<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://omnicommons.org/mediawiki/index.php?action=history&amp;feed=atom&amp;title=Event%3A2015%2F03%2F30_Building_Working_Group_Meeting</id>
	<title>Event:2015/03/30 Building Working Group Meeting - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://omnicommons.org/mediawiki/index.php?action=history&amp;feed=atom&amp;title=Event%3A2015%2F03%2F30_Building_Working_Group_Meeting"/>
	<link rel="alternate" type="text/html" href="https://omnicommons.org/mediawiki/index.php?title=Event:2015/03/30_Building_Working_Group_Meeting&amp;action=history"/>
	<updated>2026-04-24T10:38:53Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.37.2</generator>
	<entry>
		<id>https://omnicommons.org/mediawiki/index.php?title=Event:2015/03/30_Building_Working_Group_Meeting&amp;diff=3445&amp;oldid=prev</id>
		<title>Tunabananas: added building wg mtg notes</title>
		<link rel="alternate" type="text/html" href="https://omnicommons.org/mediawiki/index.php?title=Event:2015/03/30_Building_Working_Group_Meeting&amp;diff=3445&amp;oldid=prev"/>
		<updated>2015-03-31T22:31:33Z</updated>

		<summary type="html">&lt;p&gt;added building wg mtg notes&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;Meeting Minutes 3/30/2015&lt;br /&gt;
==Agenda==&lt;br /&gt;
===Top Priority / Blocking Job===&lt;br /&gt;
* Soundproofing Ballroom south wall&lt;br /&gt;
** May 3rd - May 7th&lt;br /&gt;
** we should fill out budget for it - https://docs.google.com/spreadsheets/d/1iaI3DH3_nTEMl_N9yHDaysm7QnORJviCxCCQNZPs-pg/edit#gid=0 &lt;br /&gt;
*** blower rental, insulation, drywall (for patches?) mud &amp;amp; tape &amp;amp; primer &amp;amp; paint&lt;br /&gt;
*** Work-party friendly. &lt;br /&gt;
=== Types of Improvement Projects ===&lt;br /&gt;
* Two kinds of improvement projects:&lt;br /&gt;
** Type A: Ones that require dedicated reservation of space being worked on/in &lt;br /&gt;
** Type B: Ones that are essentially non-blocking to other events, as long as other events are informed in advance&lt;br /&gt;
Type A:&lt;br /&gt;
- Soundproofing ballroom wall (south)&lt;br /&gt;
Type B:&lt;br /&gt;
- Panic bars, emergency exit signs &amp;amp; emergency lighting &lt;br /&gt;
- Access control &lt;br /&gt;
- hole patching&lt;br /&gt;
=== Tasks ===&lt;br /&gt;
# Soundproof Ballroom south wall (see above)&lt;br /&gt;
# Front door&lt;br /&gt;
#* Pull permit&lt;br /&gt;
#* Look for bid lower than $5,000&lt;br /&gt;
#* Expect nice mosaic above door to be installed.&lt;br /&gt;
#* Plan for the door to potentially have kickers or pneumatic door-openers installed at a later date.&lt;br /&gt;
# Doors / Lock System&lt;br /&gt;
#* Panic Bars&lt;br /&gt;
#* Electric Strikes&lt;br /&gt;
#* Whatever devices needed for automatic locking system&lt;br /&gt;
#* Non-blocking, the auto-door systems can be installed any time as long as the panic bars and electric strikes are compatible and installed.&lt;br /&gt;
#* Needs:&lt;br /&gt;
#** Need from David Keenan a final list of doors to be upgraded or replaced, including which direction they should open, proper widths/measurements, proper material specification, whether it should have a panic bar, and whether it should have an electric strike installed (which is likely if it needs a panic bar).&lt;br /&gt;
#** Need to get from Marc Juul a set of recommended and compatible panic bars and electric strikes.&lt;br /&gt;
#* We will do all other doors than front as in-house work.&lt;br /&gt;
# Self-closing doors. &lt;br /&gt;
#* All main doors need these. &lt;br /&gt;
#* Self-install&lt;br /&gt;
# La Commune walls need to be fully covered.&lt;br /&gt;
# Cover all lights (so bulbs cannot be broken accidentally)&lt;br /&gt;
# Make sure all light switches, outlets have covers&lt;br /&gt;
# Patch all small holes in walls / ceilings / floors&lt;br /&gt;
# Basement kitchen&lt;br /&gt;
#* Fire suppression system for basement&lt;br /&gt;
#* Makeup air system replaced with real fan&lt;br /&gt;
#* Other upgrades, not completely necessary for fire code:&lt;br /&gt;
#** Floor needs to be resurfaced&lt;br /&gt;
#*** Concrete grinder, stoves removed, either quarry tile or use resin on it.&lt;br /&gt;
#*** Probably going to use natural stone (quarry tile)&lt;br /&gt;
#** Need to move the wall to ensure the floor drain is inside the kitchen.&lt;br /&gt;
#*** Need plans drawn up and signed by architect&lt;br /&gt;
#** Dumbwaiter to ballroom&lt;br /&gt;
#** Mop sink&lt;br /&gt;
# Fire Extinguishers wherever there&amp;#039;s an exit sign see https://omnicommons.org/wiki/Construction_Projects#Fire_extinguishers_and_exit_signs&lt;br /&gt;
# integrated fire alarm with wireless smoke &amp;amp; CO detectors &lt;br /&gt;
# Finish electrical in Ballroom&lt;br /&gt;
# Finish exit signs w/ integrated emergency lighting&lt;br /&gt;
# Emergency lighting in bathrooms&lt;br /&gt;
#* Need to research with DK&lt;br /&gt;
# Lots of official signage&lt;br /&gt;
#* Official &amp;quot;This is Not an Exit&amp;quot; signs&lt;br /&gt;
#* Official &amp;quot;This Door to Remain Unlocked&amp;quot; signs&lt;br /&gt;
#* Official ADA brail signs for each floor&lt;br /&gt;
#* Evacuation plans to be posted in specific places throughout building&lt;br /&gt;
#** May also need brail to be ADA compliant&lt;br /&gt;
#* Bathrooms still need more signage&lt;br /&gt;
#* La Commune probably needs &amp;quot;wash your hand&amp;quot; and &amp;quot;worker rights&amp;quot; signs&lt;br /&gt;
# Need to turn off all power to building to audit electrical, this Friday April 3&lt;br /&gt;
# Get John to buy glass for ballroom roof&lt;br /&gt;
# Put fire ceiling tiles up in basement&lt;br /&gt;
# Remove carpet in basement rooms&lt;br /&gt;
# Ditch all shitty couches -- out of the building!&lt;br /&gt;
# Check for basement staircase lighting, exit signs, etc&lt;br /&gt;
# Lighting for stairs down from disco room&lt;br /&gt;
# Everything looks like it&amp;#039;s in its place -- no junk.&lt;br /&gt;
#* Organize everything.&lt;br /&gt;
#* Under-stage storage.&lt;br /&gt;
# Get HVAC intake to reverse to become exhaust&lt;br /&gt;
# Ballroom mezanine window needs a safety bar.&lt;br /&gt;
# La Commune, Tony is supposed to finish selectively removing the ceiling t-bars and tiles. &lt;br /&gt;
# La Commune plumbing contingent on mop sink&lt;br /&gt;
# Mop sink needs to be installed in the ADA bathroom either where the Urinals currently are or where the current sink is. &lt;br /&gt;
#* Need to find a good plumber for this&lt;br /&gt;
#* Can also possibly fit Gabriella&amp;#039;s utility sink&lt;br /&gt;
# Finish ADA bathroom&lt;br /&gt;
#* Only do this after there are no more holes in wall in La Commune&lt;br /&gt;
#* Seal concrete&lt;br /&gt;
#* Re-set toilet&lt;br /&gt;
# Remove ceiling tiles and wiring in mezzanine&lt;br /&gt;
=== Tabled Tasks === &lt;br /&gt;
Reference: https://omnicommons.org/wiki/Omni-readiness&lt;br /&gt;
== Action Items ==&lt;br /&gt;
* Block out construction time on calendar (May 2-14?) - Jenny&lt;br /&gt;
* Notify Icarus on cancellation of meeting during this time (necessary?)&lt;br /&gt;
* Fill out budget request for doors - Jenny/Juul/DK&lt;/div&gt;</summary>
		<author><name>Tunabananas</name></author>
	</entry>
</feed>