Difference between revisions of "ToFix"

From Omni Commons
Jump to navigation Jump to search
(went over 2 & 3 on the list, categorized by priority)
(go through top priority ones)
Line 4: Line 4:


== Ballroom Area ==
== Ballroom Area ==
* stage left: install paper towel dispenser and paper towels


=== Bar ===
=== Bar ===
Line 34: Line 35:
* Remove giant bookshelf and all debris/material from this room. Call Emerson - ask them to get their table back, or are they donating to us ? :)
* Remove giant bookshelf and all debris/material from this room. Call Emerson - ask them to get their table back, or are they donating to us ? :)
* Patch small hole in ceiling corner above ticket window where new conduit was run.  
* Patch small hole in ceiling corner above ticket window where new conduit was run.  
=== Blue Room ===
* Install closer to Blue Room door that opens onto hallway
* Install closer to Blue Room door that opens onto Ballroom Bar


== Disco Room ==
== Disco Room ==
* light switch cover near 48th street door should be replaced by one with less-sharp edges (better-sized)
* light switch cover near 48th street door should be replaced by one with less-sharp edges (better-sized)
* weight load for high triangular shelves in corners to be assessed (julia) to determine if speakers etc can be placed there
* weight load for high triangular shelves in corners to be assessed (julia) to determine if speakers etc can be placed there
* giant lateral file cabinet needs to be removed / find a better home somewhere JOHN GIVENS TO REMOVE - email photo
* Trace & label ALL elec outlets in this room
* A/V instructions need to be made for home stereo / speaker setup, mixer in crows nest etc. in this room
* West exit door (top landing to 48th st staircase) needs be panic bar'd
* install closer to main (east) door of disco room
* install closer to west / emergency exit door of disco room
* remove or permanently mount ALL LARGE UNMOUNTED PLATE GLASS MIRRORS in this room: safety hazard
* hole in wall in west staircase down to 48th needs be covered
* plate to be installed to cover exposed ceiling wires immediately in front of 48th st street door leading up to disco room
* crow's nest: giant hole in crows nest west wall needs to be a) filled with insulation b) covered (drywall etc)
* crow's nest west wall: exposed electrical wires / fixture needs to be covered (and traced)


== La Commune ==  
== La Commune ==  
Line 52: Line 68:
* stage left - install paper towel dispenser and paper towels.
* stage left - install paper towel dispenser and paper towels.


==  Sudo ==
== Bocce Room ==
* hallway: install paper towel dispenser and paper towels
* entire room perimeter - 5LB ABC fire extinguishers at correct height every ~75' - starting w under each exit sign
* hallway door - install panic hardware & lock to this door
* hallway door - install closer to door
 
===  Sudo ===
* created dedicated space for storing excess lumber (long pieces), pipe, metal pieces, etc so they are not in jumbles (fire code).
* created dedicated space for storing excess lumber (long pieces), pipe, metal pieces, etc so they are not in jumbles (fire code).
* west wall - run more 3/4" conduit further down west wall. Must know code.
* west wall - run more 3/4" conduit further down west wall. Must know code.
== Sudo/CCL ==
* ballroom door - put closer on this door
* ballroom door - put closer on this door
* basement door - if possible, put closer on this door (may not be possible)
* basement door - if possible, put closer on this door (may not be possible)
* entire room perimeter - 5LB ABC fire extinguishers at correct height every ~75' - starting w under each exit sign
* hallway door - install panic hardware & lock to this door
* hallway door - install closer to door
* ticket booth room - install new outlet (existing is cracked and not attached to wall)


== TIL (TI) ==
=== CCL ===
* run new conduit / circuits to reduce excessive extension cord usage (fire code)
* left/west storage: put bulb covers over the 2x 4' flourescents
* left/west storage: put bulb covers over the 2x 4' flourescents in annex/closet
* left/west storage: replace ballast in flourescent fixture in this room
* right/east storage: cover exposed octogon junction box in ceiling with appropriate octogon plate
* right/east storage: replace exposed wiring from new LED fixture to ceiling with armored flex or EMT
 
== Front Balcony ==
* 4'x2' light fixture panel cover
* install paper towel dispenser and paper towels
* bathroom: Replace light fixture (sub-8') with standard caged bell-jar type
* between fridges: Lock roofer's ladder (that lives b/t fridges in balcony) to wall.
* kitchenette: replace CFL bulb in kitchen with 'safe' LED (silicone-wrapped kind) spot shape - e.g. for food safety if CFL breaks
* ~6" high barrier along balcony (to stop drinks etc from being knocked off onto those in cafe)
 
=== TIL ===
* cover exposed wires in east wall (near bookshelf). can use a plate
* cover exposed wires in east wall (near bookshelf). can use a plate
* get clear cover to put over wall switch for old electric timer in wall in big bookshelf unit in south wall of TL
* get clear cover to put over wall switch for old electric timer in wall in big bookshelf unit in south wall of TL

Revision as of 16:50, 22 August 2015

stuff in the building to fix

Top Priority

Ballroom Area

  • stage left: install paper towel dispenser and paper towels

Bar

  • soffet-mounted ceiling light fixtures need: lightbulbs tested / replaced if necc
  • Put up ABC signage req. for pub or private parties w/ alcohol re: cancer/pregnancy warning
  • Outlets on east/shattuck-side wall need to be: removed, wire-nutted, wrapped in elec tape, covered with blank faceplates. TURN OFF CIRCUIT FIRST. Note: furthest N outlet not disconnected, only outlet in the center of the wall

Ballroom-Shattuck Exit Area

  • install closers to both inner doors.
  • install panic bars to both inner doors.
  • install panic bars to both outer doors.
  • install light cover into flourescent panel (22"x3') - flourescents are 2x 2' bulbs

Mezzanine

  • SW staircase up: Repair hole in south wall near floor immediately across from stairs (see south wall acoustic treatment)

Mezzanine Bathroom

  • outlet needs to be replaced with GFCI - Note: no ground; Gerald suggests decommissioning and installing new grounded plug in wall just above counter; go into wall from other side, need to locate grounded location
  • all exposed bulb fixtures need be replaced with covered fixtures (2x)

Mezzanine "Book Room"

  • 4"x4" Outlets affixed to top of Electrical subpanel must be removed from subpanel, and affixed to balcony (code violation) (3x)

Crow's Nest

  • Clear everything 3' in front of electrical subpanel including all cords, lighitng, etc
  • acquire & install cover for light (fixture takes glass orb / cover around bulb, it is missing)
  • extend balcony railing to out in front of balcony hatch - on E side of R&J balcony (building & osha safety)

Ticketbooth Room

  • Remove giant bookshelf and all debris/material from this room. Call Emerson - ask them to get their table back, or are they donating to us ? :)
  • Patch small hole in ceiling corner above ticket window where new conduit was run.

Blue Room

  • Install closer to Blue Room door that opens onto hallway
  • Install closer to Blue Room door that opens onto Ballroom Bar

Disco Room

  • light switch cover near 48th street door should be replaced by one with less-sharp edges (better-sized)
  • weight load for high triangular shelves in corners to be assessed (julia) to determine if speakers etc can be placed there
  • giant lateral file cabinet needs to be removed / find a better home somewhere JOHN GIVENS TO REMOVE - email photo
  • Trace & label ALL elec outlets in this room
  • A/V instructions need to be made for home stereo / speaker setup, mixer in crows nest etc. in this room
  • West exit door (top landing to 48th st staircase) needs be panic bar'd
  • install closer to main (east) door of disco room
  • install closer to west / emergency exit door of disco room
  • remove or permanently mount ALL LARGE UNMOUNTED PLATE GLASS MIRRORS in this room: safety hazard
  • hole in wall in west staircase down to 48th needs be covered
  • plate to be installed to cover exposed ceiling wires immediately in front of 48th st street door leading up to disco room
  • crow's nest: giant hole in crows nest west wall needs to be a) filled with insulation b) covered (drywall etc)
  • crow's nest west wall: exposed electrical wires / fixture needs to be covered (and traced)

La Commune

  • install closer to basement stairs door
  • replace all low uncover lights near entrance w cover lights x3
  • locked storage - unplug and store all extension cords

Rise Above

  • replace locking main door to Rise Above in hallway with twenty minute solid-core (fire-code)
  • replace 2x hollow-core sliding doors with 20 minutes solid-core sliding doors (fire-code)
  • replaced busted circuit breaker in every electrial panel (like in the 42 breaker panel) with either working breaker or factory blanks.
  • put closer on main door to Rise Above
  • remove 2x6 on ceiling on south side of room (COORDINATE WITH GABRIELA 1ST - move or cover all her stuff.
  • stage left - install paper towel dispenser and paper towels.

Bocce Room

  • hallway: install paper towel dispenser and paper towels
  • entire room perimeter - 5LB ABC fire extinguishers at correct height every ~75' - starting w under each exit sign
  • hallway door - install panic hardware & lock to this door
  • hallway door - install closer to door

Sudo

  • created dedicated space for storing excess lumber (long pieces), pipe, metal pieces, etc so they are not in jumbles (fire code).
  • west wall - run more 3/4" conduit further down west wall. Must know code.
  • ballroom door - put closer on this door
  • basement door - if possible, put closer on this door (may not be possible)

CCL

  • run new conduit / circuits to reduce excessive extension cord usage (fire code)
  • left/west storage: put bulb covers over the 2x 4' flourescents
  • left/west storage: put bulb covers over the 2x 4' flourescents in annex/closet
  • left/west storage: replace ballast in flourescent fixture in this room
  • right/east storage: cover exposed octogon junction box in ceiling with appropriate octogon plate
  • right/east storage: replace exposed wiring from new LED fixture to ceiling with armored flex or EMT

Front Balcony

  • 4'x2' light fixture panel cover
  • install paper towel dispenser and paper towels
  • bathroom: Replace light fixture (sub-8') with standard caged bell-jar type
  • between fridges: Lock roofer's ladder (that lives b/t fridges in balcony) to wall.
  • kitchenette: replace CFL bulb in kitchen with 'safe' LED (silicone-wrapped kind) spot shape - e.g. for food safety if CFL breaks
  • ~6" high barrier along balcony (to stop drinks etc from being knocked off onto those in cafe)

TIL

  • cover exposed wires in east wall (near bookshelf). can use a plate
  • get clear cover to put over wall switch for old electric timer in wall in big bookshelf unit in south wall of TL

Basement

  • south wall: close holes in basement wall where opened to remove mold.
  • identify stuff in bunker rooms & hallway: what is Phat Beets, Black Holes, what is junk/unclaimed?
  • Phat Beets room ventilation doesn't work. people can suffocate in there.

ceiling

  • Acquire & install light fixture covers for the 4' flourescent fixtures in basement offices (bunker rooms) - roughly ~48"x16".
  • install protective bulb covers over remaining working 8' flourescents: 6x
  • unscrew piece of broken lightbulb from East basement hallway, replace bare-bulb fixture with covered fixture
  • re-attach and restore service to entire strip of 8' flourescents along west wall (closest to sudo) that had been decommissioned
  • acquire and affix 1'x1' ceiling tiles in NW corner of basement, so lighting fixture & strip of lights can be re-connected. ~120 tiles
  • Cut & attach drywall AND then also affix 1'x1' ceiling tiles to exposed ceiling areas in basement (2 areas)
  • Replace bad ballast in any 8' flourescent fixture (that is not turning on. If not sure try lights in it that do work in another fixture.

kitchen

  • Purchase and affix Class-K extinguisher at correct height
  • Cover exposed wiring in FNB locked-pantry ceiling (with e.g. metal plate)
  • Install Ansul fire-suppression in hood
  • Replace entire 4' flourescent light fixture closest to stove (has 1x broken tube holder)
  • Acquire makeup air into kitchen (remove desk fan from duct, replace with something to code - 95% of hood CFM)
  • Put closers on both basement kitchen doors
  • steam clean stove hood

Medium Priority

Ballroom Area

Bar

  • Determine fix for leaking sink in 3-sink (weld?) - southmost sink (on left if you are behind bar)
  • Install floor sink under 3-sink as per health code

Ticketbooth Room

  • Install closer to Ticketbooth room door (pref. good kind with long close time for wheelchair)
  • install new outlet (existing is cracked and not attached to wall

A/V Room

  • Patch small hole above door where conduit is peeking through.
  • Patch hole near floor in NW corner of this room near door jamb. <--In progress by kkr

Mezzanine

  • SE staircase: Install new led strip lighting on ea. side of stair to replace dead lighting strips
  • SW staircase up: motion detector installed onto light fixture.
  • SW staircase down: motion detector installed onto light fixture.
  • SW staircase up: Install new led strip lighting on ea. side of stair to replace dead lighting strips
  • SW staircase up: Determination if 3-way switch needs to be installed at top of stair. Currently there is only a switch at bottom landing.

Crow's Nest

  • Refinish & airgap-seal east wall above loft in this room so room functions as soundproofing / air barrier to exterior of bldg
  • Install real doorknob, remove latch
  • make north door to romeo & juliet balcony airtight (or better fitting) for turning this room into a soundproofing barrier
  • Install closer to main (east) door
  • Install closer to north / balcony door
  • ensure balcony hatch is robust enough to support 300lb standing weight

Mezzanine "Book Room"

  • Electrical subpanel needs be moved to plywood wall south of panel, onto drywall, 2' from ground.
  • 3-way switch wiring (for chandelier) inside subpanel needs to be removed and placed elsewhere as not ok in-panel.
  • Install closer to Mezzanine room door

Basement Area

  • west wall: re-connect or newly connect toggle switch to basement ventilation fan in basement. Currently breakers turn it on.

kitchen

  • Resurface kitchen floor, cover with quarry tile
  • Fix or replace corroded window frames along shattuck
  • Cut in mop sink in westmost pantry area
  • Acquire and install tankless water heater, check gas line diameter & exhaust ductwork

Cafe Balcony

bathroom

  • Install closer to bathroom door.

kitchenette

  • remove outlets & install blank plate in 4xoutlet area underneath counter on north side, near doorway

shower room

  • Rekey/install lock to balcony shower room
  • Install closer to shower room door

Bocce Room

  • left (west) CCL storage: make plywood plate to cover / inset over exposed ejector pump sticking out under wall

Disco Room

  • 4th window from main door as a broken pane
  • 5th window from main door the window frame rub against the wall on E side

La Commune

  • cover floor sink behind front counter area w minimum 3/4" plywood cut out and sealant (trip hazard/health)
  • fix broken glass pane in 4th window west of front door in La Commune
  • take out and cap OR at least cover w small platform the copper water lines along floor behind the front counter

Bottom Priority

Ballroom Area

Crow's Nest

  • Make main (east) door to this room better fitting / gasketed against all air gaps so it functions for soundproofing
  • rebalance fan

Mezzanine Bathroom

  • active ventilation needs to be wired & installed (exhaust) in current ventilation window

Stage

  • Create wider storage openings under stage. Not insubstantial. See stage storage build plan.

Ticketbooth Room

  • Install threshold plate to base of jamb (no more than 1/2" high as per ADA) to cut down on sound from ballroom
  • install gaskets to door jambs to cut down on sound. (icarus)

Mezzanine Bathroom

  • install door stop so the door can be propped open sometimes.

Basement Area

Kitchen

  • Knock out / expand west kitchen wall to next-west supporting pipe
  • Remove firred-out drywall, cover with FRP

Cafe Balcony

  • between fridges: get an exterior outlet plastic cover for 4"x4" outlet box here, so outlets do not get wet if it rains when roof hatch is open
  • closet between fridges: install lock to this door, make lost & found room

bathroom

  • Install ventilation exhaust fan in cafe balcony bathroom ceiling

kitchenette

  • acquire and cable-lock to wall electric kettle; remove all stovetop kettles.
  • replace gas stove with induction model (its a sklinny stove, keep eye peeled at urban ore H4H etc)
  • replace stove exhaust fan with one that will exhaust air directly up through cabinets (in a duct) to above kitchen

TIL

  • Get clear cover to put over wall switch for old electric timer in wall in big bookshelf unit in south wall of TIL

Disco Room

  • test linoleum for asbestos content
  • remove linoleum (may need to hire certified abatement company if asbestos present)
  • sand wood floor and seal with water based polyurethane
  • all A/V & musical equipment (including in crow's nest) needs to be recorded (serial #s) and ownership determined
  • ensure remaining shelving along north wall of disco room is fixed/affixed more safely
  • pendant lights should probably be raised a bit higher up (low priority)
  • pendant light switch(es): consider replacing with dimmers
  • lightswitch cover near 48th st door should be replaced with one with less-sharp edges (better-sized)
  • weight load for high-up triangular shelves in corners to be assessed (julia) to determine if speakers etc can be placed there

Bocce Room

  • do better job of affixing & routing low-voltage 'inside wiring' ie all ethernet, phone cabling

Sudo

  • sand down side of basement door so it does not stick closed so bad (belt sander optimal)