<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://omnicommons.org/mediawiki/index.php?action=history&amp;feed=atom&amp;title=Event%3A2015%2F06%2F08_Building_Working_Group</id>
	<title>Event:2015/06/08 Building Working Group - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://omnicommons.org/mediawiki/index.php?action=history&amp;feed=atom&amp;title=Event%3A2015%2F06%2F08_Building_Working_Group"/>
	<link rel="alternate" type="text/html" href="https://omnicommons.org/mediawiki/index.php?title=Event:2015/06/08_Building_Working_Group&amp;action=history"/>
	<updated>2026-04-28T23:15:19Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.37.2</generator>
	<entry>
		<id>https://omnicommons.org/mediawiki/index.php?title=Event:2015/06/08_Building_Working_Group&amp;diff=3742&amp;oldid=prev</id>
		<title>Yar: copy from pad</title>
		<link rel="alternate" type="text/html" href="https://omnicommons.org/mediawiki/index.php?title=Event:2015/06/08_Building_Working_Group&amp;diff=3742&amp;oldid=prev"/>
		<updated>2015-06-09T04:46:26Z</updated>

		<summary type="html">&lt;p&gt;copy from pad&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;Omni Commons Building Working Group meeting - Monday June 8 2015&lt;br /&gt;
&lt;br /&gt;
== previously ==&lt;br /&gt;
https://omnicommons.org/wiki/Event:2015/05/26_DK_Brain_Dump&lt;br /&gt;
https://omnicommons.org/wiki/Event:2015/06/01_Building_Working_Group&lt;br /&gt;
&lt;br /&gt;
== South wall ==&lt;br /&gt;
* Bottom level almost finished&lt;br /&gt;
* Walls framed for upstairs&lt;br /&gt;
* put wires up today (to hold up the fiberglass)&lt;br /&gt;
* shot foam into cracks near the west end&lt;br /&gt;
* Calvin Lee is our plan checker for the city. DK waiting until he is the engineer of the day to get permit. &lt;br /&gt;
* Laura and Yar + whoever will go to city tomorrow to finish permit, after talking to DK. Joe will orient on plans&lt;br /&gt;
* Joe is leaving this Saturday for 10 days (Sat 13th - Tue 23rd)&lt;br /&gt;
* We should aim for 1st inspection of framing the week of the 15th&lt;br /&gt;
&lt;br /&gt;
=== what&amp;#039;s left? ===&lt;br /&gt;
* joe&amp;#039;s got another 3 days of work (not thursday)&lt;br /&gt;
* will hopefully finish the framing for inspection&lt;br /&gt;
* will get the two ends of the bottom wall, by the closet &amp;amp; staircase&lt;br /&gt;
&lt;br /&gt;
== basement ==&lt;br /&gt;
* rob cut out moldy parts of the drywall. too soggy to scrub.&lt;br /&gt;
* temporarily patched the holes with boards - foam, wood, etc&lt;br /&gt;
* used a steam cleaner + borax&lt;br /&gt;
* framing is still deteriorated - the footer wood is rotten, crumbling&lt;br /&gt;
* ideally we&amp;#039;d replace framing if we ever get more money&lt;br /&gt;
* priority is to pass fire inspection so let&amp;#039;s just cover it with drywall, will look fine&lt;br /&gt;
* will that be fire safe?&lt;br /&gt;
* joe says it wouldn&amp;#039;t be that hard to just put cripples on the bottom&lt;br /&gt;
&lt;br /&gt;
==doors==&lt;br /&gt;
* anka &amp;amp; dusty working on doors tomorrow&lt;br /&gt;
* hallway door to sudo/ccl is poorly hung. frustrating.&lt;br /&gt;
&lt;br /&gt;
=== front door ===&lt;br /&gt;
* nothing&amp;#039;s happening&lt;br /&gt;
* city didn&amp;#039;t like our idea&lt;br /&gt;
* they&amp;#039;re putting in the opener&lt;br /&gt;
* it&amp;#039;s too low but we&amp;#039;re gonna do it anyway&lt;br /&gt;
&lt;br /&gt;
==bathroom==&lt;br /&gt;
* yar still hasn&amp;#039;t treated the concrete. trying to find the bucket of stuff again.&lt;br /&gt;
* do we need more womens&amp;#039; bathrooms?&lt;br /&gt;
* fire doesn&amp;#039;t care about that. whole other can of worms.&lt;br /&gt;
&lt;br /&gt;
==DIsco Room==&lt;br /&gt;
* Joe finished taping drywall facing LC&lt;br /&gt;
* empty socket with no bulb, no globe/cover, no exposed wires up in the ladder closet thingy&lt;br /&gt;
&lt;br /&gt;
=== hole in the west wall ===&lt;br /&gt;
* should we insulate the DR hole before closing it? tyvek? denim? might need weather proofing&lt;br /&gt;
* will the drywall overlap? will that look bad? we could hang a picture or a mirror over it&lt;br /&gt;
* entire wall of the dance floor has a U-channel, all ready for mirrors. just need to set them in &amp;amp; tack them. just need to find them the right height or cut them.&lt;br /&gt;
* should we frame it? silicone it?&lt;br /&gt;
** no, as long as it&amp;#039;s closed, it&amp;#039;s fine. screws, spackle, done.&lt;br /&gt;
** but the edges will look weird&lt;br /&gt;
** we&amp;#039;ll figure it out tomorrow&lt;br /&gt;
&lt;br /&gt;
== kitchen ==&lt;br /&gt;
* meeting tomorrow with max, sophia chang (the kitchener), sal (actual cafe)&lt;br /&gt;
&lt;br /&gt;
== Other Reports ==&lt;br /&gt;
* laura&amp;#039;s working through the big list piece by piece&lt;br /&gt;
* talk about covering more lightbulbs&lt;br /&gt;
* gerald wants to get LC ceiling tiles gone, but those are necessary for the cafe to operate&lt;br /&gt;
** laura will contact gerald to take on some of the small electrical jobs and filling in ceiling tile &lt;br /&gt;
** roan has other stuff going on, unable to work right now&lt;br /&gt;
* ballroom bathroom grafitti&amp;#039;s getting better. more diverse. because joe is writing it.&lt;br /&gt;
* storage closet shelves are caving in / bowing. need to be redone.&lt;br /&gt;
* trash room is a mess. people aren&amp;#039;t sorting it because not enough bins clearly labelled. laura will buy some 3-in-1 bins&lt;br /&gt;
&lt;br /&gt;
== priorities ==&lt;br /&gt;
&lt;br /&gt;
=== upcoming milestones ===&lt;br /&gt;
* fire inspection&lt;br /&gt;
* usable ADA toilet&lt;br /&gt;
&lt;br /&gt;
=== dangerous distractions ===&lt;br /&gt;
* stage projector screen&lt;/div&gt;</summary>
		<author><name>Yar</name></author>
	</entry>
</feed>