Difference between revisions of "Omni-readiness"
Jump to navigation
Jump to search
Mattsenate (talk | contribs) (→Basement: adds library section) |
Mattsenate (talk | contribs) (→Ballroom: adds art to ballroom task) |
||
Line 35: | Line 35: | ||
* [https://omnicommons.org/wiki/Ballroom-readiness#Storage Storage] | * [https://omnicommons.org/wiki/Ballroom-readiness#Storage Storage] | ||
* [https://omnicommons.org/wiki/Ballroom-readiness#Organization_.28everything_needs_to_be_put_away_in_a_place_it_lives.29 Organization (everything needs to be put away in a place it lives)] | * [https://omnicommons.org/wiki/Ballroom-readiness#Organization_.28everything_needs_to_be_put_away_in_a_place_it_lives.29 Organization (everything needs to be put away in a place it lives)] | ||
* Hang art, especially on South Wall (downstairs, ballroom) via Contemporary Art Museum of Oakland (CAMO). | |||
===A/V and Stage Production=== | ===A/V and Stage Production=== |
Revision as of 08:39, 20 January 2015
This page exists as a living checklist for all the tasks we need to get done for Omni to be "ready" ;)
Once a task is completed:
It should be crossed out- Incomplete tasks are not crossed out yet!
Enjoy.
Ballroom
See full documentation on Ballroom-readiness page.
Code-compliance
- Electrical
- Doors
- Drywall
- Fire Extinguishers
- Soundproofing:
- New soundproofing (major): Removable skylight covers: fabricated, hauled up to & installed on roof. Also will allow for daytime film screenings / daytime darkness in ballroom.
- New soundproofing (minor): Finish moving bookshelves & library from basement and install to south wall of ballroom (floor & mezzanine).
- Fixes & improvements necessary for existing Shattuck-facing soundproofing (window baffles):
- Basement
Cosmetic Work
- Painting
- Fixture covers
- Storage
- Organization (everything needs to be put away in a place it lives)
- Hang art, especially on South Wall (downstairs, ballroom) via Contemporary Art Museum of Oakland (CAMO).
A/V and Stage Production
Basement
(kitchen + fnb + mpm + baps + bhc + omp + ?)
Kitchen
- Expand walls
- Seal off pantry (give to black hole collective labs)
- Install dish washer
- Finish fixing up stoves & overhead
- Build closet for mop sink and water heater
- Coat / seal floor
Library
- Move all shelves and books up into the ballroom
Bocce Ball Court
(sudo + ccl)
La Commune
Mezzanine
(til + tiny-room + den + kitchenette + shower + bathroom)
Disco Room
Rise Above
Bike Kitchen
Walk-in Freezer
Omni - Throughout
Hallways and Thoroughfares
Questions
- Do all doors need to be lockable? Do any need to be electrified? Why? No ballrom doors are primary access, right?