&gt;
* weight load for high triangular shelves in corners to be assessed (julia) to determine if speakers etc cable placed there&lt;br /&gt;
&lt;br /&gt;
== La Commune == &lt;br /&gt;
* install closer to basement stairs door&lt;br /&gt;
* cover floor sink behind front counter area w minimum 3/4&amp;quot; plywood cut out and sealant (trip hazard/health)&lt;br /&gt;
* fix broken glass pane in 4th window west of front door in La Commune&lt;br /&gt;
* replace all low uncover lights near entrance w cover lights x3&lt;br /&gt;
* take out and cap OR at least cover w small platform the copper water lines along floor behind the front counter&lt;br /&gt;
* locked storage - unplug and store all extension cords&lt;br /&gt;
 &lt;br /&gt;
== Rise Above ==&lt;br /&gt;
* replace locking main door to Rise Above in hallway with twenty minute solid-core (fire-code)&lt;br /&gt;
* replace 2x hollow-core sliding doors with 20 minutes solid-core sliding doors (fire-code)&lt;br /&gt;
* replaced busted circuit breaker in every electrial panel (like in the 42 breaker panel) with either working breaker or factory blanks.&lt;br /&gt;
* put closer on main door to Rise Above&lt;br /&gt;
* remove 2x6 on ceiling on south side of room (COORDINATE WITH GABRIELA 1ST - move or cover all her stuff.&lt;br /&gt;
* stage left - install paper towel dispenser and paper towels.&lt;br /&gt;
&lt;br /&gt;
==  Sudo ==&lt;br /&gt;
* created dedicated space for storing excess lumber (long pieces), pipe, metal pieces, etc so they are not in jumbles (fire code).&lt;br /&gt;
* Stairwell - sand down sie of door so it does not stick closed so bad (belt sander optimal).&lt;br /&gt;
* west wall - run more 3/4&amp;quot; conduit further down west wall. Must know code.&lt;br /&gt;
&lt;br /&gt;
== Sudo/CCL ==&lt;br /&gt;
* along perimeter / walls do better job of affixing &amp;amp; routing low-voltage &amp;#039;inside wiring&amp;#039; ie all ethernet, phone cabling&lt;br /&gt;
* ballroom door - put closer on this door&lt;br /&gt;
* basement door - if possible, put closer on this door (may not be possible)&lt;br /&gt;
* entire room perimeter - 5LB ABC fire extinguishers at correct height every ~75&amp;#039; - starting w under each exit sign&lt;br /&gt;
* hallway door - install panic hardware &amp;amp; lock to this door&lt;br /&gt;
* hallway door - install closer to door&lt;br /&gt;
* ticket booth room - install new outlet (existing is cracked and not attached to wall)&lt;br /&gt;
&lt;br /&gt;
== TIL (TI) ==&lt;br /&gt;
* cover exposed wires in east wall (near bookshelf). can use a plate&lt;br /&gt;
* get clear cover to put over wall switch for old electric timer in wall in big bookshelf unit in south wall of TL&lt;br /&gt;
&lt;br /&gt;
.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Basement ==&lt;br /&gt;
&lt;br /&gt;
* south wall: close holes in basement wall where opened to remove mold.&lt;br /&gt;
* identify stuff in bunker rooms &amp;amp; hallway: what is Phat Beets, Black Holes, what is junk/unclaimed?&lt;br /&gt;
* west wall: re-connect or newly connect toggle switch to basement ventilation fan in basement. Currently breakers turn it on.&lt;br /&gt;
* Phat Beets room ventilation doesn&amp;#039;t work. people can suffocate in there.&lt;br /&gt;
&lt;br /&gt;
=== ceiling ===&lt;br /&gt;
* Acquire &amp;amp; install light fixture covers for the 4&amp;#039; flourescent fixtures in basement offices (bunker rooms) - roughly ~48&amp;quot;x16&amp;quot;. &lt;br /&gt;
* install protective bulb covers over remaining working 8&amp;#039; flourescents: 6x&lt;br /&gt;
* unscrew piece of broken lightbulb from East basement hallway, replace bare-bulb fixture with covered fixture&lt;br /&gt;
* re-attach and restore service to entire strip of 8&amp;#039; flourescents along west wall (closest to sudo) that had been decommissioned&lt;br /&gt;
* acquire and affix 1&amp;#039;x1&amp;#039; ceiling tiles in NW corner of basement, so lighting fixture &amp;amp; strip of lights can be re-connected. ~120 tiles&lt;br /&gt;
* Cut &amp;amp; attach drywall AND then also affix 1&amp;#039;x1&amp;#039; ceiling tiles to exposed ceiling areas in basement (2 areas)&lt;br /&gt;
* Replace bad ballast in any 8&amp;#039; flourescent fixture (that is not turning on. If not sure try lights in it that do work in another fixture.&lt;br /&gt;
&lt;br /&gt;
=== kitchen ===&lt;br /&gt;
* Purchase and affix Class-K extinguisher at correct height&lt;br /&gt;
* Cover exposed wiring in FNB locked-pantry ceiling (with e.g. metal plate)&lt;br /&gt;
* Install Ansul fire-suppression in hood&lt;br /&gt;
* Replace entire 4&amp;#039; flourescent light fixture closest to stove (has 1x broken tube holder)&lt;br /&gt;
* Resurface kitchen floor, cover with quarry tile&lt;br /&gt;
* Knock out / expand west kitchen wall to next-west supporting pipe&lt;br /&gt;
* Fix or replace corroded window frames along shattuck&lt;br /&gt;
* Cut in mop sink in westmost pantry area&lt;br /&gt;
* Acquire and install tankless water heater, check gas line diameter &amp;amp; exhaust ductwork &lt;br /&gt;
* Acquire makeup air into kitchen (remove desk fan from duct, replace with something to code - 95% of hood CFM)&lt;br /&gt;
* Put closers on both basement kitchen doors&lt;br /&gt;
* Remove firred-out drywall, cover with FRP&lt;br /&gt;
* steam clean stove hood&lt;br /&gt;
&lt;br /&gt;
== Milestones ==&lt;br /&gt;
&lt;br /&gt;
* yar: what&amp;#039;s our next milestone? passing fire inspection for just the ballroom or the whole building?&lt;br /&gt;
* matt: ballroom&amp;#039;s most complicated because it&amp;#039;s classified as &amp;quot;assembly&amp;quot;. but inspector coming to ballroom won&amp;#039;t ignore rest of the building&lt;br /&gt;
* basement is connected to ballroom because they share the floor&lt;/div&gt;</summary>
		<author><name>Kkr</name></author>
	</entry>
	<entry>
		<id>https://omnicommons.org/mediawiki/index.php?title=Event:2015/08/10_Building_Working_Group&amp;diff=3875</id>
		<title>Event:2015/08/10 Building Working Group</title>
		<link rel="alternate" type="text/html" href="https://omnicommons.org/mediawiki/index.php?title=Event:2015/08/10_Building_Working_Group&amp;diff=3875"/>
		<updated>2015-08-13T00:21:17Z</updated>

		<summary type="html">&lt;p&gt;Kkr: /* Ticketbooth Room */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Building WG August 10&lt;br /&gt;
&lt;br /&gt;
last week: https://omnicommons.org/wiki/Event:2015/08/03_Building_Working_Group&lt;br /&gt;
&lt;br /&gt;
== who&amp;#039;s here? ==&lt;br /&gt;
* rob, daniel, mary, matt, yar, joe, kerrie, laura late&lt;br /&gt;
&lt;br /&gt;
== south wall ==&lt;br /&gt;
* saturday work party was great! whitney said no safety issues, ready for inspection. just need to recap some wires because they weren&amp;#039;t twisted first, and connect some wires to their breakers.&lt;br /&gt;
* conduit against the wall needs a &amp;quot;dog-ear bend&amp;quot; to be against the wall, not just sitting straight - but this is ok for inspection right now&lt;br /&gt;
* matt says these will take &amp;quot;almost no time&amp;quot;&lt;br /&gt;
* rob says we need more tyvek&lt;br /&gt;
* joe will schedule the inspection&lt;br /&gt;
* still didn&amp;#039;t finish the exit sign because it has to go on the drywall. last inspection will cover that.&lt;br /&gt;
&lt;br /&gt;
== doors ==&lt;br /&gt;
* still waiting on jessie to make plumb lines&lt;br /&gt;
* matt: we have an actual plumb bob in the closet&lt;br /&gt;
&lt;br /&gt;
== money ==&lt;br /&gt;
* Rob wants money for a can of black paint&lt;br /&gt;
* Also for &amp;quot;shoulder nut eyes&amp;quot; to mount our projector in the ballroom. Probably $40 for 5 total including shipping online.&lt;br /&gt;
* Does anyone know if we have this in budget or do we have to ask finance?&lt;br /&gt;
* Rob already looked at Urban Ore ...&lt;br /&gt;
* Daniel wants to buy more ethernet cable for the run from Rise Above to Sudoroom routers. Would make everyone&amp;#039;s internet faster. Would also help create stage lighting for the ballroom.&lt;br /&gt;
&lt;br /&gt;
== regular saturday workday? ==&lt;br /&gt;
* yar: how about we do this every week?&lt;br /&gt;
* we really need to have organizers come BEFORE volunteers&lt;br /&gt;
&lt;br /&gt;
= LA LISTA =&lt;br /&gt;
&lt;br /&gt;
== Ballroom Area ==&lt;br /&gt;
&lt;br /&gt;
=== A/V Room ===&lt;br /&gt;
* &amp;lt;s&amp;gt;Electrical subpanel: Either replace broken breaker switches with with working ones, or install factory blanks.&amp;lt;/s&amp;gt; &amp;lt;-- MATT ALREADY DID THIS&lt;br /&gt;
* Patch small hole above door where conduit is peeking through.&lt;br /&gt;
* Patch hole near floor in NW corner of this room near door jamb. &amp;lt;--In progress by kkr&lt;br /&gt;
&lt;br /&gt;
=== Bar ===&lt;br /&gt;
* soffet-mounted ceiling light fixtures need: lightbulbs tested / replaced if necc&lt;br /&gt;
* Put up ABC signage req. for pub or private parties w/ alcohol re: cancer/pregnancy warning&lt;br /&gt;
* Determine fix for leaking sink in 3-sink (weld?) - southmost sink (on left if you are behind bar)&lt;br /&gt;
* Install floor sink under 3-sink as per health code&lt;br /&gt;
* Outlets on east/shattuck-side wall need to be: removed, wire-nutted, wrapped in elec tape, covered with blank faceplates. TURN OFF CIRCUIT FIRST. Note: furthest N outlet not disconnected, only outlet in the center of the wall&lt;br /&gt;
&lt;br /&gt;
=== Ballroom-Shattuck Exit Area ===&lt;br /&gt;
* install closers to both inner doors. &lt;br /&gt;
* install panic bars to both inner doors.&lt;br /&gt;
* install panic bars to both outer doors.&lt;br /&gt;
* install light cover into flourescent panel (22&amp;quot;x3&amp;#039;) - flourescents are 2x 2&amp;#039; bulbs&lt;br /&gt;
&lt;br /&gt;
=== Stage ===&lt;br /&gt;
* Create wider storage openings under stage. Not insubstantial. See stage storage build plan.&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine ===&lt;br /&gt;
* SE staircase: Install new led strip lighting on ea. side of stair to replace dead lighting strips&lt;br /&gt;
* SW staircase down: motion detector installed onto light fixture.&lt;br /&gt;
* SW staircase up: Install new led strip lighting on ea. side of stair to replace dead lighting strips&lt;br /&gt;
* SW staircase up: Repair hole in south wall near floor immediately across from stairs (see south wall acoustic treatment)&lt;br /&gt;
* SW staircase up: Determination if 3-way switch needs to be installed at top of stair. Currently there is only a switch at bottom landing.&lt;br /&gt;
* SW staircase up: motion detector installed onto light fixture.&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine Bathroom ===&lt;br /&gt;
* outlet needs to be replaced with GFCI - Note: no ground; Gerald suggests decommissioning and installing new grounded plug in wall just above counter; go into wall from other side, need to locate grounded location&lt;br /&gt;
* active ventilation needs to be wired &amp;amp; installed (exhaust) in current ventilation window&lt;br /&gt;
* all exposed bulb fixtures need be replaced with covered fixtures (2x)&lt;br /&gt;
* install door stop so the door can be propped open sometimes.&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine &amp;quot;Book Room&amp;quot; ===&lt;br /&gt;
* 4&amp;quot;x4&amp;quot; Outlets affixed to top of Electrical subpanel must be removed from subpanel, and affixed to balcony (code violation) (3x)&lt;br /&gt;
* Electrical subpanel needs be moved to plywood wall south of panel, onto drywall, 2&amp;#039; from ground.&lt;br /&gt;
* 3-way switch wiring (for chandelier) inside subpanel needs to be removed and placed elsewhere as not ok in-panel.&lt;br /&gt;
* Install closer to Mezzanine room door&lt;br /&gt;
&lt;br /&gt;
=== Crow&amp;#039;s Nest ===&lt;br /&gt;
* Clear everything 3&amp;#039; in front of electrical subpanel including all cords, lighitng, etc&lt;br /&gt;
* acquire &amp;amp; install cover for light (fixture takes glass orb / cover around bulb, it is missing)&lt;br /&gt;
* Make main (east) door to this room better fitting / gasketed against all air gaps so it functions for soundproofing&lt;br /&gt;
* rebalance fan&lt;br /&gt;
* extend balcony railing to out in front of balcony hatch - on E side of R&amp;amp;J balcony (building &amp;amp; osha safety)&lt;br /&gt;
* Refinish &amp;amp; airgap-seal east wall above loft in this room so room functions as soundproofing / air barrier to exterior of bldg&lt;br /&gt;
* Install real doorknob, remove latch&lt;br /&gt;
* make north door to romeo &amp;amp; juliet balcony airtight (or better fitting) for turning this room into a soundproofing barrier&lt;br /&gt;
* Install closer to main (east) door&lt;br /&gt;
* Install closer to north / balcony door&lt;br /&gt;
* ensure balcony hatch is robust enough to support 300lb standing weight&lt;br /&gt;
&lt;br /&gt;
=== Ticketbooth Room ===&lt;br /&gt;
* Remove giant bookshelf and all debris/material from this room. Call Emerson - ask them to get their table back, or are they donating to us ? :)&lt;br /&gt;
* &amp;lt;s&amp;gt;Make metal grille outside window openable, so the casement window can open.&amp;lt;/s&amp;gt; &amp;lt;== This would increase security risk and is not a building requirement&lt;br /&gt;
* Install threshold plate to base of jamb (no more than 1/2&amp;quot; high as per ADA) to cut down on sound from ballroom &lt;br /&gt;
* Install closer to Ticketbooth room door (pref. good kind with long close time for wheelchair)&lt;br /&gt;
* Patch small hole in ceiling corner above ticket window where new conduit was run. &lt;br /&gt;
* install gaskets to door jambs to cut down on sound. (icarus)&lt;br /&gt;
&lt;br /&gt;
== Disco Room ==&lt;br /&gt;
* 4th window from main door as a broken pane&lt;br /&gt;
* 5th window from main door the window frame rub against the wall on E side&lt;br /&gt;
* light switch cover near 48th street door should be replaced wint one with less-sharp edges (better-sized)&lt;br /&gt;
* weight load for high triangular shelves in corners to be assessed (julia) to determine if speakers etc cabe placed there&lt;br /&gt;
&lt;br /&gt;
== La Commune == &lt;br /&gt;
* install closer to basement stairs door&lt;br /&gt;
* cover floor sink behind front counter area w minimum 3/4&amp;quot; plywood cut out and sealant (trip hazard/health)&lt;br /&gt;
* fix broken glass pane in 4th window west of front door in La Commune&lt;br /&gt;
* replace all low uncover lights near entrance w cover lights x3&lt;br /&gt;
* take out and cap OR at least cover w small platform the copper water lines along floor behind the front counter&lt;br /&gt;
* locked storage - unplug and store all extension cords&lt;br /&gt;
 &lt;br /&gt;
== Rise Above ==&lt;br /&gt;
* replace locking main door to Rise Above in hallway with twenty minute solid-core (fire-code)&lt;br /&gt;
* replace 2x hollow-core sliding doors with 20 minutes solid-core sliding doors (fire-code)&lt;br /&gt;
* replaced busted circuit breaker in every electrial panel (like in the 42 breaker panel) with either working breaker or factory blanks.&lt;br /&gt;
* put closer on main door to Rise Above&lt;br /&gt;
* remove 2x6 on ceiling on south side of room (COORDINATE WITH GABRIELA 1ST - move or cover all her stuff.&lt;br /&gt;
* stage left - install paper towel dispenser and paper towels.&lt;br /&gt;
&lt;br /&gt;
==  Sudo ==&lt;br /&gt;
* created dedicated space for storing excess lumber (long pieces), pipe, metal pieces, etc so they are not in jumbles (fire code).&lt;br /&gt;
* Stairwell - sand down sie of door so it does not stick closed so bad (belt sander optimal).&lt;br /&gt;
* west wall - run more 3/4&amp;quot; conduit further down west wall. Must know code.&lt;br /&gt;
&lt;br /&gt;
== Sudo/CCL ==&lt;br /&gt;
* along perimeter / walls do better job of affixing &amp;amp; routing low-voltage &amp;#039;inside wiring&amp;#039; ie all ethernet, phone cabling&lt;br /&gt;
* ballroom door - put closer on this door&lt;br /&gt;
* basement door - if possible, put closer on this door (may not be possible)&lt;br /&gt;
* entire room perimeter - 5LB ABC fire extinguishers at correct height every ~75&amp;#039; - starting w under each exit sign&lt;br /&gt;
* hallway door - install panic hardware &amp;amp; lock to this door&lt;br /&gt;
* hallway door - install closer to door&lt;br /&gt;
* ticket booth room - install new outlet (existing is cracked and not attached to wall)&lt;br /&gt;
&lt;br /&gt;
== TIL (TI) ==&lt;br /&gt;
* cover exposed wires in east wall (near bookshelf). can use a plate&lt;br /&gt;
* get clear cover to put over wall switch for old electric timer in wall in big bookshelf unit in south wall of TL&lt;br /&gt;
&lt;br /&gt;
.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Basement ==&lt;br /&gt;
&lt;br /&gt;
* south wall: close holes in basement wall where opened to remove mold.&lt;br /&gt;
* identify stuff in bunker rooms &amp;amp; hallway: what is Phat Beets, Black Holes, what is junk/unclaimed?&lt;br /&gt;
* west wall: re-connect or newly connect toggle switch to basement ventilation fan in basement. Currently breakers turn it on.&lt;br /&gt;
* Phat Beets room ventilation doesn&amp;#039;t work. people can suffocate in there.&lt;br /&gt;
&lt;br /&gt;
=== ceiling ===&lt;br /&gt;
* Acquire &amp;amp; install light fixture covers for the 4&amp;#039; flourescent fixtures in basement offices (bunker rooms) - roughly ~48&amp;quot;x16&amp;quot;. &lt;br /&gt;
* install protective bulb covers over remaining working 8&amp;#039; flourescents: 6x&lt;br /&gt;
* unscrew piece of broken lightbulb from East basement hallway, replace bare-bulb fixture with covered fixture&lt;br /&gt;
* re-attach and restore service to entire strip of 8&amp;#039; flourescents along west wall (closest to sudo) that had been decommissioned&lt;br /&gt;
* acquire and affix 1&amp;#039;x1&amp;#039; ceiling tiles in NW corner of basement, so lighting fixture &amp;amp; strip of lights can be re-connected. ~120 tiles&lt;br /&gt;
* Cut &amp;amp; attach drywall AND then also affix 1&amp;#039;x1&amp;#039; ceiling tiles to exposed ceiling areas in basement (2 areas)&lt;br /&gt;
* Replace bad ballast in any 8&amp;#039; flourescent fixture (that is not turning on. If not sure try lights in it that do work in another fixture.&lt;br /&gt;
&lt;br /&gt;
=== kitchen ===&lt;br /&gt;
* Purchase and affix Class-K extinguisher at correct height&lt;br /&gt;
* Cover exposed wiring in FNB locked-pantry ceiling (with e.g. metal plate)&lt;br /&gt;
* Install Ansul fire-suppression in hood&lt;br /&gt;
* Replace entire 4&amp;#039; flourescent light fixture closest to stove (has 1x broken tube holder)&lt;br /&gt;
* Resurface kitchen floor, cover with quarry tile&lt;br /&gt;
* Knock out / expand west kitchen wall to next-west supporting pipe&lt;br /&gt;
* Fix or replace corroded window frames along shattuck&lt;br /&gt;
* Cut in mop sink in westmost pantry area&lt;br /&gt;
* Acquire and install tankless water heater, check gas line diameter &amp;amp; exhaust ductwork &lt;br /&gt;
* Acquire makeup air into kitchen (remove desk fan from duct, replace with something to code - 95% of hood CFM)&lt;br /&gt;
* Put closers on both basement kitchen doors&lt;br /&gt;
* Remove firred-out drywall, cover with FRP&lt;br /&gt;
* steam clean stove hood&lt;br /&gt;
&lt;br /&gt;
== Milestones ==&lt;br /&gt;
&lt;br /&gt;
* yar: what&amp;#039;s our next milestone? passing fire inspection for just the ballroom or the whole building?&lt;br /&gt;
* matt: ballroom&amp;#039;s most complicated because it&amp;#039;s classified as &amp;quot;assembly&amp;quot;. but inspector coming to ballroom won&amp;#039;t ignore rest of the building&lt;br /&gt;
* basement is connected to ballroom because they share the floor&lt;/div&gt;</summary>
		<author><name>Kkr</name></author>
	</entry>
	<entry>
		<id>https://omnicommons.org/mediawiki/index.php?title=Event:2015/08/10_Building_Working_Group&amp;diff=3874</id>
		<title>Event:2015/08/10 Building Working Group</title>
		<link rel="alternate" type="text/html" href="https://omnicommons.org/mediawiki/index.php?title=Event:2015/08/10_Building_Working_Group&amp;diff=3874"/>
		<updated>2015-08-13T00:19:54Z</updated>

		<summary type="html">&lt;p&gt;Kkr: /* Ticketbooth Room */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Building WG August 10&lt;br /&gt;
&lt;br /&gt;
last week: https://omnicommons.org/wiki/Event:2015/08/03_Building_Working_Group&lt;br /&gt;
&lt;br /&gt;
== who&amp;#039;s here? ==&lt;br /&gt;
* rob, daniel, mary, matt, yar, joe, kerrie, laura late&lt;br /&gt;
&lt;br /&gt;
== south wall ==&lt;br /&gt;
* saturday work party was great! whitney said no safety issues, ready for inspection. just need to recap some wires because they weren&amp;#039;t twisted first, and connect some wires to their breakers.&lt;br /&gt;
* conduit against the wall needs a &amp;quot;dog-ear bend&amp;quot; to be against the wall, not just sitting straight - but this is ok for inspection right now&lt;br /&gt;
* matt says these will take &amp;quot;almost no time&amp;quot;&lt;br /&gt;
* rob says we need more tyvek&lt;br /&gt;
* joe will schedule the inspection&lt;br /&gt;
* still didn&amp;#039;t finish the exit sign because it has to go on the drywall. last inspection will cover that.&lt;br /&gt;
&lt;br /&gt;
== doors ==&lt;br /&gt;
* still waiting on jessie to make plumb lines&lt;br /&gt;
* matt: we have an actual plumb bob in the closet&lt;br /&gt;
&lt;br /&gt;
== money ==&lt;br /&gt;
* Rob wants money for a can of black paint&lt;br /&gt;
* Also for &amp;quot;shoulder nut eyes&amp;quot; to mount our projector in the ballroom. Probably $40 for 5 total including shipping online.&lt;br /&gt;
* Does anyone know if we have this in budget or do we have to ask finance?&lt;br /&gt;
* Rob already looked at Urban Ore ...&lt;br /&gt;
* Daniel wants to buy more ethernet cable for the run from Rise Above to Sudoroom routers. Would make everyone&amp;#039;s internet faster. Would also help create stage lighting for the ballroom.&lt;br /&gt;
&lt;br /&gt;
== regular saturday workday? ==&lt;br /&gt;
* yar: how about we do this every week?&lt;br /&gt;
* we really need to have organizers come BEFORE volunteers&lt;br /&gt;
&lt;br /&gt;
= LA LISTA =&lt;br /&gt;
&lt;br /&gt;
== Ballroom Area ==&lt;br /&gt;
&lt;br /&gt;
=== A/V Room ===&lt;br /&gt;
* &amp;lt;s&amp;gt;Electrical subpanel: Either replace broken breaker switches with with working ones, or install factory blanks.&amp;lt;/s&amp;gt; &amp;lt;-- MATT ALREADY DID THIS&lt;br /&gt;
* Patch small hole above door where conduit is peeking through.&lt;br /&gt;
* Patch hole near floor in NW corner of this room near door jamb. &amp;lt;--In progress by kkr&lt;br /&gt;
&lt;br /&gt;
=== Bar ===&lt;br /&gt;
* soffet-mounted ceiling light fixtures need: lightbulbs tested / replaced if necc&lt;br /&gt;
* Put up ABC signage req. for pub or private parties w/ alcohol re: cancer/pregnancy warning&lt;br /&gt;
* Determine fix for leaking sink in 3-sink (weld?) - southmost sink (on left if you are behind bar)&lt;br /&gt;
* Install floor sink under 3-sink as per health code&lt;br /&gt;
* Outlets on east/shattuck-side wall need to be: removed, wire-nutted, wrapped in elec tape, covered with blank faceplates. TURN OFF CIRCUIT FIRST. Note: furthest N outlet not disconnected, only outlet in the center of the wall&lt;br /&gt;
&lt;br /&gt;
=== Ballroom-Shattuck Exit Area ===&lt;br /&gt;
* install closers to both inner doors. &lt;br /&gt;
* install panic bars to both inner doors.&lt;br /&gt;
* install panic bars to both outer doors.&lt;br /&gt;
* install light cover into flourescent panel (22&amp;quot;x3&amp;#039;) - flourescents are 2x 2&amp;#039; bulbs&lt;br /&gt;
&lt;br /&gt;
=== Stage ===&lt;br /&gt;
* Create wider storage openings under stage. Not insubstantial. See stage storage build plan.&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine ===&lt;br /&gt;
* SE staircase: Install new led strip lighting on ea. side of stair to replace dead lighting strips&lt;br /&gt;
* SW staircase down: motion detector installed onto light fixture.&lt;br /&gt;
* SW staircase up: Install new led strip lighting on ea. side of stair to replace dead lighting strips&lt;br /&gt;
* SW staircase up: Repair hole in south wall near floor immediately across from stairs (see south wall acoustic treatment)&lt;br /&gt;
* SW staircase up: Determination if 3-way switch needs to be installed at top of stair. Currently there is only a switch at bottom landing.&lt;br /&gt;
* SW staircase up: motion detector installed onto light fixture.&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine Bathroom ===&lt;br /&gt;
* outlet needs to be replaced with GFCI - Note: no ground; Gerald suggests decommissioning and installing new grounded plug in wall just above counter; go into wall from other side, need to locate grounded location&lt;br /&gt;
* active ventilation needs to be wired &amp;amp; installed (exhaust) in current ventilation window&lt;br /&gt;
* all exposed bulb fixtures need be replaced with covered fixtures (2x)&lt;br /&gt;
* install door stop so the door can be propped open sometimes.&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine &amp;quot;Book Room&amp;quot; ===&lt;br /&gt;
* 4&amp;quot;x4&amp;quot; Outlets affixed to top of Electrical subpanel must be removed from subpanel, and affixed to balcony (code violation) (3x)&lt;br /&gt;
* Electrical subpanel needs be moved to plywood wall south of panel, onto drywall, 2&amp;#039; from ground.&lt;br /&gt;
* 3-way switch wiring (for chandelier) inside subpanel needs to be removed and placed elsewhere as not ok in-panel.&lt;br /&gt;
* Install closer to Mezzanine room door&lt;br /&gt;
&lt;br /&gt;
=== Crow&amp;#039;s Nest ===&lt;br /&gt;
* Clear everything 3&amp;#039; in front of electrical subpanel including all cords, lighitng, etc&lt;br /&gt;
* acquire &amp;amp; install cover for light (fixture takes glass orb / cover around bulb, it is missing)&lt;br /&gt;
* Make main (east) door to this room better fitting / gasketed against all air gaps so it functions for soundproofing&lt;br /&gt;
* rebalance fan&lt;br /&gt;
* extend balcony railing to out in front of balcony hatch - on E side of R&amp;amp;J balcony (building &amp;amp; osha safety)&lt;br /&gt;
* Refinish &amp;amp; airgap-seal east wall above loft in this room so room functions as soundproofing / air barrier to exterior of bldg&lt;br /&gt;
* Install real doorknob, remove latch&lt;br /&gt;
* make north door to romeo &amp;amp; juliet balcony airtight (or better fitting) for turning this room into a soundproofing barrier&lt;br /&gt;
* Install closer to main (east) door&lt;br /&gt;
* Install closer to north / balcony door&lt;br /&gt;
* ensure balcony hatch is robust enough to support 300lb standing weight&lt;br /&gt;
&lt;br /&gt;
=== Ticketbooth Room ===&lt;br /&gt;
* Remove giant bookshelf and all debris/material from this room. Call Emerson - ask them to get their table back, or are they donating to us ? :)&lt;br /&gt;
* &amp;lt;s&amp;gt;Make metal grille outside window openable, so the casement window can open.&amp;lt;/s&amp;gt; &amp;lt;== Increases security risk and not a safety requirement&lt;br /&gt;
* Install threshold plate to base of jamb (no more than 1/2&amp;quot; high as per ADA) to cut down on sound from ballroom &lt;br /&gt;
* Install closer to Ticketbooth room door (pref. good kind with long close time for wheelchair)&lt;br /&gt;
* Patch small hole in ceiling corner above ticket window where new conduit was run. &lt;br /&gt;
* install gaskets to door jambs to cut down on sound. (icarus)&lt;br /&gt;
&lt;br /&gt;
== Disco Room ==&lt;br /&gt;
* 4th window from main door as a broken pane&lt;br /&gt;
* 5th window from main door the window frame rub against the wall on E side&lt;br /&gt;
* light switch cover near 48th street door should be replaced wint one with less-sharp edges (better-sized)&lt;br /&gt;
* weight load for high triangular shelves in corners to be assessed (julia) to determine if speakers etc cabe placed there&lt;br /&gt;
&lt;br /&gt;
== La Commune == &lt;br /&gt;
* install closer to basement stairs door&lt;br /&gt;
* cover floor sink behind front counter area w minimum 3/4&amp;quot; plywood cut out and sealant (trip hazard/health)&lt;br /&gt;
* fix broken glass pane in 4th window west of front door in La Commune&lt;br /&gt;
* replace all low uncover lights near entrance w cover lights x3&lt;br /&gt;
* take out and cap OR at least cover w small platform the copper water lines along floor behind the front counter&lt;br /&gt;
* locked storage - unplug and store all extension cords&lt;br /&gt;
 &lt;br /&gt;
== Rise Above ==&lt;br /&gt;
* replace locking main door to Rise Above in hallway with twenty minute solid-core (fire-code)&lt;br /&gt;
* replace 2x hollow-core sliding doors with 20 minutes solid-core sliding doors (fire-code)&lt;br /&gt;
* replaced busted circuit breaker in every electrial panel (like in the 42 breaker panel) with either working breaker or factory blanks.&lt;br /&gt;
* put closer on main door to Rise Above&lt;br /&gt;
* remove 2x6 on ceiling on south side of room (COORDINATE WITH GABRIELA 1ST - move or cover all her stuff.&lt;br /&gt;
* stage left - install paper towel dispenser and paper towels.&lt;br /&gt;
&lt;br /&gt;
==  Sudo ==&lt;br /&gt;
* created dedicated space for storing excess lumber (long pieces), pipe, metal pieces, etc so they are not in jumbles (fire code).&lt;br /&gt;
* Stairwell - sand down sie of door so it does not stick closed so bad (belt sander optimal).&lt;br /&gt;
* west wall - run more 3/4&amp;quot; conduit further down west wall. Must know code.&lt;br /&gt;
&lt;br /&gt;
== Sudo/CCL ==&lt;br /&gt;
* along perimeter / walls do better job of affixing &amp;amp; routing low-voltage &amp;#039;inside wiring&amp;#039; ie all ethernet, phone cabling&lt;br /&gt;
* ballroom door - put closer on this door&lt;br /&gt;
* basement door - if possible, put closer on this door (may not be possible)&lt;br /&gt;
* entire room perimeter - 5LB ABC fire extinguishers at correct height every ~75&amp;#039; - starting w under each exit sign&lt;br /&gt;
* hallway door - install panic hardware &amp;amp; lock to this door&lt;br /&gt;
* hallway door - install closer to door&lt;br /&gt;
* ticket booth room - install new outlet (existing is cracked and not attached to wall)&lt;br /&gt;
&lt;br /&gt;
== TIL (TI) ==&lt;br /&gt;
* cover exposed wires in east wall (near bookshelf). can use a plate&lt;br /&gt;
* get clear cover to put over wall switch for old electric timer in wall in big bookshelf unit in south wall of TL&lt;br /&gt;
&lt;br /&gt;
.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Basement ==&lt;br /&gt;
&lt;br /&gt;
* south wall: close holes in basement wall where opened to remove mold.&lt;br /&gt;
* identify stuff in bunker rooms &amp;amp; hallway: what is Phat Beets, Black Holes, what is junk/unclaimed?&lt;br /&gt;
* west wall: re-connect or newly connect toggle switch to basement ventilation fan in basement. Currently breakers turn it on.&lt;br /&gt;
* Phat Beets room ventilation doesn&amp;#039;t work. people can suffocate in there.&lt;br /&gt;
&lt;br /&gt;
=== ceiling ===&lt;br /&gt;
* Acquire &amp;amp; install light fixture covers for the 4&amp;#039; flourescent fixtures in basement offices (bunker rooms) - roughly ~48&amp;quot;x16&amp;quot;. &lt;br /&gt;
* install protective bulb covers over remaining working 8&amp;#039; flourescents: 6x&lt;br /&gt;
* unscrew piece of broken lightbulb from East basement hallway, replace bare-bulb fixture with covered fixture&lt;br /&gt;
* re-attach and restore service to entire strip of 8&amp;#039; flourescents along west wall (closest to sudo) that had been decommissioned&lt;br /&gt;
* acquire and affix 1&amp;#039;x1&amp;#039; ceiling tiles in NW corner of basement, so lighting fixture &amp;amp; strip of lights can be re-connected. ~120 tiles&lt;br /&gt;
* Cut &amp;amp; attach drywall AND then also affix 1&amp;#039;x1&amp;#039; ceiling tiles to exposed ceiling areas in basement (2 areas)&lt;br /&gt;
* Replace bad ballast in any 8&amp;#039; flourescent fixture (that is not turning on. If not sure try lights in it that do work in another fixture.&lt;br /&gt;
&lt;br /&gt;
=== kitchen ===&lt;br /&gt;
* Purchase and affix Class-K extinguisher at correct height&lt;br /&gt;
* Cover exposed wiring in FNB locked-pantry ceiling (with e.g. metal plate)&lt;br /&gt;
* Install Ansul fire-suppression in hood&lt;br /&gt;
* Replace entire 4&amp;#039; flourescent light fixture closest to stove (has 1x broken tube holder)&lt;br /&gt;
* Resurface kitchen floor, cover with quarry tile&lt;br /&gt;
* Knock out / expand west kitchen wall to next-west supporting pipe&lt;br /&gt;
* Fix or replace corroded window frames along shattuck&lt;br /&gt;
* Cut in mop sink in westmost pantry area&lt;br /&gt;
* Acquire and install tankless water heater, check gas line diameter &amp;amp; exhaust ductwork &lt;br /&gt;
* Acquire makeup air into kitchen (remove desk fan from duct, replace with something to code - 95% of hood CFM)&lt;br /&gt;
* Put closers on both basement kitchen doors&lt;br /&gt;
* Remove firred-out drywall, cover with FRP&lt;br /&gt;
* steam clean stove hood&lt;br /&gt;
&lt;br /&gt;
== Milestones ==&lt;br /&gt;
&lt;br /&gt;
* yar: what&amp;#039;s our next milestone? passing fire inspection for just the ballroom or the whole building?&lt;br /&gt;
* matt: ballroom&amp;#039;s most complicated because it&amp;#039;s classified as &amp;quot;assembly&amp;quot;. but inspector coming to ballroom won&amp;#039;t ignore rest of the building&lt;br /&gt;
* basement is connected to ballroom because they share the floor&lt;/div&gt;</summary>
		<author><name>Kkr</name></author>
	</entry>
	<entry>
		<id>https://omnicommons.org/mediawiki/index.php?title=Event:2015/08/10_Building_Working_Group&amp;diff=3873</id>
		<title>Event:2015/08/10 Building Working Group</title>
		<link rel="alternate" type="text/html" href="https://omnicommons.org/mediawiki/index.php?title=Event:2015/08/10_Building_Working_Group&amp;diff=3873"/>
		<updated>2015-08-13T00:05:55Z</updated>

		<summary type="html">&lt;p&gt;Kkr: /* A/V Room */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Building WG August 10&lt;br /&gt;
&lt;br /&gt;
last week: https://omnicommons.org/wiki/Event:2015/08/03_Building_Working_Group&lt;br /&gt;
&lt;br /&gt;
== who&amp;#039;s here? ==&lt;br /&gt;
* rob, daniel, mary, matt, yar, joe, kerrie, laura late&lt;br /&gt;
&lt;br /&gt;
== south wall ==&lt;br /&gt;
* saturday work party was great! whitney said no safety issues, ready for inspection. just need to recap some wires because they weren&amp;#039;t twisted first, and connect some wires to their breakers.&lt;br /&gt;
* conduit against the wall needs a &amp;quot;dog-ear bend&amp;quot; to be against the wall, not just sitting straight - but this is ok for inspection right now&lt;br /&gt;
* matt says these will take &amp;quot;almost no time&amp;quot;&lt;br /&gt;
* rob says we need more tyvek&lt;br /&gt;
* joe will schedule the inspection&lt;br /&gt;
* still didn&amp;#039;t finish the exit sign because it has to go on the drywall. last inspection will cover that.&lt;br /&gt;
&lt;br /&gt;
== doors ==&lt;br /&gt;
* still waiting on jessie to make plumb lines&lt;br /&gt;
* matt: we have an actual plumb bob in the closet&lt;br /&gt;
&lt;br /&gt;
== money ==&lt;br /&gt;
* Rob wants money for a can of black paint&lt;br /&gt;
* Also for &amp;quot;shoulder nut eyes&amp;quot; to mount our projector in the ballroom. Probably $40 for 5 total including shipping online.&lt;br /&gt;
* Does anyone know if we have this in budget or do we have to ask finance?&lt;br /&gt;
* Rob already looked at Urban Ore ...&lt;br /&gt;
* Daniel wants to buy more ethernet cable for the run from Rise Above to Sudoroom routers. Would make everyone&amp;#039;s internet faster. Would also help create stage lighting for the ballroom.&lt;br /&gt;
&lt;br /&gt;
== regular saturday workday? ==&lt;br /&gt;
* yar: how about we do this every week?&lt;br /&gt;
* we really need to have organizers come BEFORE volunteers&lt;br /&gt;
&lt;br /&gt;
= LA LISTA =&lt;br /&gt;
&lt;br /&gt;
== Ballroom Area ==&lt;br /&gt;
&lt;br /&gt;
=== A/V Room ===&lt;br /&gt;
* &amp;lt;s&amp;gt;Electrical subpanel: Either replace broken breaker switches with with working ones, or install factory blanks.&amp;lt;/s&amp;gt; &amp;lt;-- MATT ALREADY DID THIS&lt;br /&gt;
* Patch small hole above door where conduit is peeking through.&lt;br /&gt;
* Patch hole near floor in NW corner of this room near door jamb. &amp;lt;--In progress by kkr&lt;br /&gt;
&lt;br /&gt;
=== Bar ===&lt;br /&gt;
* soffet-mounted ceiling light fixtures need: lightbulbs tested / replaced if necc&lt;br /&gt;
* Put up ABC signage req. for pub or private parties w/ alcohol re: cancer/pregnancy warning&lt;br /&gt;
* Determine fix for leaking sink in 3-sink (weld?) - southmost sink (on left if you are behind bar)&lt;br /&gt;
* Install floor sink under 3-sink as per health code&lt;br /&gt;
* Outlets on east/shattuck-side wall need to be: removed, wire-nutted, wrapped in elec tape, covered with blank faceplates. TURN OFF CIRCUIT FIRST. Note: furthest N outlet not disconnected, only outlet in the center of the wall&lt;br /&gt;
&lt;br /&gt;
=== Ballroom-Shattuck Exit Area ===&lt;br /&gt;
* install closers to both inner doors. &lt;br /&gt;
* install panic bars to both inner doors.&lt;br /&gt;
* install panic bars to both outer doors.&lt;br /&gt;
* install light cover into flourescent panel (22&amp;quot;x3&amp;#039;) - flourescents are 2x 2&amp;#039; bulbs&lt;br /&gt;
&lt;br /&gt;
=== Stage ===&lt;br /&gt;
* Create wider storage openings under stage. Not insubstantial. See stage storage build plan.&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine ===&lt;br /&gt;
* SE staircase: Install new led strip lighting on ea. side of stair to replace dead lighting strips&lt;br /&gt;
* SW staircase down: motion detector installed onto light fixture.&lt;br /&gt;
* SW staircase up: Install new led strip lighting on ea. side of stair to replace dead lighting strips&lt;br /&gt;
* SW staircase up: Repair hole in south wall near floor immediately across from stairs (see south wall acoustic treatment)&lt;br /&gt;
* SW staircase up: Determination if 3-way switch needs to be installed at top of stair. Currently there is only a switch at bottom landing.&lt;br /&gt;
* SW staircase up: motion detector installed onto light fixture.&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine Bathroom ===&lt;br /&gt;
* outlet needs to be replaced with GFCI - Note: no ground; Gerald suggests decommissioning and installing new grounded plug in wall just above counter; go into wall from other side, need to locate grounded location&lt;br /&gt;
* active ventilation needs to be wired &amp;amp; installed (exhaust) in current ventilation window&lt;br /&gt;
* all exposed bulb fixtures need be replaced with covered fixtures (2x)&lt;br /&gt;
* install door stop so the door can be propped open sometimes.&lt;br /&gt;
&lt;br /&gt;
=== Mezzanine &amp;quot;Book Room&amp;quot; ===&lt;br /&gt;
* 4&amp;quot;x4&amp;quot; Outlets affixed to top of Electrical subpanel must be removed from subpanel, and affixed to balcony (code violation) (3x)&lt;br /&gt;
* Electrical subpanel needs be moved to plywood wall south of panel, onto drywall, 2&amp;#039; from ground.&lt;br /&gt;
* 3-way switch wiring (for chandelier) inside subpanel needs to be removed and placed elsewhere as not ok in-panel.&lt;br /&gt;
* Install closer to Mezzanine room door&lt;br /&gt;
&lt;br /&gt;
=== Crow&amp;#039;s Nest ===&lt;br /&gt;
* Clear everything 3&amp;#039; in front of electrical subpanel including all cords, lighitng, etc&lt;br /&gt;
* acquire &amp;amp; install cover for light (fixture takes glass orb / cover around bulb, it is missing)&lt;br /&gt;
* Make main (east) door to this room better fitting / gasketed against all air gaps so it functions for soundproofing&lt;br /&gt;
* rebalance fan&lt;br /&gt;
* extend balcony railing to out in front of balcony hatch - on E side of R&amp;amp;J balcony (building &amp;amp; osha safety)&lt;br /&gt;
* Refinish &amp;amp; airgap-seal east wall above loft in this room so room functions as soundproofing / air barrier to exterior of bldg&lt;br /&gt;
* Install real doorknob, remove latch&lt;br /&gt;
* make north door to romeo &amp;amp; juliet balcony airtight (or better fitting) for turning this room into a soundproofing barrier&lt;br /&gt;
* Install closer to main (east) door&lt;br /&gt;
* Install closer to north / balcony door&lt;br /&gt;
* ensure balcony hatch is robust enough to support 300lb standing weight&lt;br /&gt;
&lt;br /&gt;
=== Ticketbooth Room ===&lt;br /&gt;
* Remove giant bookshelf and all debris/material from this room. Call Emerson - ask them to get their table back, or are they donating to us ? :)&lt;br /&gt;
* Make metal grille outside window openable, so the casement window can open. &lt;br /&gt;
* Install threshold plate to base of jamb (no more than 1/2&amp;quot; high as per ADA) to cut down on sound from ballroom&lt;br /&gt;
* Install closer to Ticketbooth room door (pref. good kind with long close time for wheelchair)&lt;br /&gt;
* Patch small hole in ceiling corner above ticket window where new conduit was run. &lt;br /&gt;
* install gaskets to door jambs to cut down on sound. (icarus)&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Disco Room ==&lt;br /&gt;
* 4th window from main door as a broken pane&lt;br /&gt;
* 5th window from main door the window frame rub against the wall on E side&lt;br /&gt;
* light switch cover near 48th street door should be replaced wint one with less-sharp edges (better-sized)&lt;br /&gt;
* weight load for high triangular shelves in corners to be assessed (julia) to determine if speakers etc cabe placed there&lt;br /&gt;
&lt;br /&gt;
== La Commune == &lt;br /&gt;
* install closer to basement stairs door&lt;br /&gt;
* cover floor sink behind front counter area w minimum 3/4&amp;quot; plywood cut out and sealant (trip hazard/health)&lt;br /&gt;
* fix broken glass pane in 4th window west of front door in La Commune&lt;br /&gt;
* replace all low uncover lights near entrance w cover lights x3&lt;br /&gt;
* take out and cap OR at least cover w small platform the copper water lines along floor behind the front counter&lt;br /&gt;
* locked storage - unplug and store all extension cords&lt;br /&gt;
 &lt;br /&gt;
== Rise Above ==&lt;br /&gt;
* replace locking main door to Rise Above in hallway with twenty minute solid-core (fire-code)&lt;br /&gt;
* replace 2x hollow-core sliding doors with 20 minutes solid-core sliding doors (fire-code)&lt;br /&gt;
* replaced busted circuit breaker in every electrial panel (like in the 42 breaker panel) with either working breaker or factory blanks.&lt;br /&gt;
* put closer on main door to Rise Above&lt;br /&gt;
* remove 2x6 on ceiling on south side of room (COORDINATE WITH GABRIELA 1ST - move or cover all her stuff.&lt;br /&gt;
* stage left - install paper towel dispenser and paper towels.&lt;br /&gt;
&lt;br /&gt;
==  Sudo ==&lt;br /&gt;
* created dedicated space for storing excess lumber (long pieces), pipe, metal pieces, etc so they are not in jumbles (fire code).&lt;br /&gt;
* Stairwell - sand down sie of door so it does not stick closed so bad (belt sander optimal).&lt;br /&gt;
* west wall - run more 3/4&amp;quot; conduit further down west wall. Must know code.&lt;br /&gt;
&lt;br /&gt;
== Sudo/CCL ==&lt;br /&gt;
* along perimeter / walls do better job of affixing &amp;amp; routing low-voltage &amp;#039;inside wiring&amp;#039; ie all ethernet, phone cabling&lt;br /&gt;
* ballroom door - put closer on this door&lt;br /&gt;
* basement door - if possible, put closer on this door (may not be possible)&lt;br /&gt;
* entire room perimeter - 5LB ABC fire extinguishers at correct height every ~75&amp;#039; - starting w under each exit sign&lt;br /&gt;
* hallway door - install panic hardware &amp;amp; lock to this door&lt;br /&gt;
* hallway door - install closer to door&lt;br /&gt;
* ticket booth room - install new outlet (existing is cracked and not attached to wall)&lt;br /&gt;
&lt;br /&gt;
== TIL (TI) ==&lt;br /&gt;
* cover exposed wires in east wall (near bookshelf). can use a plate&lt;br /&gt;
* get clear cover to put over wall switch for old electric timer in wall in big bookshelf unit in south wall of TL&lt;br /&gt;
&lt;br /&gt;
.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
== Basement ==&lt;br /&gt;
&lt;br /&gt;
* south wall: close holes in basement wall where opened to remove mold.&lt;br /&gt;
* identify stuff in bunker rooms &amp;amp; hallway: what is Phat Beets, Black Holes, what is junk/unclaimed?&lt;br /&gt;
* west wall: re-connect or newly connect toggle switch to basement ventilation fan in basement. Currently breakers turn it on.&lt;br /&gt;
* Phat Beets room ventilation doesn&amp;#039;t work. people can suffocate in there.&lt;br /&gt;
&lt;br /&gt;
=== ceiling ===&lt;br /&gt;
* Acquire &amp;amp; install light fixture covers for the 4&amp;#039; flourescent fixtures in basement offices (bunker rooms) - roughly ~48&amp;quot;x16&amp;quot;. &lt;br /&gt;
* install protective bulb covers over remaining working 8&amp;#039; flourescents: 6x&lt;br /&gt;
* unscrew piece of broken lightbulb from East basement hallway, replace bare-bulb fixture with covered fixture&lt;br /&gt;
* re-attach and restore service to entire strip of 8&amp;#039; flourescents along west wall (closest to sudo) that had been decommissioned&lt;br /&gt;
* acquire and affix 1&amp;#039;x1&amp;#039; ceiling tiles in NW corner of basement, so lighting fixture &amp;amp; strip of lights can be re-connected. ~120 tiles&lt;br /&gt;
* Cut &amp;amp; attach drywall AND then also affix 1&amp;#039;x1&amp;#039; ceiling tiles to exposed ceiling areas in basement (2 areas)&lt;br /&gt;
* Replace bad ballast in any 8&amp;#039; flourescent fixture (that is not turning on. If not sure try lights in it that do work in another fixture.&lt;br /&gt;
&lt;br /&gt;
=== kitchen ===&lt;br /&gt;
* Purchase and affix Class-K extinguisher at correct height&lt;br /&gt;
* Cover exposed wiring in FNB locked-pantry ceiling (with e.g. metal plate)&lt;br /&gt;
* Install Ansul fire-suppression in hood&lt;br /&gt;
* Replace entire 4&amp;#039; flourescent light fixture closest to stove (has 1x broken tube holder)&lt;br /&gt;
* Resurface kitchen floor, cover with quarry tile&lt;br /&gt;
* Knock out / expand west kitchen wall to next-west supporting pipe&lt;br /&gt;
* Fix or replace corroded window frames along shattuck&lt;br /&gt;
* Cut in mop sink in westmost pantry area&lt;br /&gt;
* Acquire and install tankless water heater, check gas line diameter &amp;amp; exhaust ductwork &lt;br /&gt;
* Acquire makeup air into kitchen (remove desk fan from duct, replace with something to code - 95% of hood CFM)&lt;br /&gt;
* Put closers on both basement kitchen doors&lt;br /&gt;
* Remove firred-out drywall, cover with FRP&lt;br /&gt;
* steam clean stove hood&lt;br /&gt;
&lt;br /&gt;
== Milestones ==&lt;br /&gt;
&lt;br /&gt;
* yar: what&amp;#039;s our next milestone? passing fire inspection for just the ballroom or the whole building?&lt;br /&gt;
* matt: ballroom&amp;#039;s most complicated because it&amp;#039;s classified as &amp;quot;assembly&amp;quot;. but inspector coming to ballroom won&amp;#039;t ignore rest of the building&lt;br /&gt;
* basement is connected to ballroom because they share the floor&lt;/div&gt;</summary>
		<author><name>Kkr</name></author>
	</entry>
</feed>