<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://omnicommons.org/mediawiki/index.php?action=history&amp;feed=atom&amp;title=Event%3A2015%2F08%2F17_Building_Working_Group</id>
	<title>Event:2015/08/17 Building Working Group - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://omnicommons.org/mediawiki/index.php?action=history&amp;feed=atom&amp;title=Event%3A2015%2F08%2F17_Building_Working_Group"/>
	<link rel="alternate" type="text/html" href="https://omnicommons.org/mediawiki/index.php?title=Event:2015/08/17_Building_Working_Group&amp;action=history"/>
	<updated>2026-04-28T23:15:38Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.37.2</generator>
	<entry>
		<id>https://omnicommons.org/mediawiki/index.php?title=Event:2015/08/17_Building_Working_Group&amp;diff=3887&amp;oldid=prev</id>
		<title>Yar: copy from pad</title>
		<link rel="alternate" type="text/html" href="https://omnicommons.org/mediawiki/index.php?title=Event:2015/08/17_Building_Working_Group&amp;diff=3887&amp;oldid=prev"/>
		<updated>2015-08-18T21:31:22Z</updated>

		<summary type="html">&lt;p&gt;copy from pad&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;NOmni Building Working Group, August 17, 2015&lt;br /&gt;
&lt;br /&gt;
== who&amp;#039;s here ==&lt;br /&gt;
* laura, matt, yar, daniel, mary, remote joe&lt;br /&gt;
&lt;br /&gt;
== work party ==&lt;br /&gt;
* how&amp;#039;d this week go? what&amp;#039;d we do?&lt;br /&gt;
* south wall romex removed, new wire not installed yet. joe &amp;amp; his son are working on a written plan. switching from MM to MC flexible metallic conduit, after joe checks with inspector (joel ortiz) to make sure&lt;br /&gt;
* a few sheets of drywalling on the first floor south wall&lt;br /&gt;
* more doors got marked and screwholes glued. ready to screw and hang next time yar has an extra hour&lt;br /&gt;
* LC roof fans inspected - pigeons and wasps need to be removed&lt;br /&gt;
* got rid of lots of stuff from basement, including red stage. dump runs yesterday, today, tomorrow&lt;br /&gt;
* upstairs kitchen bathroom light fixed - needs metal cage&lt;br /&gt;
* electrical supplies mostly sorted - still some needed&lt;br /&gt;
* Daniel and mary measured and labeled all the old Romex so it can be given or sold to another job, or used by Sudo &lt;br /&gt;
WHat went well:&lt;br /&gt;
* good number of volunteers, they always had something to do&lt;br /&gt;
* organizing tasks in advance helped&lt;br /&gt;
* organizers arriving early to get set up&lt;br /&gt;
* frame removed from west LC mezzanine staircase&lt;br /&gt;
&lt;br /&gt;
What didn&amp;#039;t go well&lt;br /&gt;
* yar got there late, jessie couldn&amp;#039;t stay&lt;br /&gt;
* kerrie was sick&lt;br /&gt;
* couldn&amp;#039;t tell what basement wall needed to be patched&lt;br /&gt;
** rob knows about this, did it partially&lt;br /&gt;
** need to patch the water leak on the outside&lt;br /&gt;
** also involves getting childrens hospital to repave their parking lot. need contacts from DK&lt;br /&gt;
* food never showed up. next time cook with FNB or just use their kitchen&lt;br /&gt;
&lt;br /&gt;
what could we do on sat 22?&lt;br /&gt;
* hang doors&lt;br /&gt;
* more drywalling, patching holes &lt;br /&gt;
* mount mirrors&lt;br /&gt;
* retile bathroom&lt;br /&gt;
* basement ceiliing tiles&lt;br /&gt;
* install 1 paper towel dispenser in stage l bathroom&lt;br /&gt;
* buy 3 more paper towel dipsensers and install secret bathroom, upstairs kitchen bathroom, ada bathroom&lt;br /&gt;
* fix secret bathroom door&lt;br /&gt;
* finish off the pigeons and wasps&lt;br /&gt;
* put cage on upstairs kitchen bathroom, or replace bulb with shatter proof bulb&lt;br /&gt;
* really need to go over the paper list more&lt;br /&gt;
* floor repair&lt;br /&gt;
&lt;br /&gt;
== wheelchair bathroom ==&lt;br /&gt;
* Becoming Omni group has requested that we have the wheelchair bathroom ready in time. Probably end of September.&lt;br /&gt;
&lt;br /&gt;
== klaus ==&lt;br /&gt;
* laura and yar met with klaus a few weeks ago, forgot to report back&lt;br /&gt;
* he recommended we leave doors off the &amp;quot;intersection of doom&amp;quot; for now and pass fire inspection without them, then put new doors further into the ballroom later&lt;br /&gt;
* he also made us take down the stage curtail&lt;br /&gt;
&lt;br /&gt;
==Remaining Changes to pass fire inspection of ballroom==&lt;br /&gt;
* Remove hardware from front shattuck doors and install panic bars with normal latching mechanism&lt;br /&gt;
* Reinstalling exit signs&lt;/div&gt;</summary>
		<author><name>Yar</name></author>
	</entry>
</feed>