Difference between revisions of "ToFix"

From Omni Commons
Jump to navigation Jump to search
(went over 2 & 3 on the list, categorized by priority)
(cursory update)
(12 intermediate revisions by 3 users not shown)
Line 1: Line 1:
stuff in the building to fix
stuff in the building to fix


= Top Priority =
==General==
<s>Remove all extension cords, replace with conduit or install outlets if necessary</s> ---> still need to install conduit by 48th St entrance


== Ballroom Area ==
== Ballroom ==


=== Bar ===
=== Bar ===
* soffet-mounted ceiling light fixtures need: lightbulbs tested / replaced if necc
 
* Put up ABC signage req. for pub or private parties w/ alcohol re: cancer/pregnancy warning
* Outlets on east/shattuck-side wall need to be: removed, wire-nutted, wrapped in elec tape, covered with blank faceplates. TURN OFF CIRCUIT FIRST. Note: furthest N outlet not disconnected, only outlet in the center of the wall
* Outlets on east/shattuck-side wall need to be: removed, wire-nutted, wrapped in elec tape, covered with blank faceplates. TURN OFF CIRCUIT FIRST. Note: furthest N outlet not disconnected, only outlet in the center of the wall
* sink needs to have hole/leak repaired (stainless steel), and possibly re-mounted / re-caulked.
** Need to remove blue masonite tabletop as it is weighing the sink down! Modify and return as actual cabinetry / surface.


=== Ballroom-Shattuck Exit Area ===
=== Ballroom-Shattuck Exit Area ===
* install closers to both inner doors.
* install panic bars to both inner doors.
* install panic bars to both outer doors.
* install light cover into flourescent panel (22"x3') - flourescents are 2x 2' bulbs
* install light cover into flourescent panel (22"x3') - flourescents are 2x 2' bulbs


=== Mezzanine ===
=== Mezzanine ===
* SW staircase up: Repair hole in south wall near floor immediately across from stairs (see south wall acoustic treatment)
* SW staircase up: Repair hole in south wall near floor immediately across from stairs (see south wall acoustic treatment)
* <s>SW & SE staircases: motion detectors up & down</s>
* SW & SE staircases: LED strip lighting on each side


=== Mezzanine Bathroom ===
=== Mezzanine Bathroom ===
Line 27: Line 28:


=== Crow's Nest ===
=== Crow's Nest ===
* Clear everything 3' in front of electrical subpanel including all cords, lighitng, etc
* <s>Clear everything 3' in front of electrical subpanel including all cords, lighitng, etc</s> --> double check periodically
* acquire & install cover for light (fixture takes glass orb / cover around bulb, it is missing)
* acquire & install cover for light (fixture takes glass orb / cover around bulb, it is missing)
* extend balcony railing to out in front of balcony hatch - on E side of R&J balcony (building & osha safety)
* extend balcony railing to out in front of balcony hatch - on E side of R&J balcony (building & osha safety)
=== A/V Room ===
* Patch long thinnish strip above door where conduit is exposed.
* <s>Patch hole near floor in NW corner of this room near door jamb.</s> <--needs another coat but effectively done


=== Ticketbooth Room ===
=== Ticketbooth Room ===
* Remove giant bookshelf and all debris/material from this room. Call Emerson - ask them to get their table back, or are they donating to us ? :)
* Patch small hole in ceiling corner above ticket window where new conduit was run.  
* Patch small hole in ceiling corner above ticket window where new conduit was run.  
* install new outlet (existing is cracked and not attached to wall


== Disco Room ==
== Front Area ==  
* light switch cover near 48th street door should be replaced by one with less-sharp edges (better-sized)
* cover floor sink behind front counter area w minimum 3/4" plywood cut out and sealant (trip hazard/health)
* weight load for high triangular shelves in corners to be assessed (julia) to determine if speakers etc can be placed there
* build secure mailbox


== La Commune ==  
=== balcony ===
* install closer to basement stairs door
* 4'x2' light fixture panel cover  
* replace all low uncover lights near entrance w cover lights x3
* bathroom: Replace light fixture (sub-8') with standard caged bell-jar type
* locked storage - unplug and store all extension cords
* between fridges: Lock roofer's ladder (that lives b/t fridges in balcony) to wall.  
* <s>kitchenette: replace CFL bulb in kitchen with 'safe' LED (silicone-wrapped kind) spot shape - e.g. for food safety if CFL breaks http://www.homedepot.com/p/Philips-60W-Equivalent-Soft-White-A19-A-Line-Spiral-CFL-Light-Bulb-2-Pack-E-434357/203001435</s>
== Rise Above ==
* replace locking main door to Rise Above in hallway with twenty minute solid-core (fire-code)
* replace 2x hollow-core sliding doors with 20 minutes solid-core sliding doors (fire-code)
* replaced busted circuit breaker in every electrial panel (like in the 42 breaker panel) with either working breaker or factory blanks.
* put closer on main door to Rise Above
* remove 2x6 on ceiling on south side of room (COORDINATE WITH GABRIELA 1ST - move or cover all her stuff.
* stage left - install paper towel dispenser and paper towels.


== Sudo ==
=== TIL ===
* created dedicated space for storing excess lumber (long pieces), pipe, metal pieces, etc so they are not in jumbles (fire code).
* west wall - run more 3/4" conduit further down west wall. Must know code.
 
== Sudo/CCL ==
* ballroom door - put closer on this door
* basement door - if possible, put closer on this door (may not be possible)
* entire room perimeter - 5LB ABC fire extinguishers at correct height every ~75' - starting w under each exit sign
* hallway door - install panic hardware & lock to this door
* hallway door - install closer to door
* ticket booth room - install new outlet (existing is cracked and not attached to wall)
 
== TIL (TI) ==
* cover exposed wires in east wall (near bookshelf). can use a plate
* cover exposed wires in east wall (near bookshelf). can use a plate
* get clear cover to put over wall switch for old electric timer in wall in big bookshelf unit in south wall of TL
* get clear cover to put over wall switch for old electric timer in wall in big bookshelf unit in south wall of TL


== Basement ==
== Basement ==
* south wall: close holes in basement wall where opened to remove mold.
* south wall: close holes in basement wall where opened to remove mold.
* identify stuff in bunker rooms & hallway: what is Phat Beets, Black Holes, what is junk/unclaimed?
* LibLens room ventilation doesn't work. people can suffocate in there.
* Phat Beets room ventilation doesn't work. people can suffocate in there.
* <s>clear remaining junk</s>


=== ceiling ===
=== ceiling ===
* Acquire & install light fixture covers for the 4' flourescent fixtures in basement offices (bunker rooms) - roughly ~48"x16".  
* Acquire & install light fixture covers for the 4' flourescent fixtures in basement offices (bunker rooms) - roughly ~48"x16".  
* install protective bulb covers over remaining working 8' flourescents: 6x
* install protective bulb covers over remaining working 8' flourescents: 6x
* unscrew piece of broken lightbulb from East basement hallway, replace bare-bulb fixture with covered fixture
* replace bare-bulb fixture with covered fixture
* re-attach and restore service to entire strip of 8' flourescents along west wall (closest to sudo) that had been decommissioned
* re-attach and restore service to entire strip of 8' flourescents along west wall (closest to sudo) that had been decommissioned
* acquire and affix 1'x1' ceiling tiles in NW corner of basement, so lighting fixture & strip of lights can be re-connected. ~120 tiles
* acquire and affix 1'x1' ceiling tiles in NW corner of basement, so lighting fixture & strip of lights can be re-connected. ~120 tiles
Line 83: Line 68:
* Replace bad ballast in any 8' flourescent fixture (that is not turning on. If not sure try lights in it that do work in another fixture.
* Replace bad ballast in any 8' flourescent fixture (that is not turning on. If not sure try lights in it that do work in another fixture.


=== kitchen ===
== Bocce Court ==
* Purchase and affix Class-K extinguisher at correct height
* hallway: install paper towel dispenser and paper towels
* Cover exposed wiring in FNB locked-pantry ceiling (with e.g. metal plate)
* <s>entire room perimeter - 5LB ABC fire extinguishers at correct height every ~75' - starting w under each exit sign</s>
* Install Ansul fire-suppression in hood
* Replace entire 4' flourescent light fixture closest to stove (has 1x broken tube holder)
* Acquire makeup air into kitchen (remove desk fan from duct, replace with something to code - 95% of hood CFM)
* Put closers on both basement kitchen doors
* steam clean stove hood


= Medium Priority =
===  Sudo ===
* <s>created dedicated space for storing excess lumber (long pieces), pipe, metal pieces, etc so they are not in jumbles (fire code). </s>
* west wall - run more 3/4" conduit further down west wall. Must know code.


== Ballroom Area ==
=== CCL ===
* <s>run new conduit / circuits to reduce excessive extension cord usage (fire code)</s>
* west closet: clean up & seal west wall
* west closet: put bulb covers over the 2x 4' flourescents
* west closet: put bulb covers over the 2x 4' flourescents in annex/closet
* west closet: replace ballast in flourescent fixture in this room
* east closet: cover exposed octogon junction box in ceiling with appropriate octogon plate
* east closet: replace exposed wiring from new LED fixture to ceiling with armored flex or EMT


=== Bar ===
== Disco Room ==
* Determine fix for leaking sink in 3-sink (weld?) - southmost sink (on left if you are behind bar)
* light switch cover near 48th street door should be replaced by one with less-sharp edges (better-sized)
* Install floor sink under 3-sink as per health code
* <s>giant lateral file cabinet needs to be removed / find a better home somewhere JOHN GIVENS TO REMOVE - email photo</s>
* Trace & label ALL elec outlets in this room
* A/V instructions need to be made for home stereo / speaker setup, mixer in crows nest etc. in this room
* West exit door (top landing to 48th st staircase) needs be panic bar'd
* install closer to main (east) door of disco room
* install closer to west / emergency exit door of disco room
* remove or permanently mount ALL LARGE UNMOUNTED PLATE GLASS MIRRORS in this room: safety hazard
* hole in wall in west staircase down to 48th needs be covered
* plate to be installed to cover exposed ceiling wires immediately in front of 48th st street door leading up to disco room
* crow's nest west wall: exposed electrical wires / fixture needs to be covered (and traced)


=== Ticketbooth Room ===
== Phat Beets ==
* Install closer to Ticketbooth room door (pref. good kind with long close time for wheelchair)
* replaced busted circuit breaker in every electrical panel (like in the 42 breaker panel) with either working breaker or factory blanks.
* install new outlet (existing is cracked and not attached to wall
* remove 2x6 on ceiling on south side of room (move or cover all PB stuff)


=== A/V Room ===
<br /><br /><br /><br /><br />
* Patch small hole above door where conduit is peeking through.
= Doors =
* Patch hole near floor in NW corner of this room near door jamb. <--In progress by kkr


=== Mezzanine ===
=== shattuck-ballroom outer ===
* SE staircase: Install new led strip lighting on ea. side of stair to replace dead lighting strips
* <s>need panic bars</s>
* SW staircase up: motion detector installed onto light fixture.
* SW staircase down: motion detector installed onto light fixture.
* SW staircase up: Install new led strip lighting on ea. side of stair to replace dead lighting strips
* SW staircase up: Determination if 3-way switch needs to be installed at top of stair. Currently there is only a switch at bottom landing.


=== Crow's Nest ===
=== shattuck-ballroom inner ===
* Refinish & airgap-seal east wall above loft in this room so room functions as soundproofing / air barrier to exterior of bldg
* <s>needs to be hung, closers, panic bars</s>
* Install real doorknob, remove latch
* make north door to romeo & juliet balcony airtight (or better fitting) for turning this room into a soundproofing barrier
* Install closer to main (east) door
* Install closer to north / balcony door
* ensure balcony hatch is robust enough to support 300lb standing weight


=== Mezzanine "Book Room" ===
=== cafe-basement (big white door) ===
* Electrical subpanel needs be moved to plywood wall south of panel, onto drywall, 2' from ground.
* needs closer
* 3-way switch wiring (for chandelier) inside subpanel needs to be removed and placed elsewhere as not ok in-panel.
* fix panic bar
* Install closer to Mezzanine room door


== Basement Area ==
=== bocce hallway ===
* west wall: re-connect or newly connect toggle switch to basement ventilation fan in basement. Currently breakers turn it on.
* needs rehang, closer, panic bar, lock


=== kitchen ===
=== bocce-basement ===
* Resurface kitchen floor, cover with quarry tile
* if possible, put closer on this door (may not be possible)
* Fix or replace corroded window frames along shattuck
* Cut in mop sink in westmost pantry area
* Acquire and install tankless water heater, check gas line diameter & exhaust ductwork


== Cafe Balcony ==
=== bocce-ballroom ===
* <s>closer</s>


=== bathroom ===
=== mezzanine book room ===
* Install closer to bathroom door.
* Replace door handle with non-locking handle.


=== kitchenette ===
=== crows nest ===
* remove outlets & install blank plate in 4xoutlet area underneath counter on north side, near doorway
* <s>Install real doorknob, remove latch</s>


=== shower room ===
=== phat beets ===
* Rekey/install lock to balcony shower room
* replace locking main door to Phat Beets in hallway with twenty minute solid-core (fire-code)
* Install closer to shower room door
* put closer on main door to PB


== Bocce Room ==
=== Pink Room ===
* to hallway: closer
* to ballroom: closer


* left (west) CCL storage: make plywood plate to cover / inset over exposed ejector pump sticking out under wall
<br /><br /><br /><br /><br /><br /><br />


== Disco Room ==
= Wishlist =
* 4th window from main door as a broken pane
* 5th window from main door the window frame rub against the wall on E side


== La Commune ==  
== Ballroom Area ==
* cover floor sink behind front counter area w minimum 3/4" plywood cut out and sealant (trip hazard/health)
* balance ballroom fans
* fix broken glass pane in 4th window west of front door in La Commune
* take out and cap OR at least cover w small platform the copper water lines along floor behind the front counter


= Bottom Priority =
=== Bar ===
* Determine fix for leaking sink in 3-sink (weld?) - southmost sink (on left if you are behind bar)
* Install floor sink under 3-sink as per health code


== Ballroom Area ==
=== Crow's Nest ===
=== Crow's Nest ===
* Make main (east) door to this room better fitting / gasketed against all air gaps so it functions for soundproofing
* Make main (east) door to this room better fitting / gasketed against all air gaps so it functions for soundproofing
* rebalance fan
* rebalance fan
* ensure balcony hatch is robust enough to support 300lb standing weight
* Refinish & airgap-seal east wall above loft in this room so room functions as soundproofing / air barrier to exterior of bldg
* make north door to romeo & juliet balcony airtight (or better fitting) for turning this room into a soundproofing barrier


=== Mezzanine Bathroom ===
=== Mezzanine Bathroom ===
* active ventilation needs to be wired & installed (exhaust) in current ventilation window
* active ventilation needs to be wired & installed (exhaust) in current ventilation window
* install door stop so the door can be propped open sometimes.


=== Stage ===
=== Stage ===
Line 177: Line 165:
=== Ticketbooth Room ===
=== Ticketbooth Room ===
* Install threshold plate to base of jamb (no more than 1/2" high as per ADA) to cut down on sound from ballroom  
* Install threshold plate to base of jamb (no more than 1/2" high as per ADA) to cut down on sound from ballroom  
* install gaskets to door jambs to cut down on sound. (icarus)
* install gaskets to door jambs to cut down on sound.
* Install door closer


=== Mezzanine Bathroom ===
== Basement ==
* install door stop so the door can be propped open sometimes.


== Basement Area ==
=== kitchen ===
 
* Resurface kitchen floor, cover with quarry tile, or seal / treat concrete
=== Kitchen ===
* Fix or replace corroded window frames along shattuck
* Cut in mop sink in westmost pantry area
* Acquire and install tankless water heater, check gas line diameter & exhaust ductwork
* <s>Purchase and affix Class-K extinguisher at correct height</s>
* Cover exposed wiring in FNB locked-pantry ceiling (with e.g. metal plate)
* Install Ansul fire-suppression in hood
* Replace entire 4' flourescent light fixture closest to stove (has 1x broken tube holder)
* Acquire makeup air into kitchen (remove desk fan from duct, replace with something to code - 95% of hood CFM)
* Put closers on both basement kitchen doors
* steam clean stove hood
* Knock out / expand west kitchen wall to next-west supporting pipe
* Knock out / expand west kitchen wall to next-west supporting pipe
* Remove firred-out drywall, cover with FRP
* Remove firred-out drywall, cover with FRP


== Cafe Balcony ==
== Front Area ==
* fix broken glass pane in 4th window west of front door in La Commune


=== Balcony ===
* between fridges: get an exterior outlet plastic cover for 4"x4" outlet box here, so outlets do not get wet if it rains when roof hatch is open
* between fridges: get an exterior outlet plastic cover for 4"x4" outlet box here, so outlets do not get wet if it rains when roof hatch is open
* closet between fridges: install lock to this door, make lost & found room
* ~6" high barrier along balcony (to stop drinks etc from being knocked off onto those in cafe)
 
* bathroom: install ceiling exhaust fan
=== bathroom ===
* Install ventilation exhaust fan in cafe balcony bathroom ceiling
 
=== kitchenette ===
* acquire and cable-lock to wall electric kettle; remove all stovetop kettles.
* replace gas stove with induction model (its a sklinny stove, keep eye peeled at urban ore H4H etc)
* replace stove exhaust fan with one that will exhaust air directly up through cabinets (in a duct) to above kitchen


=== TIL ===
=== TIL ===
Line 205: Line 197:


== Disco Room ==
== Disco Room ==
* test linoleum for asbestos content
* <s>test linoleum for asbestos content</s>
* remove linoleum (may need to hire certified abatement company if asbestos present)
* <s>remove linoleum (may need to hire certified abatement company if asbestos present)</s>
* sand wood floor and seal with water based polyurethane
* sand wood floor and seal with water based polyurethane
* all A/V & musical equipment (including in crow's nest) needs to be recorded (serial #s) and ownership determined
* all A/V & musical equipment (including in crow's nest) needs to be recorded (serial #s) and ownership determined
Line 214: Line 206:
* lightswitch cover near 48th st door should be replaced with one with less-sharp edges (better-sized)
* lightswitch cover near 48th st door should be replaced with one with less-sharp edges (better-sized)
* weight load for high-up triangular shelves in corners to be assessed (julia) to determine if speakers etc can be placed there
* weight load for high-up triangular shelves in corners to be assessed (julia) to determine if speakers etc can be placed there
== Bocce Room ==
* do better job of affixing & routing low-voltage 'inside wiring' ie all ethernet, phone cabling
=== Sudo ===
* sand down side of basement door so it does not stick closed so bad (belt sander optimal)

Revision as of 20:23, 7 August 2017

stuff in the building to fix

General

Remove all extension cords, replace with conduit or install outlets if necessary ---> still need to install conduit by 48th St entrance

Ballroom

Bar

  • Outlets on east/shattuck-side wall need to be: removed, wire-nutted, wrapped in elec tape, covered with blank faceplates. TURN OFF CIRCUIT FIRST. Note: furthest N outlet not disconnected, only outlet in the center of the wall
  • sink needs to have hole/leak repaired (stainless steel), and possibly re-mounted / re-caulked.
    • Need to remove blue masonite tabletop as it is weighing the sink down! Modify and return as actual cabinetry / surface.

Ballroom-Shattuck Exit Area

  • install light cover into flourescent panel (22"x3') - flourescents are 2x 2' bulbs

Mezzanine

  • SW staircase up: Repair hole in south wall near floor immediately across from stairs (see south wall acoustic treatment)
  • SW & SE staircases: motion detectors up & down
  • SW & SE staircases: LED strip lighting on each side

Mezzanine Bathroom

  • outlet needs to be replaced with GFCI - Note: no ground; Gerald suggests decommissioning and installing new grounded plug in wall just above counter; go into wall from other side, need to locate grounded location
  • all exposed bulb fixtures need be replaced with covered fixtures (2x)

Mezzanine "Book Room"

  • 4"x4" Outlets affixed to top of Electrical subpanel must be removed from subpanel, and affixed to balcony (code violation) (3x)

Crow's Nest

  • Clear everything 3' in front of electrical subpanel including all cords, lighitng, etc --> double check periodically
  • acquire & install cover for light (fixture takes glass orb / cover around bulb, it is missing)
  • extend balcony railing to out in front of balcony hatch - on E side of R&J balcony (building & osha safety)

A/V Room

  • Patch long thinnish strip above door where conduit is exposed.
  • Patch hole near floor in NW corner of this room near door jamb. <--needs another coat but effectively done

Ticketbooth Room

  • Patch small hole in ceiling corner above ticket window where new conduit was run.
  • install new outlet (existing is cracked and not attached to wall

Front Area

  • cover floor sink behind front counter area w minimum 3/4" plywood cut out and sealant (trip hazard/health)
  • build secure mailbox

balcony

TIL

  • cover exposed wires in east wall (near bookshelf). can use a plate
  • get clear cover to put over wall switch for old electric timer in wall in big bookshelf unit in south wall of TL

Basement

  • south wall: close holes in basement wall where opened to remove mold.
  • LibLens room ventilation doesn't work. people can suffocate in there.
  • clear remaining junk

ceiling

  • Acquire & install light fixture covers for the 4' flourescent fixtures in basement offices (bunker rooms) - roughly ~48"x16".
  • install protective bulb covers over remaining working 8' flourescents: 6x
  • replace bare-bulb fixture with covered fixture
  • re-attach and restore service to entire strip of 8' flourescents along west wall (closest to sudo) that had been decommissioned
  • acquire and affix 1'x1' ceiling tiles in NW corner of basement, so lighting fixture & strip of lights can be re-connected. ~120 tiles
  • Cut & attach drywall AND then also affix 1'x1' ceiling tiles to exposed ceiling areas in basement (2 areas)
  • Replace bad ballast in any 8' flourescent fixture (that is not turning on. If not sure try lights in it that do work in another fixture.

Bocce Court

  • hallway: install paper towel dispenser and paper towels
  • entire room perimeter - 5LB ABC fire extinguishers at correct height every ~75' - starting w under each exit sign

Sudo

  • created dedicated space for storing excess lumber (long pieces), pipe, metal pieces, etc so they are not in jumbles (fire code).
  • west wall - run more 3/4" conduit further down west wall. Must know code.

CCL

  • run new conduit / circuits to reduce excessive extension cord usage (fire code)
  • west closet: clean up & seal west wall
  • west closet: put bulb covers over the 2x 4' flourescents
  • west closet: put bulb covers over the 2x 4' flourescents in annex/closet
  • west closet: replace ballast in flourescent fixture in this room
  • east closet: cover exposed octogon junction box in ceiling with appropriate octogon plate
  • east closet: replace exposed wiring from new LED fixture to ceiling with armored flex or EMT

Disco Room

  • light switch cover near 48th street door should be replaced by one with less-sharp edges (better-sized)
  • giant lateral file cabinet needs to be removed / find a better home somewhere JOHN GIVENS TO REMOVE - email photo
  • Trace & label ALL elec outlets in this room
  • A/V instructions need to be made for home stereo / speaker setup, mixer in crows nest etc. in this room
  • West exit door (top landing to 48th st staircase) needs be panic bar'd
  • install closer to main (east) door of disco room
  • install closer to west / emergency exit door of disco room
  • remove or permanently mount ALL LARGE UNMOUNTED PLATE GLASS MIRRORS in this room: safety hazard
  • hole in wall in west staircase down to 48th needs be covered
  • plate to be installed to cover exposed ceiling wires immediately in front of 48th st street door leading up to disco room
  • crow's nest west wall: exposed electrical wires / fixture needs to be covered (and traced)

Phat Beets

  • replaced busted circuit breaker in every electrical panel (like in the 42 breaker panel) with either working breaker or factory blanks.
  • remove 2x6 on ceiling on south side of room (move or cover all PB stuff)






Doors

shattuck-ballroom outer

  • need panic bars

shattuck-ballroom inner

  • needs to be hung, closers, panic bars

cafe-basement (big white door)

  • needs closer
  • fix panic bar

bocce hallway

  • needs rehang, closer, panic bar, lock

bocce-basement

  • if possible, put closer on this door (may not be possible)

bocce-ballroom

  • closer

mezzanine book room

  • Replace door handle with non-locking handle.

crows nest

  • Install real doorknob, remove latch

phat beets

  • replace locking main door to Phat Beets in hallway with twenty minute solid-core (fire-code)
  • put closer on main door to PB

Pink Room

  • to hallway: closer
  • to ballroom: closer








Wishlist

Ballroom Area

  • balance ballroom fans

Bar

  • Determine fix for leaking sink in 3-sink (weld?) - southmost sink (on left if you are behind bar)
  • Install floor sink under 3-sink as per health code

Crow's Nest

  • Make main (east) door to this room better fitting / gasketed against all air gaps so it functions for soundproofing
  • rebalance fan
  • ensure balcony hatch is robust enough to support 300lb standing weight
  • Refinish & airgap-seal east wall above loft in this room so room functions as soundproofing / air barrier to exterior of bldg
  • make north door to romeo & juliet balcony airtight (or better fitting) for turning this room into a soundproofing barrier

Mezzanine Bathroom

  • active ventilation needs to be wired & installed (exhaust) in current ventilation window
  • install door stop so the door can be propped open sometimes.

Stage

  • Create wider storage openings under stage. Not insubstantial. See stage storage build plan.

Ticketbooth Room

  • Install threshold plate to base of jamb (no more than 1/2" high as per ADA) to cut down on sound from ballroom
  • install gaskets to door jambs to cut down on sound.
  • Install door closer

Basement

kitchen

  • Resurface kitchen floor, cover with quarry tile, or seal / treat concrete
  • Fix or replace corroded window frames along shattuck
  • Cut in mop sink in westmost pantry area
  • Acquire and install tankless water heater, check gas line diameter & exhaust ductwork
  • Purchase and affix Class-K extinguisher at correct height
  • Cover exposed wiring in FNB locked-pantry ceiling (with e.g. metal plate)
  • Install Ansul fire-suppression in hood
  • Replace entire 4' flourescent light fixture closest to stove (has 1x broken tube holder)
  • Acquire makeup air into kitchen (remove desk fan from duct, replace with something to code - 95% of hood CFM)
  • Put closers on both basement kitchen doors
  • steam clean stove hood
  • Knock out / expand west kitchen wall to next-west supporting pipe
  • Remove firred-out drywall, cover with FRP

Front Area

  • fix broken glass pane in 4th window west of front door in La Commune

Balcony

  • between fridges: get an exterior outlet plastic cover for 4"x4" outlet box here, so outlets do not get wet if it rains when roof hatch is open
  • ~6" high barrier along balcony (to stop drinks etc from being knocked off onto those in cafe)
  • bathroom: install ceiling exhaust fan

TIL

  • Get clear cover to put over wall switch for old electric timer in wall in big bookshelf unit in south wall of TIL

Disco Room

  • test linoleum for asbestos content
  • remove linoleum (may need to hire certified abatement company if asbestos present)
  • sand wood floor and seal with water based polyurethane
  • all A/V & musical equipment (including in crow's nest) needs to be recorded (serial #s) and ownership determined
  • ensure remaining shelving along north wall of disco room is fixed/affixed more safely
  • pendant lights should probably be raised a bit higher up (low priority)
  • pendant light switch(es): consider replacing with dimmers
  • lightswitch cover near 48th st door should be replaced with one with less-sharp edges (better-sized)
  • weight load for high-up triangular shelves in corners to be assessed (julia) to determine if speakers etc can be placed there