Difference between revisions of "Timeline"

From Omni Commons
Jump to navigation Jump to search
(→‎sudo room: updates)
Line 4: Line 4:
* '''Status:''' Sudo room is currently engaged in a lease agreement for a space at [https://sudoroom.org/wiki/2141_Broadway 2141 Broadway], but there are inherent and emergent limitations to this agreement based on both the parties involved (negative interactions) and the physical space (size). Sudo room is engaged in a "[https://sudoroom.org/wiki/Reboot sudo reboot]" to reflect on and rebuild sudo room, hopefully to expand and become something like a ''sudo space''. Sudo room has been involved with the Omni Collective project and potential to rent The Omni since the beginning, and continues to pursue it as a viable option for an alternative, and opportune new location.
* '''Status:''' Sudo room is currently engaged in a lease agreement for a space at [https://sudoroom.org/wiki/2141_Broadway 2141 Broadway], but there are inherent and emergent limitations to this agreement based on both the parties involved (negative interactions) and the physical space (size). Sudo room is engaged in a "[https://sudoroom.org/wiki/Reboot sudo reboot]" to reflect on and rebuild sudo room, hopefully to expand and become something like a ''sudo space''. Sudo room has been involved with the Omni Collective project and potential to rent The Omni since the beginning, and continues to pursue it as a viable option for an alternative, and opportune new location.
* '''Preparation:''' We have some tools, assets, and infrastructure that would need a secure home (such as 3D printers, CNC mill, wifi equipment, servers, small projects). Could look at interim storage options, or seek an agreement where we overlap betwee spaces, or simply have a one-weekend month-transition over. There are likely some members who'd be willing to assist with clearing spaces (e.g. the Bocce ball court back room, a potential piece of our future space), perhaps in exchange for pay or rent reduction.
* '''Preparation:''' We have some tools, assets, and infrastructure that would need a secure home (such as 3D printers, CNC mill, wifi equipment, servers, small projects). Could look at interim storage options, or seek an agreement where we overlap betwee spaces, or simply have a one-weekend month-transition over. There are likely some members who'd be willing to assist with clearing spaces (e.g. the Bocce ball court back room, a potential piece of our future space), perhaps in exchange for pay or rent reduction.
=Hacker Spa=
* '''Status:''' Hacker Spa is a new project, we are ready to "move in" right away. Which means we are ready to have access to the space we need to rennovate right away.
* '''Preparation:'''

Revision as of 23:55, 24 April 2014

What's your timeline for moving into the space? Is a June 1 move-in date feasible for your project? How about July 1, August 1, September 1? Any critical points to take into consideration? Leeways? Compromises?

sudo room

  • Status: Sudo room is currently engaged in a lease agreement for a space at 2141 Broadway, but there are inherent and emergent limitations to this agreement based on both the parties involved (negative interactions) and the physical space (size). Sudo room is engaged in a "sudo reboot" to reflect on and rebuild sudo room, hopefully to expand and become something like a sudo space. Sudo room has been involved with the Omni Collective project and potential to rent The Omni since the beginning, and continues to pursue it as a viable option for an alternative, and opportune new location.
  • Preparation: We have some tools, assets, and infrastructure that would need a secure home (such as 3D printers, CNC mill, wifi equipment, servers, small projects). Could look at interim storage options, or seek an agreement where we overlap betwee spaces, or simply have a one-weekend month-transition over. There are likely some members who'd be willing to assist with clearing spaces (e.g. the Bocce ball court back room, a potential piece of our future space), perhaps in exchange for pay or rent reduction.

Hacker Spa

  • Status: Hacker Spa is a new project, we are ready to "move in" right away. Which means we are ready to have access to the space we need to rennovate right away.
  • Preparation: