Line 46: | Line 46: | ||
==Basement== | ==Basement== | ||
(kitchen + fnb + mpm + baps + bhc + omp + ?) | (kitchen + fnb + mpm + baps + bhc + omp + ?) | ||
* Replace all missing fire insulation ceiling tiles | |||
* Tie up loose ends, any hanging fixtures, trim, etc needs to be re-affixed. | |||
===Kitchen=== | ===Kitchen=== | ||
Line 58: | Line 61: | ||
===Library=== | ===Library=== | ||
* Move all shelves and books up into the ballroom | * Move all shelves and books up into the ballroom | ||
===Print Shop=== | |||
* Preliminary ventilation (check existing vents) | |||
** They're currently using non-toxic (green) solvents, low-odor, low-impact | |||
* Extensive ventilation for future printing purposes | |||
** For operating the offset printing press (later). | |||
* ADA accessibility for walkways. | |||
* Safety demarcations for presses, etc | |||
* Keep back entrance to sudo clear. | |||
* Lighting improvements | |||
* Electrical audit | |||
===Middle Rooms=== | |||
* Inspect past water leakages, damage | |||
* Sound-proofing | |||
* Electrical audit | |||
* | |||
=== Basement General === | |||
* Needs electrical outlets very badly (e.g. for meeting space) | |||
===Blackhole Labs=== | |||
* Walls, doors | |||
* Insulation | |||
* HVAC, especially for ventilation | |||
* Repurposing of raised platform? | |||
* Electrical audit | |||
==Bocce Ball Court== | ==Bocce Ball Court== |
Revision as of 23:31, 8 February 2015
This page exists as a living checklist for all the tasks we need to get done for Omni to be "ready" ;)
Once a task is completed:
It should be crossed out- Incomplete tasks are not crossed out yet!
Enjoy.
Ballroom
See full documentation on Ballroom-readiness page.
Code-compliance
- Electrical
- Doors
- Drywall
- Remaining holes needing to be patched:
- See "Soundproofing" below as well, namely the South Wall needs an extra layer of drywall with acoustic glue.
- Fire Extinguishers
- Soundproofing:
- New soundproofing (major): Removable skylight covers: fabricated, hauled up to & installed on roof. Also will allow for daytime film screenings / daytime darkness in ballroom.
- New soundproofing (minor): Finish moving bookshelves & library from basement and install to south wall of ballroom (floor & mezzanine).
- Fixes & improvements necessary for existing Shattuck-facing soundproofing (window baffles):
- Basement
Cosmetic Work
- Painting
- Fixture covers
- Storage
- Organization (everything needs to be put away in a place it lives)
- Hang art, especially on South Wall (downstairs, ballroom) via Contemporary Art Museum of Oakland (CAMO).
A/V and Stage Production
Basement
(kitchen + fnb + mpm + baps + bhc + omp + ?)
- Replace all missing fire insulation ceiling tiles
- Tie up loose ends, any hanging fixtures, trim, etc needs to be re-affixed.
Kitchen
- Expand walls
- Seal off pantry (give to black hole collective labs)
- Install dish washer
- Finish fixing up stoves & overhead
- Build closet for mop sink and water heater
- Coat / seal floor
Library
- Move all shelves and books up into the ballroom
Print Shop
- Preliminary ventilation (check existing vents)
- They're currently using non-toxic (green) solvents, low-odor, low-impact
- Extensive ventilation for future printing purposes
- For operating the offset printing press (later).
- ADA accessibility for walkways.
- Safety demarcations for presses, etc
- Keep back entrance to sudo clear.
- Lighting improvements
- Electrical audit
Middle Rooms
- Inspect past water leakages, damage
- Sound-proofing
- Electrical audit
Basement General
- Needs electrical outlets very badly (e.g. for meeting space)
Blackhole Labs
- Walls, doors
- Insulation
- HVAC, especially for ventilation
- Repurposing of raised platform?
- Electrical audit
Bocce Ball Court
(sudo + ccl)
La Commune
Mezzanine
(til + tiny-room + den + kitchenette + shower + bathroom)
Disco Room
Rise Above
Bike Kitchen
Walk-in Freezer
Omni - Throughout
- Implement new / upgraded trash system (Jenny)
Hallways and Thoroughfares
- Remove trash cans, store somewhere not in path of travel
- Make tape-based paths for unclear areas to maintain accessible paths free from clutter.
Questions
- Do all doors need to be lockable? Do any need to be electrified? Why? No ballrom doors are primary access, right?