=Priorities=  | |||
==Protocol==  | |||
=Questions=  | =Questions=  | ||
Revision as of 04:17, 24 February 2015
This page exists as a living checklist for all the tasks we need to get done for Omni to be "ready" ;)
Once a task is completed:
It should be crossed out- Incomplete tasks are not crossed out yet!
 
enjoy!
To-dos
- Merge items from these lists:
 - Connect to revival of Building Construction and Maintenance Working Group
 
Ballroom
See full documentation on Ballroom-readiness page.
Code-compliance
- Electrical
 - Doors
 - Drywall
- Remaining holes needing to be patched:
 - See "Soundproofing" below as well, namely the South Wall needs an extra layer of drywall with acoustic glue.
 
 - Fire Extinguishers
 - Soundproofing:
- New soundproofing (major): Removable skylight covers: fabricated, hauled up to & installed on roof. Also will allow for daytime film screenings / daytime darkness in ballroom.
 - New soundproofing (minor): Finish moving bookshelves & library from basement and install to south wall of ballroom (floor & mezzanine).
 - Fixes & improvements necessary for existing Shattuck-facing soundproofing (window baffles):
 
 - Basement
 
Cosmetic Work
- Painting
 - Fixture covers
 - Storage
 - Organization (everything needs to be put away in a place it lives)
 - Hang art, especially on South Wall (downstairs, ballroom) via Contemporary Art Museum of Oakland (CAMO).
 
A/V and Stage Production
Basement
(kitchen + fnb + mpm + baps + bhc + omp + ?)
- Replace all missing fire insulation ceiling tiles
 - Tie up loose ends, any hanging fixtures, trim, etc needs to be re-affixed.
 - Lighting for both staircases
 
Kitchen
- Expand walls
 - Seal off pantry (give to black hole collective labs)
 - Install dish washer
 - Finish fixing up stoves & overhead
 - Build closet for mop sink and water heater
 - Coat / seal floor
 
Library
- Move all shelves and books up into the ballroom
 
Print Shop
- Preliminary ventilation (check existing vents)
- They're currently using non-toxic (green) solvents, low-odor, low-impact
 
 - Extensive ventilation for future printing purposes
- For operating the offset printing press (later).
 
 - ADA accessibility for walkways.
 - Safety demarcations for presses, etc
 - Keep back entrance to sudo clear.
 - Lighting improvements
 - Electrical audit
 
Middle Rooms
- Inspect past water leakages, damage
 - Sound-proofing
 - Electrical audit
 
Basement General
- Needs electrical outlets very badly (e.g. for meeting space)
 
Blackhole Labs
- Walls, doors
 - Insulation
 - HVAC, especially for ventilation
 - Repurposing of raised platform?
 - Electrical audit
 
Bocce Ball Court
(sudo + ccl)
- Pathways / walkways / ADA accessibility
 - Lighting
- Especially relevant during the night, lots of use at these times (daylight hours get light from skylights)
 - LED / power-efficient options?
- Color-changing eventualities!
 
 - Couple lighting better with architecture / layout of space
 - Could increase the number of fluorescent fixtures.
 
 - More shelving
- Free-standing storage structures
 - Catwalk for storage (along edge of room)
 
 
Counter Culture Labs
- Plumbing:
- Sink in NorthEast closet
 - Sink in East wall
 
 - Electrical
- Conduit and outlets on North and East walls.
 
 
Sudo Room
- Electical
- More conduit and outlets along walls
 - Safely reach center of room with power
 
 - Re-organize all the things
 - Manage wood / materials
 
La Commune
- Finish drywall behind former bar
 - Remove previous fixture hardware from ceiling
 - Paint ceiling?
 - Patch and paint high walls (fire safety)
 - Install new lighting
 - Electrical
- Install conduit / outlets along North wall, West wall, and behind South East counter
 
 - Plumbing for cafe service area
 - Mop sink
 - Finish floors
 - Move bookshelves
 - Arrange furniture / tables / etc
 - ADA Accessible walking paths, demarcations
 
Community
- Front entrance / welcoming improvements
 - Scrape paint off of alcove windows (keep alcove for sound barrier to street)
 - Replace door with break-away door handles, etc for fire safety / escape
 - Finish ADA bathroom
- Seal concrete
 - Re-set toilet
 - Clear up any issues with # of stalls, etc
 
 
Mezzanine
(til + tiny-room + den + kitchenette + shower + bathroom)
- Electrical
- Supply sufficient power for use throughout
 - Ensure stairways are successfully lit
 - Modify lighting
 - Check bathroom for lighting
 - May need conduit and outlets in den
 
 - Remove remaining ceiling tiles, hardware
 - Consider removing fake wall / paneling between the mezzanine banister and the ceiling.
 
Timeless, Infinite Light
Wellness Room
Den
- refinish floors in den
 
Kitchenette
- Better trash recepticals
 
Shower
- Potentially install washout or mop sink in shower area
 
Bathroom
Disco Room
- Implement functional and reliable sound system
 - Fix dance floor
- Remove plastic sheets
 - Repair light system
- Clean, restore filters, covers, insulation, etc
 
 - Replace plastic sheets, level, seal so surface is flush
 
 - Replace missing linoleum, tiles or other flooring surrounding the dance floor
 - Fix or dismantle shelves around room
 - Create sufficient storage, while preserving walkable space around room.
 - Install easy-to-use, sound-insulating privacy screen / curtain / temporary wall between kitchenette bar and disco room.
- Sound is most important here, as well as creating privacy for folks in the room
 
 - Install curtain inside disco room on small window in door.
 - Determine if any beams are sufficiently strong to hang items for performance / fixtures / etc
 - Ensure sufficient lighting is installed and functional
 - Ensure sufficient power is arranged throughout the room for functional purposes
 
Rise Above
- Build closet for electrical panels in South East corner of room.
 - Make doors and windows more easily lockable
 - Connect power from this room to outside lighting fixtures
 - Ensure sound and scent insulation / hvac / fans are sufficient for usage
 
Bike Kitchen
- Dismantle
 - Turn into trash storage
 
Walk-in Freezer
- Locate a properly-sized, functioning compressor
- Install safely and securely
 
 - Clean rest of room, use for trash bins or other cleaning supplies as necessary.
 
Omni - Throughout
- Implement new / upgraded trash system (Jenny)
 - first-aide kits
 - clip boards in bathrooms, kitchen, and other rooms to log cleaning
 - assigned spot for cleaning supplies each floor.
 
Hallways and Thoroughfares
- Remove trash cans, store somewhere not in path of travel
- Plan is to place in current bike room and across from entrance to walk-in food storage.
 
 - Make tape-based paths for unclear areas to maintain accessible paths free from clutter.
 
Outside Perimeter
- Improve lighting, especially near entrances
 - Mark spots for trash cans to place them there on trash days only
 - additional bike racks
 
Roof
- Install drain catch / cover to keep gutters from clogging, roof puddling, and leaks forming.
 - Create sound-insulating skylight covers.
 
Priorities
Protocol
Questions
- Do all doors need to be lockable? Do any need to be electrified? Why? No ballroom doors are primary access, right?
 - cameras outside?