Difference between revisions of "Event:2023/02/19 Building"
Andrewrgross (talk | contribs) (Created page) |
Andrewrgross (talk | contribs) |
||
Line 1: | Line 1: | ||
Omni Building Working Group meeting | == Omni Building Working Group meeting - February 19, 2023 == | ||
February 19, 2023 | |||
'''Attendance:''' | |||
Silver | Silver | ||
Yar | Yar | ||
Line 11: | Line 11: | ||
Iara | Iara | ||
'''Introductions: This meeting is to get things rolling.''' | |||
Yar: A long time contributor seeking balance and boundaries. | Yar: A long time contributor seeking balance and boundaries. |
Latest revision as of 05:08, 21 February 2023
Omni Building Working Group meeting - February 19, 2023
Attendance:
Silver Yar Andy Ruby Dan Iara
Introductions: This meeting is to get things rolling.
Yar: A long time contributor seeking balance and boundaries.
Andy: Excited to contribute to the organization, and interested in building processes that allow for comfortable, bounded contributions and productive outcomes.
Ruby: Looking to help with building projects
Dan: Known the space a long time and looking to come back to it. A plumber looking to help and support. Lives in San Francisco.
Iara: Knows the place through events and looking to get more involved. Some experience in plumbing. A DIYer.
Andrew explains his impression from being a member of Sudo Room.
Silver: Main communication channels are Slack and email working group.
Harvin arrived.
Toured the building reviewing tasks. Ruby took notes (to be added separately)
Wrapping up:
Andy: Proposed making the third Sunday of each month at 3 PM our standard meeting time
Adopted
Andy: Suggested establishing a process for getting consent for irreversable action: Get buy-in from one person, and announce it on Slack and/or email and give folks 72 hours of notice in which to ask questions or suggest alternative approach.
Concluded, 1639.
Addendum: Project list
• names on doors • Two upstairs office spaces - Chiapas community support groups • Global women’s strike + Chiapas support community - room has current BAD rat problem - where the base board is missing, which is everywhere in here, that’s where they’re coming in - Harvin has offered to help with this issue • Roof - white stuff helps with leaks, skylights needed - whole roof needs to get redone, completely - currently there’s water pooling in lots of areas • Scammed for windows -10k - old skylights were removed, currently covered in plywood, glass windows must be removed because they’re not the right size • New internet connection! • The biggest roof problem, should drain, but roof has dropped so more water pools near the edge - this is above the meeting area • There is a plan to drill a hole into the building to let the water drain, at least - Jake is in charge of this project, might work on it Tuesday • On 48th st side of roof, or northeast corner - water falls off roof and pools onto the sidewalk, not great but it’s a low priority issue • We should really put sandbags on the ladder to the roof to add security • Always remember to close the hatch to the roof -sign • Laminated version of the sign on the ladder • Cockroach infested small kitchen upstairs - later convo • Little holes everywhere that let in miss and rodents • Dan has offered to fix the clog in the shower up here • Stairs are noisy, Harvin has offered to fix them, plus the holes, and replace base boards • Downstairs, at the free store - everything is un level - stuff needs to be taken out to work on the floor - idea is to cover in concrete and be level with the drains - we want the smoothest concrete possible • Bathroom downstairs does not quite flush right - vintage issue? - only one toilet fit, the smallest they could find - Dan the plumber has not seen a toilet like that - maybe get a new one, but why did we need to get such a short one? • Bathroom by the pseudo group - clear it out, make it a usable bathroom • Talk to Jake about electric outlet by pseudo room • Maker room - laser cutter, ladder fits under stage in the ballroom, at a diagonal, air blower at the window • The south west basement - light fixture does not work - hopefully we will have the stuff gone soon - also there’s an electric area that needs refinishing as well, it has gravel and soil? Has a rat tunnel - should be done, maybe with concrete? • If you want to make a permanent adjustment to the building How many people are in the working group - endorsing • • • we would like a way for people to submit issues that the building has