(go through top priority ones) |
(huge group edit) |
||
Line 3: | Line 3: | ||
= Top Priority = | = Top Priority = | ||
== | ==General== | ||
Remove all extension cords, replace with conduit or install outlets if necessary | |||
== Ballroom == | |||
=== Bar === | === Bar === | ||
* Outlets on east/shattuck-side wall need to be: removed, wire-nutted, wrapped in elec tape, covered with blank faceplates. TURN OFF CIRCUIT FIRST. Note: furthest N outlet not disconnected, only outlet in the center of the wall | * Outlets on east/shattuck-side wall need to be: removed, wire-nutted, wrapped in elec tape, covered with blank faceplates. TURN OFF CIRCUIT FIRST. Note: furthest N outlet not disconnected, only outlet in the center of the wall | ||
* sink needs to have hole/leak repaired (stainless steel), and possibly re-mounted / re-caulked. | |||
** Need to remove blue masonite tabletop as it is weighing the sink down! Modify and return as actual cabinetry / surface. | |||
=== Ballroom-Shattuck Exit Area === | === Ballroom-Shattuck Exit Area === | ||
* install light cover into flourescent panel (22"x3') - flourescents are 2x 2' bulbs | * install light cover into flourescent panel (22"x3') - flourescents are 2x 2' bulbs | ||
=== Mezzanine === | === Mezzanine === | ||
* SW staircase up: Repair hole in south wall near floor immediately across from stairs (see south wall acoustic treatment) | * SW staircase up: Repair hole in south wall near floor immediately across from stairs (see south wall acoustic treatment) | ||
* SW & SE staircases: motion detectors up & down | |||
* SW & SE staircases: LED strip lighting on each side | |||
=== Mezzanine Bathroom === | === Mezzanine Bathroom === | ||
* outlet needs to be replaced with GFCI - Note: no ground; Gerald suggests decommissioning and installing new grounded plug in wall just above counter; go into wall from other side, need to locate grounded location | * outlet needs to be replaced with GFCI - Note: no ground; Gerald suggests decommissioning and installing new grounded plug in wall just above counter; go into wall from other side, need to locate grounded location | ||
* all exposed bulb fixtures need be replaced with covered fixtures (2x) | * all exposed bulb fixtures need be replaced with covered fixtures (2x) | ||
* Install paper towell holder | |||
=== Mezzanine "Book Room" === | === Mezzanine "Book Room" === | ||
Line 31: | Line 34: | ||
* acquire & install cover for light (fixture takes glass orb / cover around bulb, it is missing) | * acquire & install cover for light (fixture takes glass orb / cover around bulb, it is missing) | ||
* extend balcony railing to out in front of balcony hatch - on E side of R&J balcony (building & osha safety) | * extend balcony railing to out in front of balcony hatch - on E side of R&J balcony (building & osha safety) | ||
=== A/V Room === | |||
* Patch small hole above door where conduit is peeking through. | |||
* Patch hole near floor in NW corner of this room near door jamb. <--In progress by kkr | |||
=== Ticketbooth Room === | === Ticketbooth Room === | ||
* Patch small hole in ceiling corner above ticket window where new conduit was run. | * Patch small hole in ceiling corner above ticket window where new conduit was run. | ||
* install new outlet (existing is cracked and not attached to wall | |||
* | |||
== Disco Room == | == Disco Room == | ||
* light switch cover near 48th street door should be replaced by one with less-sharp edges (better-sized) | * light switch cover near 48th street door should be replaced by one with less-sharp edges (better-sized) | ||
* giant lateral file cabinet needs to be removed / find a better home somewhere JOHN GIVENS TO REMOVE - email photo | * giant lateral file cabinet needs to be removed / find a better home somewhere JOHN GIVENS TO REMOVE - email photo | ||
* Trace & label ALL elec outlets in this room | * Trace & label ALL elec outlets in this room | ||
Line 56: | Line 58: | ||
== La Commune == | == La Commune == | ||
* | * cover floor sink behind front counter area w minimum 3/4" plywood cut out and sealant (trip hazard/health) | ||
== Rise Above == | == Rise Above == | ||
* replaced busted circuit breaker in every electrial panel (like in the 42 breaker panel) with either working breaker or factory blanks. | * replaced busted circuit breaker in every electrial panel (like in the 42 breaker panel) with either working breaker or factory blanks. | ||
* remove 2x6 on ceiling on south side of room (COORDINATE WITH GABRIELA 1ST - move or cover all her stuff. | * remove 2x6 on ceiling on south side of room (COORDINATE WITH GABRIELA 1ST - move or cover all her stuff. | ||
* stage left - install paper towel dispenser and paper towels. | * stage left - install paper towel dispenser and paper towels. | ||
Line 71: | Line 68: | ||
* hallway: install paper towel dispenser and paper towels | * hallway: install paper towel dispenser and paper towels | ||
* entire room perimeter - 5LB ABC fire extinguishers at correct height every ~75' - starting w under each exit sign | * entire room perimeter - 5LB ABC fire extinguishers at correct height every ~75' - starting w under each exit sign | ||
=== Sudo === | === Sudo === | ||
* created dedicated space for storing excess lumber (long pieces), pipe, metal pieces, etc so they are not in jumbles (fire code). | * created dedicated space for storing excess lumber (long pieces), pipe, metal pieces, etc so they are not in jumbles (fire code). | ||
* west wall - run more 3/4" conduit further down west wall. Must know code. | * west wall - run more 3/4" conduit further down west wall. Must know code. | ||
=== CCL === | === CCL === | ||
* run new conduit / circuits to reduce excessive extension cord usage (fire code) | * run new conduit / circuits to reduce excessive extension cord usage (fire code) | ||
* | * west closet: clean up & seal west wall | ||
* | * west closet: put bulb covers over the 2x 4' flourescents | ||
* | * west closet: put bulb covers over the 2x 4' flourescents in annex/closet | ||
* | * west closet: replace ballast in flourescent fixture in this room | ||
* | * east closet: cover exposed octogon junction box in ceiling with appropriate octogon plate | ||
* east closet: replace exposed wiring from new LED fixture to ceiling with armored flex or EMT | |||
== Front Balcony == | == Front Balcony == | ||
Line 94: | Line 88: | ||
* between fridges: Lock roofer's ladder (that lives b/t fridges in balcony) to wall. | * between fridges: Lock roofer's ladder (that lives b/t fridges in balcony) to wall. | ||
* kitchenette: replace CFL bulb in kitchen with 'safe' LED (silicone-wrapped kind) spot shape - e.g. for food safety if CFL breaks | * kitchenette: replace CFL bulb in kitchen with 'safe' LED (silicone-wrapped kind) spot shape - e.g. for food safety if CFL breaks | ||
=== TIL === | === TIL === | ||
Line 103: | Line 96: | ||
* south wall: close holes in basement wall where opened to remove mold. | * south wall: close holes in basement wall where opened to remove mold. | ||
* Phat Beets room ventilation doesn't work. people can suffocate in there. | * Phat Beets room ventilation doesn't work. people can suffocate in there. | ||
* repair red stage | |||
* clear remaining junk | |||
=== ceiling === | === ceiling === | ||
Line 115: | Line 109: | ||
* Replace bad ballast in any 8' flourescent fixture (that is not turning on. If not sure try lights in it that do work in another fixture. | * Replace bad ballast in any 8' flourescent fixture (that is not turning on. If not sure try lights in it that do work in another fixture. | ||
=== | = Doors = | ||
* | |||
=== shattuck-ballroom outer === | |||
* need panic bars | |||
= | === shattuck-ballroom inner === | ||
* needs to be hung, closers, panic bars | |||
== | === cafe-basement (big white door) === | ||
* needs closer | |||
* fix panic bar | |||
=== | === bocce hallway === | ||
* | * needs rehang, closer, panic bar, lock | ||
=== | === bocce-basement === | ||
* | * if possible, put closer on this door (may not be possible) | ||
=== | === bocce-ballroom === | ||
* | * closer | ||
=== | === mezzanine book room === | ||
* | * Replace door handle with non-locking handle. | ||
=== | === opal === | ||
* Install real doorknob, remove latch | * Install real doorknob, remove latch | ||
=== | === rise above === | ||
* | * replace locking main door to Rise Above in hallway with twenty minute solid-core (fire-code) | ||
* | * replace 2x hollow-core sliding doors with 20 minutes solid-core sliding doors (fire-code) | ||
* | * put closer on main door to Rise Above | ||
== | === Blue Room === | ||
* | * to hallway: closer | ||
* to ballroom: closer | |||
== | = Wishlist = | ||
== | == Ballroom Area == | ||
* balance ballroom fans | |||
=== | === Bar === | ||
* | * Determine fix for leaking sink in 3-sink (weld?) - southmost sink (on left if you are behind bar) | ||
* Install floor sink under 3-sink as per health code | |||
* Install | |||
=== Crow's Nest === | === Crow's Nest === | ||
* Make main (east) door to this room better fitting / gasketed against all air gaps so it functions for soundproofing | * Make main (east) door to this room better fitting / gasketed against all air gaps so it functions for soundproofing | ||
* rebalance fan | * rebalance fan | ||
* ensure balcony hatch is robust enough to support 300lb standing weight | |||
* Refinish & airgap-seal east wall above loft in this room so room functions as soundproofing / air barrier to exterior of bldg | |||
* make north door to romeo & juliet balcony airtight (or better fitting) for turning this room into a soundproofing barrier | |||
=== Mezzanine Bathroom === | === Mezzanine Bathroom === | ||
* active ventilation needs to be wired & installed (exhaust) in current ventilation window | * active ventilation needs to be wired & installed (exhaust) in current ventilation window | ||
* install door stop so the door can be propped open sometimes. | |||
=== Stage === | === Stage === | ||
Line 210: | Line 171: | ||
* Install threshold plate to base of jamb (no more than 1/2" high as per ADA) to cut down on sound from ballroom | * Install threshold plate to base of jamb (no more than 1/2" high as per ADA) to cut down on sound from ballroom | ||
* install gaskets to door jambs to cut down on sound. (icarus) | * install gaskets to door jambs to cut down on sound. (icarus) | ||
* Install door closer | |||
* | |||
== Basement Area == | == Basement Area == | ||
=== | === kitchen === | ||
* Resurface kitchen floor, cover with quarry tile, or seal / treat concrete | |||
* Fix or replace corroded window frames along shattuck | |||
* Cut in mop sink in westmost pantry area | |||
* Acquire and install tankless water heater, check gas line diameter & exhaust ductwork | |||
* Purchase and affix Class-K extinguisher at correct height | |||
* Cover exposed wiring in FNB locked-pantry ceiling (with e.g. metal plate) | |||
* Install Ansul fire-suppression in hood | |||
* Replace entire 4' flourescent light fixture closest to stove (has 1x broken tube holder) | |||
* Acquire makeup air into kitchen (remove desk fan from duct, replace with something to code - 95% of hood CFM) | |||
* Put closers on both basement kitchen doors | |||
* steam clean stove hood | |||
* Knock out / expand west kitchen wall to next-west supporting pipe | * Knock out / expand west kitchen wall to next-west supporting pipe | ||
* Remove firred-out drywall, cover with FRP | * Remove firred-out drywall, cover with FRP | ||
== La Commune == | |||
* fix broken glass pane in 4th window west of front door in La Commune | |||
== Cafe Balcony == | == Cafe Balcony == | ||
* between fridges: get an exterior outlet plastic cover for 4"x4" outlet box here, so outlets do not get wet if it rains when roof hatch is open | * between fridges: get an exterior outlet plastic cover for 4"x4" outlet box here, so outlets do not get wet if it rains when roof hatch is open | ||
* | * ~6" high barrier along balcony (to stop drinks etc from being knocked off onto those in cafe) | ||
* bathroom: install ceiling exhaust fan | |||
* | |||
=== TIL === | === TIL === | ||
Line 246: | Line 212: | ||
* lightswitch cover near 48th st door should be replaced with one with less-sharp edges (better-sized) | * lightswitch cover near 48th st door should be replaced with one with less-sharp edges (better-sized) | ||
* weight load for high-up triangular shelves in corners to be assessed (julia) to determine if speakers etc can be placed there | * weight load for high-up triangular shelves in corners to be assessed (julia) to determine if speakers etc can be placed there | ||
Revision as of 04:24, 25 August 2015
stuff in the building to fix
Top Priority
General
Remove all extension cords, replace with conduit or install outlets if necessary
Ballroom
Bar
- Outlets on east/shattuck-side wall need to be: removed, wire-nutted, wrapped in elec tape, covered with blank faceplates. TURN OFF CIRCUIT FIRST. Note: furthest N outlet not disconnected, only outlet in the center of the wall
- sink needs to have hole/leak repaired (stainless steel), and possibly re-mounted / re-caulked.
- Need to remove blue masonite tabletop as it is weighing the sink down! Modify and return as actual cabinetry / surface.
Ballroom-Shattuck Exit Area
- install light cover into flourescent panel (22"x3') - flourescents are 2x 2' bulbs
Mezzanine
- SW staircase up: Repair hole in south wall near floor immediately across from stairs (see south wall acoustic treatment)
- SW & SE staircases: motion detectors up & down
- SW & SE staircases: LED strip lighting on each side
Mezzanine Bathroom
- outlet needs to be replaced with GFCI - Note: no ground; Gerald suggests decommissioning and installing new grounded plug in wall just above counter; go into wall from other side, need to locate grounded location
- all exposed bulb fixtures need be replaced with covered fixtures (2x)
- Install paper towell holder
Mezzanine "Book Room"
- 4"x4" Outlets affixed to top of Electrical subpanel must be removed from subpanel, and affixed to balcony (code violation) (3x)
Crow's Nest
- Clear everything 3' in front of electrical subpanel including all cords, lighitng, etc
- acquire & install cover for light (fixture takes glass orb / cover around bulb, it is missing)
- extend balcony railing to out in front of balcony hatch - on E side of R&J balcony (building & osha safety)
A/V Room
- Patch small hole above door where conduit is peeking through.
- Patch hole near floor in NW corner of this room near door jamb. <--In progress by kkr
Ticketbooth Room
- Patch small hole in ceiling corner above ticket window where new conduit was run.
- install new outlet (existing is cracked and not attached to wall
Disco Room
- light switch cover near 48th street door should be replaced by one with less-sharp edges (better-sized)
- giant lateral file cabinet needs to be removed / find a better home somewhere JOHN GIVENS TO REMOVE - email photo
- Trace & label ALL elec outlets in this room
- A/V instructions need to be made for home stereo / speaker setup, mixer in crows nest etc. in this room
- West exit door (top landing to 48th st staircase) needs be panic bar'd
- install closer to main (east) door of disco room
- install closer to west / emergency exit door of disco room
- remove or permanently mount ALL LARGE UNMOUNTED PLATE GLASS MIRRORS in this room: safety hazard
- hole in wall in west staircase down to 48th needs be covered
- plate to be installed to cover exposed ceiling wires immediately in front of 48th st street door leading up to disco room
- crow's nest: giant hole in crows nest west wall needs to be a) filled with insulation b) covered (drywall etc)
- crow's nest west wall: exposed electrical wires / fixture needs to be covered (and traced)
La Commune
- cover floor sink behind front counter area w minimum 3/4" plywood cut out and sealant (trip hazard/health)
Rise Above
- replaced busted circuit breaker in every electrial panel (like in the 42 breaker panel) with either working breaker or factory blanks.
- remove 2x6 on ceiling on south side of room (COORDINATE WITH GABRIELA 1ST - move or cover all her stuff.
- stage left - install paper towel dispenser and paper towels.
Bocce Room
- hallway: install paper towel dispenser and paper towels
- entire room perimeter - 5LB ABC fire extinguishers at correct height every ~75' - starting w under each exit sign
Sudo
- created dedicated space for storing excess lumber (long pieces), pipe, metal pieces, etc so they are not in jumbles (fire code).
- west wall - run more 3/4" conduit further down west wall. Must know code.
CCL
- run new conduit / circuits to reduce excessive extension cord usage (fire code)
- west closet: clean up & seal west wall
- west closet: put bulb covers over the 2x 4' flourescents
- west closet: put bulb covers over the 2x 4' flourescents in annex/closet
- west closet: replace ballast in flourescent fixture in this room
- east closet: cover exposed octogon junction box in ceiling with appropriate octogon plate
- east closet: replace exposed wiring from new LED fixture to ceiling with armored flex or EMT
Front Balcony
- 4'x2' light fixture panel cover
- install paper towel dispenser and paper towels
- bathroom: Replace light fixture (sub-8') with standard caged bell-jar type
- between fridges: Lock roofer's ladder (that lives b/t fridges in balcony) to wall.
- kitchenette: replace CFL bulb in kitchen with 'safe' LED (silicone-wrapped kind) spot shape - e.g. for food safety if CFL breaks
TIL
- cover exposed wires in east wall (near bookshelf). can use a plate
- get clear cover to put over wall switch for old electric timer in wall in big bookshelf unit in south wall of TL
Basement
- south wall: close holes in basement wall where opened to remove mold.
- Phat Beets room ventilation doesn't work. people can suffocate in there.
- repair red stage
- clear remaining junk
ceiling
- Acquire & install light fixture covers for the 4' flourescent fixtures in basement offices (bunker rooms) - roughly ~48"x16".
- install protective bulb covers over remaining working 8' flourescents: 6x
- unscrew piece of broken lightbulb from East basement hallway, replace bare-bulb fixture with covered fixture
- re-attach and restore service to entire strip of 8' flourescents along west wall (closest to sudo) that had been decommissioned
- acquire and affix 1'x1' ceiling tiles in NW corner of basement, so lighting fixture & strip of lights can be re-connected. ~120 tiles
- Cut & attach drywall AND then also affix 1'x1' ceiling tiles to exposed ceiling areas in basement (2 areas)
- Replace bad ballast in any 8' flourescent fixture (that is not turning on. If not sure try lights in it that do work in another fixture.
Doors
shattuck-ballroom outer
- need panic bars
shattuck-ballroom inner
- needs to be hung, closers, panic bars
cafe-basement (big white door)
- needs closer
- fix panic bar
bocce hallway
- needs rehang, closer, panic bar, lock
bocce-basement
- if possible, put closer on this door (may not be possible)
bocce-ballroom
- closer
mezzanine book room
- Replace door handle with non-locking handle.
opal
- Install real doorknob, remove latch
rise above
- replace locking main door to Rise Above in hallway with twenty minute solid-core (fire-code)
- replace 2x hollow-core sliding doors with 20 minutes solid-core sliding doors (fire-code)
- put closer on main door to Rise Above
Blue Room
- to hallway: closer
- to ballroom: closer
Wishlist
Ballroom Area
- balance ballroom fans
Bar
- Determine fix for leaking sink in 3-sink (weld?) - southmost sink (on left if you are behind bar)
- Install floor sink under 3-sink as per health code
Crow's Nest
- Make main (east) door to this room better fitting / gasketed against all air gaps so it functions for soundproofing
- rebalance fan
- ensure balcony hatch is robust enough to support 300lb standing weight
- Refinish & airgap-seal east wall above loft in this room so room functions as soundproofing / air barrier to exterior of bldg
- make north door to romeo & juliet balcony airtight (or better fitting) for turning this room into a soundproofing barrier
Mezzanine Bathroom
- active ventilation needs to be wired & installed (exhaust) in current ventilation window
- install door stop so the door can be propped open sometimes.
Stage
- Create wider storage openings under stage. Not insubstantial. See stage storage build plan.
Ticketbooth Room
- Install threshold plate to base of jamb (no more than 1/2" high as per ADA) to cut down on sound from ballroom
- install gaskets to door jambs to cut down on sound. (icarus)
- Install door closer
Basement Area
kitchen
- Resurface kitchen floor, cover with quarry tile, or seal / treat concrete
- Fix or replace corroded window frames along shattuck
- Cut in mop sink in westmost pantry area
- Acquire and install tankless water heater, check gas line diameter & exhaust ductwork
- Purchase and affix Class-K extinguisher at correct height
- Cover exposed wiring in FNB locked-pantry ceiling (with e.g. metal plate)
- Install Ansul fire-suppression in hood
- Replace entire 4' flourescent light fixture closest to stove (has 1x broken tube holder)
- Acquire makeup air into kitchen (remove desk fan from duct, replace with something to code - 95% of hood CFM)
- Put closers on both basement kitchen doors
- steam clean stove hood
- Knock out / expand west kitchen wall to next-west supporting pipe
- Remove firred-out drywall, cover with FRP
La Commune
- fix broken glass pane in 4th window west of front door in La Commune
Cafe Balcony
- between fridges: get an exterior outlet plastic cover for 4"x4" outlet box here, so outlets do not get wet if it rains when roof hatch is open
- ~6" high barrier along balcony (to stop drinks etc from being knocked off onto those in cafe)
- bathroom: install ceiling exhaust fan
TIL
- Get clear cover to put over wall switch for old electric timer in wall in big bookshelf unit in south wall of TIL
Disco Room
- test linoleum for asbestos content
- remove linoleum (may need to hire certified abatement company if asbestos present)
- sand wood floor and seal with water based polyurethane
- all A/V & musical equipment (including in crow's nest) needs to be recorded (serial #s) and ownership determined
- ensure remaining shelving along north wall of disco room is fixed/affixed more safely
- pendant lights should probably be raised a bit higher up (low priority)
- pendant light switch(es): consider replacing with dimmers
- lightswitch cover near 48th st door should be replaced with one with less-sharp edges (better-sized)
- weight load for high-up triangular shelves in corners to be assessed (julia) to determine if speakers etc can be placed there