Omni-readiness

From Omni Commons
Revision as of 06:03, 24 February 2015 by Patrik (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

This page exists as a living checklist for all the tasks we need to get done for Omni to be "ready" ;)

Once a task is completed:

  • It should be crossed out
  • Incomplete tasks are not crossed out yet!

enjoy!

To-dos

Ballroom

See full documentation on Ballroom - To Do List page.

Code-compliance

Cosmetic Work

A/V and Stage Production

Basement

(kitchen + fnb + mpm + baps + bhc + omp + ?)

  • Replace all missing fire insulation ceiling tiles
  • Tie up loose ends, any hanging fixtures, trim, etc needs to be re-affixed.
  • Lighting for both staircases

Kitchen

See full documentation on Kitchen - To Do List page.

  • Expand walls
  • Seal off pantry (give to black hole collective labs)
  • Install dish washer
  • Finish fixing up stoves & overhead
  • Build closet for mop sink and water heater
  • Coat / seal floor

Library

  • Move all shelves and books up into the ballroom

Print Shop

  • Preliminary ventilation (check existing vents)
    • They're currently using non-toxic (green) solvents, low-odor, low-impact
  • Extensive ventilation for future printing purposes
    • For operating the offset printing press (later).
  • ADA accessibility for walkways.
  • Safety demarcations for presses, etc
  • Keep back entrance to sudo clear.
  • Lighting improvements
  • Electrical audit

Middle Rooms

  • Inspect past water leakages, damage
  • Sound-proofing
  • Electrical audit

Basement General

  • Needs electrical outlets very badly (e.g. for meeting space)

Blackhole Labs

  • Walls, doors
  • Insulation
  • HVAC, especially for ventilation
  • Repurposing of raised platform?
  • Electrical audit

Bocce Ball Court

(sudo + ccl)

See full documentation on Bocce Ball Court - To Do List page.

  • Pathways / walkways / ADA accessibility
  • Lighting
    • Especially relevant during the night, lots of use at these times (daylight hours get light from skylights)
    • LED / power-efficient options?
      • Color-changing eventualities!
    • Couple lighting better with architecture / layout of space
    • Could increase the number of fluorescent fixtures.
  • More shelving
    • Free-standing storage structures
    • Catwalk for storage (along edge of room)

Counter Culture Labs

  • Plumbing:
    • Sink in NorthEast closet
    • Sink in East wall
  • Electrical
    • Conduit and outlets on North and East walls.

Sudo Room

  • Electical
    • More conduit and outlets along walls
    • Safely reach center of room with power
  • Re-organize all the things
  • Manage wood / materials

La Commune

See full documentation on La Commmune - To Do List page.

  • Finish drywall behind former bar
  • Remove previous fixture hardware from ceiling
  • Paint ceiling?
  • Patch and paint high walls (fire safety)
  • Install new lighting
  • Electrical
    • Install conduit / outlets along North wall, West wall, and behind South East counter
  • Plumbing for cafe service area
  • Mop sink
  • Finish floors
  • Move bookshelves
  • Arrange furniture / tables / etc
  • ADA Accessible walking paths, demarcations

Community

  • Front entrance / welcoming improvements
  • Scrape paint off of alcove windows (keep alcove for sound barrier to street)
  • Replace door with break-away door handles, etc for fire safety / escape
  • Finish ADA bathroom
    • Seal concrete
    • Re-set toilet
    • Clear up any issues with # of stalls, etc

Mezzanine

(til + tiny-room + den + kitchenette + shower + bathroom)

  • Electrical
    • Supply sufficient power for use throughout
    • Ensure stairways are successfully lit
    • Modify lighting
    • Check bathroom for lighting
    • May need conduit and outlets in den
  • Remove remaining ceiling tiles, hardware
  • Consider removing fake wall / paneling between the mezzanine banister and the ceiling.


Timeless, Infinite Light

Wellness Room

Den

  • refinish floors in den

Kitchenette

  • Better trash recepticals

Shower

  • Potentially install washout or mop sink in shower area

Bathroom

Disco Room

See full documentation on Disco Room - To Do List page.

  • Implement functional and reliable sound system
  • Fix dance floor
    • Remove plastic sheets
    • Repair light system
      • Clean, restore filters, covers, insulation, etc
    • Replace plastic sheets, level, seal so surface is flush
  • Replace missing linoleum, tiles or other flooring surrounding the dance floor
  • Fix or dismantle shelves around room
  • Create sufficient storage, while preserving walkable space around room.
  • Install easy-to-use, sound-insulating privacy screen / curtain / temporary wall between kitchenette bar and disco room.
    • Sound is most important here, as well as creating privacy for folks in the room
  • Install curtain inside disco room on small window in door.
  • Determine if any beams are sufficiently strong to hang items for performance / fixtures / etc
  • Ensure sufficient lighting is installed and functional
  • Ensure sufficient power is arranged throughout the room for functional purposes

Rise Above

  • Build closet for electrical panels in South East corner of room.
  • Make doors and windows more easily lockable
  • Connect power from this room to outside lighting fixtures
  • Ensure sound and scent insulation / hvac / fans are sufficient for usage

Bike Kitchen

  • Dismantle
  • Turn into trash storage

Walk-in Freezer

  • Locate a properly-sized, functioning compressor
    • Install safely and securely
  • Clean rest of room, use for trash bins or other cleaning supplies as necessary.

Omni - Throughout

  • Implement new / upgraded trash system (Jenny)
  • first-aide kits
  • clip boards in bathrooms, kitchen, and other rooms to log cleaning
  • assigned spot for cleaning supplies each floor.

Hallways and Thoroughfares

  • Remove trash cans, store somewhere not in path of travel
    • Plan is to place in current bike room and across from entrance to walk-in food storage.
  • Make tape-based paths for unclear areas to maintain accessible paths free from clutter.

Outside Perimeter

  • Improve lighting, especially near entrances
  • Mark spots for trash cans to place them there on trash days only
  • additional bike racks

Roof

  • Install drain catch / cover to keep gutters from clogging, roof puddling, and leaks forming.
  • Create sound-insulating skylight covers.

Priorities

Protocol

Questions

  1. Do all doors need to be lockable? Do any need to be electrified? Why? No ballroom doors are primary access, right?
  2. cameras outside?