Difference between revisions of "Electrical"
Jump to navigation
Jump to search
Mattsenate (talk | contribs) (updates scheme) |
(→System) |
||
Line 3: | Line 3: | ||
==System== | ==System== | ||
* Label the main electrical panel as '''" | * Label the main electrical panel as '''"MAIN"''' | ||
* Label the direct sub-panels of the main panel with a letter, e.g. '''"A"''', '''"B"'''. | * Label the direct sub-panels of the main panel with a letter, e.g. '''"A"''', '''"B"'''. | ||
* Label each sub-panel that is connected to a first-tier sub-panel of the main panel. | * Label each sub-panel that is connected to a first-tier sub-panel of the main panel. |
Revision as of 06:57, 24 February 2015
Any building's electrical system is intended to serve the needs of the users of the building in a safe manner. However, we must work within constraints such as for our geography, regulations, best practices, and most importantly, the system we employ below:
System
- Label the main electrical panel as "MAIN"
- Label the direct sub-panels of the main panel with a letter, e.g. "A", "B".
- Label each sub-panel that is connected to a first-tier sub-panel of the main panel.
- "origin panel letter" + "sub-panel letter" + ... (for each sub-panel add another letter) ...
- e.g. "AA" for the first sub-panel from panel "A"
- e.g. "AAB" for the second sub-panel attached to panel "AA"
- "origin panel letter" + "sub-panel letter" + ... (for each sub-panel add another letter) ...
- For each circuit, label each outlet, switch, and load with:
- the appropriate sub-panel name (described above) + "breaker number"
- e.g. All the outlets in one room that are on the same circuit should be labeled "CA4" meaning the circuit is on breaker 4 on panel CA, which is the first panel originating from panel C that connects to the Main panel.
- the draw on the curcuit
- e.g. 20 amps
- the appropriate sub-panel name (described above) + "breaker number"
Protocol
- We are especially (not exclusively) updating our electrical system documentation on a room-by-room basis.
- As we do audits and work on individual rooms, you should only use the system described above to map the electrical system as it is discovered.
- All other systems will be overridden.
- You can print this page and the building floorplan below in order to document the labeling you make on the actual outlets, panels, etc:
- After labeling and writing on the printed building floorplan, deliver it to the Building Working Group.