<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://omnicommons.org/mediawiki/index.php?action=history&amp;feed=atom&amp;title=Event%3A2015%2F05%2F25_Building_Working_Group</id>
	<title>Event:2015/05/25 Building Working Group - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://omnicommons.org/mediawiki/index.php?action=history&amp;feed=atom&amp;title=Event%3A2015%2F05%2F25_Building_Working_Group"/>
	<link rel="alternate" type="text/html" href="https://omnicommons.org/mediawiki/index.php?title=Event:2015/05/25_Building_Working_Group&amp;action=history"/>
	<updated>2026-04-28T23:15:50Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.37.2</generator>
	<entry>
		<id>https://omnicommons.org/mediawiki/index.php?title=Event:2015/05/25_Building_Working_Group&amp;diff=3676&amp;oldid=prev</id>
		<title>Yar: copy from pad</title>
		<link rel="alternate" type="text/html" href="https://omnicommons.org/mediawiki/index.php?title=Event:2015/05/25_Building_Working_Group&amp;diff=3676&amp;oldid=prev"/>
		<updated>2015-05-26T04:24:28Z</updated>

		<summary type="html">&lt;p&gt;copy from pad&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;Building Working Group Meeting - Monday May 25, 2015&lt;br /&gt;
&lt;br /&gt;
intros&lt;br /&gt;
* Joe: I hope this doesn&amp;#039;t take too long. Famous last words&lt;br /&gt;
* yar: that&amp;#039;s what we said when we signed the lease&lt;br /&gt;
* laura: no energy to facilitate&lt;br /&gt;
* anka&lt;br /&gt;
* rob&lt;br /&gt;
* max&lt;br /&gt;
* sean&lt;br /&gt;
* remote-jenny&lt;br /&gt;
&lt;br /&gt;
==Report backs==&lt;br /&gt;
... on Todos and progress for the past week&lt;br /&gt;
&lt;br /&gt;
Joe:&lt;br /&gt;
* Tape Disco Room window &amp;amp; work on S Wall&lt;br /&gt;
** didn&amp;#039;t tape the disco window because we started the south wall. we have to find some mud. just a 2 hour job though.&lt;br /&gt;
** not worrying about the other side&lt;br /&gt;
* emails from dk&lt;br /&gt;
** just read 4 lengthy detailed emails from dk&lt;br /&gt;
** must find perfect kind of insulation, how to secure, etc...&lt;br /&gt;
** wants to put resilient channel on the south wall but we already put the rock up&lt;br /&gt;
** a bit overwhelmed by revisionism. but love all around.&lt;br /&gt;
** rob thinks maybe it&amp;#039;s a good idea to take the rock down again, but others emphatically don&amp;#039;t think so&lt;br /&gt;
** rob suggests sealing the siding? sean says no, it&amp;#039;s supposed to breathe to avoid rotting, that&amp;#039;s the point&lt;br /&gt;
* Ensure plan is submitted to city&lt;br /&gt;
** pulling stuff as an owner-builder. plans are complete, John just need to sign a letter.&lt;br /&gt;
** next step: make appointment for framing inspection&lt;br /&gt;
** we need a good caulker who doesn&amp;#039;t mind squeezing stuff all day long&lt;br /&gt;
** also need insulation&lt;br /&gt;
** we can start building the walls while we decide on the insulation&lt;br /&gt;
** big event thursday but we can build tue &amp;amp; wed&lt;br /&gt;
** need to buy lumber &amp;amp; big 29oz caulk tubes. joe will fill out a finance form for lumber.&lt;br /&gt;
** we have a list of everyone willing to loan their truck!&lt;br /&gt;
** we&amp;#039;ll start caulking 10am tomorrow&lt;br /&gt;
** nail gun w/compressor is ready to go&lt;br /&gt;
* Meeting w/ Mary &amp;amp; John tomorrow - finding stack of pictures&lt;br /&gt;
** still don&amp;#039;t have the scrapbook of articles&lt;br /&gt;
&lt;br /&gt;
Jenny:&lt;br /&gt;
* Order drywall - done&lt;br /&gt;
* Order electric strike, panic bar - strike still needs some research, panic bar &amp;amp; mechanical override have been ordered and door closer has arrived&lt;br /&gt;
** jenny just wrote a new email, found cheaper panic bars on ebay, considering cancelling the order&lt;br /&gt;
** dusty should make this decision&lt;br /&gt;
** quality doesn&amp;#039;t matter too much? ADA only matters on the corner door&lt;br /&gt;
** how hard is finding a compatible mechanical override?&lt;br /&gt;
** dk may have some info tomorrow&lt;br /&gt;
** marc says don&amp;#039;t cancel until you&amp;#039;re sure the override exists and you can get it. he&amp;#039;s looking right now.&lt;br /&gt;
* MSDS for sudo -  Need to know exactly what&amp;#039;s needed - Marc has offered to help. Jenny will sync w/ DK tomorrow morning&lt;br /&gt;
* Ask Jake to finish basement ballasts - &amp;quot;ok soon&amp;quot;&lt;br /&gt;
* ordered sound-insulating &amp;#039;green glue&amp;#039; - should arrive by Friday (currently in San Leandro, so probably sooner. is being shipped straight to omni.)&lt;br /&gt;
* what should I order next?&lt;br /&gt;
** joe: we don&amp;#039;t know. still deciding on insulation types&lt;br /&gt;
*** one kind is easily attached to walls, won&amp;#039;t take up much dead air space, expensive&lt;br /&gt;
*** alternative is fiberglass/rockwall. but does it come with paper backing?&lt;br /&gt;
*** rob: i like brian&amp;#039;s idea of having just denim on one side with no insulation&lt;br /&gt;
*** joe: you&amp;#039;re the only one&lt;br /&gt;
*** much disagreement on insulation strategies. many ideas.&lt;br /&gt;
*** rob: the whole idea of a base trap is to have air space. 2 inches doesn&amp;#039;t do it.&lt;br /&gt;
*** joe: last studio i built we had egg cartons&lt;br /&gt;
*** rob: but dead air is a really good base trap&lt;br /&gt;
*** anka: mice will chew up the egg cartons&lt;br /&gt;
*** joe: yeah we&amp;#039;re not doing that&lt;br /&gt;
*** rob: expensive to buy all that extra insulation when it won&amp;#039;t be very noticable&lt;br /&gt;
* jenny has the bank card and the ebay account info&lt;br /&gt;
&lt;br /&gt;
anka:&lt;br /&gt;
* waiting for the door parts, apparently they&amp;#039;re here now though&lt;br /&gt;
** which? the panic bar and mechanical override won&amp;#039;t arrive until the end of next week unless we find an alternative in town&lt;br /&gt;
** marc &amp;amp; jake are researching the electric strike stuff for card access but it&amp;#039;s harder than they expected. might just go ahead with panic bars for now.&lt;br /&gt;
&lt;br /&gt;
Laura:&lt;br /&gt;
* Plan for &amp;#039;anyone&amp;#039; tasks by priority&lt;br /&gt;
** noemie will contact sudo &amp;amp; opal with the list&lt;br /&gt;
** laura might also reach out, send an email&lt;br /&gt;
** ben put up a jobs board. laura will put it there.&lt;br /&gt;
** maybe each collective could take a job on&lt;br /&gt;
** list is a google spreadsheet called &amp;quot;shit needing fixing&amp;quot; - https://docs.google.com/spreadsheets/d/1UC4TRflYiM_8HcOwJ5U8CPLwUQyJP5JPWF6D09tia2o/edit&lt;br /&gt;
* Coordinate, the door stuff&lt;br /&gt;
** seems other people are on it&lt;br /&gt;
&lt;br /&gt;
Robb:&lt;br /&gt;
* Tear up the rug&lt;br /&gt;
** most of the mold is in the middle of the rug?&lt;br /&gt;
* Assess mold situation&lt;br /&gt;
* Working on ballroom lighting&lt;br /&gt;
* jessie said it&amp;#039;d be a couple weeks. middle room has visible black mold. thinking of sealilng things with plastic and cutting out the 2 big spots.&lt;br /&gt;
* there&amp;#039;s a bunch of crap in there. it&amp;#039;s all my fault. i can condense it. maybe trash some stuff.&lt;br /&gt;
* laura: try to get some help from MPM &amp;amp; Phat Beets&lt;br /&gt;
* rob: maybe later, carpet &amp;amp; drywall cutting is easy&lt;br /&gt;
* one of big ed&amp;#039;s trash room tables is down there right now&lt;br /&gt;
&lt;br /&gt;
yar:&lt;br /&gt;
* still trying to figure out what concrete sealant to pour in the bathroom floor&lt;br /&gt;
* there&amp;#039;s a bucket here but joe says it just smells like ammonia, nothing else&lt;br /&gt;
* might need to buy something new&lt;br /&gt;
* will test this stuff on a piece of broken concrete&lt;br /&gt;
&lt;br /&gt;
Key budget from DK&lt;br /&gt;
* he sent a long email about this today&lt;br /&gt;
* big $7.50 security keys for the front door&lt;br /&gt;
** should not be an omni expense, people should invest in their own key, would ask for key deposit from key holders&lt;br /&gt;
* there&amp;#039;ll be a process for who gets an external key. non-members just have to fill out a form. internal keys won&amp;#039;t change.&lt;br /&gt;
&lt;br /&gt;
=TO DOs=&lt;br /&gt;
&lt;br /&gt;
* GEt fire extinguisher guy to come and charge/install all necessary extinguishers&lt;br /&gt;
** First need to gather all the ones we have not currently mounted, Jenny will coordinate this tomorrow and reach out to John ( fire suppressionn guy not landlord). His proposal was possibly contingent on accepting the estimate for the kitchen hood, would need to pull permit for that (4-6 weeks out). Joe thoughts?&lt;br /&gt;
** joe: john the fire suppression guy is charging us 4-5k and everything&amp;#039;s included in that cost. getting a good deal because it&amp;#039;s such a big job.&lt;br /&gt;
** guy that gives FNB sandwiches on fridays has a company called natural choice. he offered us a free convection oven, even offered to pay to help wire it to 3-phase&lt;br /&gt;
** convection oven would have to go under the hood, replacing part of the wolf. but won&amp;#039;t get the fire suppression.&lt;br /&gt;
** tell jenny to go ahead with john&lt;br /&gt;
&lt;br /&gt;
==Signage==&lt;br /&gt;
* We need several &amp;#039;This is not an exit&amp;#039; signs made - could maybe use the laser cutter?&lt;br /&gt;
** &amp;quot;1910.37(b)(5)Each doorway or passage along an exit access that could be mistaken for an exit must be marked &amp;quot;Not an Exit&amp;quot; or similar designation, or be identified by a sign indicating its actual use (e.g., closet).&amp;quot;&lt;br /&gt;
** &amp;quot;keep 3 feet clear in front of this panel&amp;quot; in front of Rise Above electrical panels (2) and Disco Room (1)&lt;br /&gt;
&lt;br /&gt;
^^ These are on the anyone-can-do task list items. Organizing who will do these tasks is under way.&lt;br /&gt;
&lt;br /&gt;
==Other==&lt;br /&gt;
&lt;br /&gt;
Rob:&lt;br /&gt;
* making shelf for cardboard storage in the trash room&lt;br /&gt;
* Tuesday FNB crew have been putting out all the trash lately. let&amp;#039;s send them a special thank-you.&lt;br /&gt;
&lt;br /&gt;
Joe:&lt;br /&gt;
* mural upstairs is done. grace wants to buy a varnish glaze to protect it, but that&amp;#039;s expensive. maybe just moulding at the bottom to protect from chair legs.&lt;br /&gt;
* PB max wants to recruit berkeley students to work on the kitchen&lt;br /&gt;
** actual cafe owner visiting on thursday. wants to teach &amp;quot;youth food entreprenurial startup things&amp;quot;&lt;br /&gt;
** getting lots of people involved in design &amp;amp; planning phase&lt;br /&gt;
* what about 3-phase? do we definitely want it?&lt;br /&gt;
** crickets. seems so.&lt;br /&gt;
** CCL &amp;amp; Sudo need it&lt;br /&gt;
** bands like it&lt;br /&gt;
** doesn&amp;#039;t mean rewiring, it can service all the 120, it&amp;#039;s just a new box&lt;br /&gt;
** fuckers across the street are paying so wth&lt;br /&gt;
&lt;br /&gt;
Jenny:&lt;br /&gt;
* Omni has $55K total in all bank accounts, and our rent is about to increase 3%.&lt;br /&gt;
* we&amp;#039;ll be done by the end of may. we can do it. we got lots of good hands. just need to make the decisions.&lt;br /&gt;
** &amp;lt;33&lt;br /&gt;
* work is happening during the day and most events are in the evenings, so we can go ahead and have more ballroom events&lt;br /&gt;
* but we need fire to sign off in order to have the big events&lt;br /&gt;
* also paper towels. capoeira people were freaking out because of no paper towels.&lt;br /&gt;
** paper towels are in the secure storage, as well as some metal paper towel holders to be mounted in the downstairs &amp;amp; upstairs ballroom bathrooms. &lt;br /&gt;
** talking about electric hand-dryers&lt;br /&gt;
*** pedal-powered hand dryers :)&lt;/div&gt;</summary>
		<author><name>Yar</name></author>
	</entry>
</feed>