Difference between revisions of "Electrical"

From Omni Commons
Jump to navigation Jump to search
(→‎Panel AB: amend circuit #2 & #3 labels)
(→‎Panel ADA: where it is)
Line 211: Line 211:
==Panel ADA==
==Panel ADA==
[[File:Panel-ada.jpg|right|thumb|Panel ADA]]
[[File:Panel-ada.jpg|right|thumb|Panel ADA]]
This panel is located upstairs in the "shower room" which also used to house a hot tub and laundry machines.
{| class="wikitable" style="text-align: center;"
{| class="wikitable" style="text-align: center;"
|-
|-

Revision as of 20:51, 17 March 2018

This page provides a "living document" of the Omni Commons electrical system. It is not necessarily completely accurate, though it strives to be, and is always important to get updated!

Primary Electrical System

  • Main Panel (in Phat Beets, room E of rear [48th St] exit)
    • Panel A (adjacent to main in Phat Beets)
      • Panel AA (in Phat Beets, on E wall adjacent to Entrance Hall)
      • Panel AB (in basement next to N staircase)
      • Panel AC (in basement NW Kitchen Pantry, on E wall)
      • Panel AD (located upstage left in N corner of W wall of ballroom)
      • Panel AE (located in storage room S of stage in N corner of W wall of ballroom)
    • Panel B (in Crow's Nest above stage in ballroom)
      • Panel BA (in rear ballroom balcony near S wall)
        • Panel BAA (on N wall of classroom between ballroom and Entrance Hall)
          • Panel BAAA (behind Entrance Hall counter on S wall)
    • Panel C (in Disco Room at base of ladder to DJ booth)
    • Panel D (in Phat Beets on E wall shared with Entrance Hall)

X = Disconnected

Main Panel

Omni's main electrical panel
Label -> Breaker # Breaker # <- Label
Panel B & Panel D 200amps 1 2
3 4
Panel A 200amps 5 6
7 8
X 9 10 Panel C 100amps
11 12
Storage #5 / Trash Room 13 14 n/a
15 16 n/a
Storage #5 / Trash Room 17 18 n/a
Counter Culture Labs
(CCL) Closet
19 20 n/a
21 22 n/a
n/a 23 24 n/a


Panel A

Panel A

200amps

Label -> Breaker # Breaker # <- Label
Panel AA (Entrance Hall) 1 21 Panel AE
2 22
Panel AB 3 23 220V plug (former rise above dryer)
via Panel AA
4 24
? Panel AC 5 25 Panel AD
6 26
7 27
8 28
9 29  
Upstairs (cafe mezzanine) kitchen light /
Upstairs (cafe mezzanine) bathroom lights /
Exit Sign at top of W cafe mezzanine staircase
10 30 Sudo Room outlets
on South Wall
X 11 31 X
Hood over oven in upstairs
kitchenette (cafe mezzanine) /
W Wall Kitchenette Outlet (R of sink) /
W wall kichenette outlet (Above oven in alcove)
12 32
13 33
14 34
15 35
16 36 X
17 37 Blue Classroom S wall outlets
2 TIL Office Lights (upstairs) /
Front Door Exit Sign /
Two Lights on Beam at entrance
18 38
Light fixture and outlets in
Blue Classroom alcove on N wall
19 39
Upstairs kitchenette (cafe mezzanine) S wall outlets /
W Wall Kitchenette Outlet (L of sink) /
N wall kitchenette outlets (at entrance) /
Outlets under bar on S Wall of Disco Room
near S Wal of Kitchenette
20 40


Panel AA

Panel AA
Label -> Breaker # Breaker # <- Label
6 12
5 11
4 10
3 9 wheelchair bathroom light & outlet
2 8
1 7


Panel AB

Panel AB
Label -> Breaker # Breaker # <- Label
8 16
7 15
6 14
5 13
4 12
Ballroom Furnace 3 11
Entrance Hall
Furnace
2 10
1 9


Panel AC

Panel AC


Panel AD

Panel AD
Label -> Breaker # Breaker # <- Label
Counter Culture Labs (CCL)
E wall outlets
2 1 Stage Vanity Lights
& NW Ballroom Bathroom Light
& NW Bathroom Hallway Light
Panel ADA (2 x 30A)
Former Hot Tub in
Mezzanine Shower Room
4 3 Stage Left Ballroom Floor Outlets
6 5 Stage Right Ballroom Floor Outlets
& Stage Right Outlets
8 7 Upstage Center outlet
& Stage Left Outlet
10 9 Crow's Nest Interior light/fan
& SW Ballroom Staircase Light
& Ballroom Mop Closet Light
& Lights beneath Ballroom Mezzanine
SE Ballroom Bathroom Lights 12 11 GFI outlet (used for
screen printing sink in
Mezzanine Shower Room)


Panel ADA

Panel ADA

This panel is located upstairs in the "shower room" which also used to house a hot tub and laundry machines.

Label -> Breaker #
Former Hot Hub 1


Panel AE

Panel AE
Label -> Breaker # Breaker # <- Label
? Runs Under Stage 1 2 Ballroom Under Bar
Outlet #2 (from L)
3 4 Ballroom Under Bar
Outlet #1 (from L)
Ballroom Shattuck Entrance's Exit Signs (3)
Ballroom Under Bar
Outlet #3 (from L)
5 6 Stage Storage Room (office #3) Outlets
Ballroom Under Bar
Outlet #4 (from L)
7 8 X
Ballroom Balcony S Wall Lights
& SW Staircase Exit Signs
& SE Staircase lights / exit signs
& SW Ballroom wall outlets
9 10 X
X 11 12 X


Panel B

Panel B

100amps

Label -> Breaker # Breaker # <- Label
X 1 2 X
X 3 4 X
X 5 6 Basement Vent
X 7 8
Panel BA
(Ballroom Balcony)
9 10 Sudo Robot Arm
11 12
Sudo Room Servers 13 14 X
Outlets in Room adjacent
to Crow's Nest
15 16 X
X 17 18 Exhaust Fans & Outlets in
over-stage Crow's Nest
X 19 20 Sudo Room outlets
on South Wall


Panel BA

Panel BA
Label -> Breaker # Breaker # <- Label
Ballroom Fans 1 2 Balcony Chandelier (Single)
Ballroom Rafter/Lattice
Disco Ball
3 4 Ballroom Chandeliers
X 5 6
Aux #4 7 8 Panel BAA (Office #1)
X 9 10
Ballroom Rafter/Lattice
Disco Ball Lights
11 12 X
Aux #1 13 14 Aux #2
Aux #5 15 16 Aux #3


Panel BAA

Panel BAA
Label -> Breaker # Breaker # <- Label
Panel BAAA
in Entrance Hall
1 2 n/a
3 4 n/a
5 6 X
n/a 7 8


Panel BAAA

Panel BAAA
Label -> Breaker # Breaker # <- Label
n/a 2 1 Outlet Under Counter
n/a 4 3 Outlet next to Counter
(1ft above floor)
& Outlet under counter
Outlet (twist lock)
on counter
6 5 Outlet under counter
(circuit 5 breaker nfg)
8 7


Panel C

100amps

I couldn't find this panel to take a picture --yar

Panel D

Panel D

100 amps

Floorplans

Documentation Protocol

Any building's electrical system is intended to serve the needs of the users of the building in a safe manner. However, we operate within constraints such as the historical developments of the electrical system, regulations, best practices, etc. In order to reduce ambiguity and risk, we must use a consistent documentation protocol throughout the system to understand and share knowledge of historical, current, and future uses.

Naming Convention

  • Label the main electrical panel as "MAIN"
  • Label the direct sub-panels of the main panel with a letter, e.g. "A", "B".
  • Label each sub-panel that is connected to a first-tier sub-panel of the main panel.
    • "origin panel letter" + "sub-panel letter" + ... (for each sub-panel add another letter) ...
      • e.g. "AA" for the first sub-panel from panel "A"
      • e.g. "AAB" for the second sub-panel attached to panel "AA"
  • For each circuit, label each outlet, switch, and load with:
    • the appropriate sub-panel name (described above) + "breaker number"
      • e.g. All the outlets in one room that are on the same circuit should be labeled "CA4" meaning the circuit is on breaker 4 on panel CA, which is the first panel originating from panel C that connects to the Main panel.
    • the draw on the curcuit
      • e.g. 20 amps

Here is the OLD breaker panel diagram

Protocol

  • We are especially (not exclusively) updating our electrical system documentation on a room-by-room basis.
  • As you work throughout Omni Commons, you should only use the system described above to map the electrical system.
  • All other systems will be overridden.
  • You can print this page and the building floorplans above in order to document the labeling you make on the actual outlets, panels, etc.
    • After labeling and writing on the printed building floorplan, deliver it to any member of the Building Working Group.