Omni-readiness
This page exists as a living checklist for all the tasks we need to get done for Omni to be "ready" ;)
Once a task is completed:
It should be crossed out- Incomplete tasks are not crossed out yet!
 
Enjoy.
Ballroom
See full documentation on Ballroom-readiness page.
Code-compliance
- Electrical
 - Doors
 - Drywall
- Remaining holes needing to be patched:
 - See "Soundproofing" below as well, namely the South Wall needs an extra layer of drywall with acoustic glue.
 
 - Fire Extinguishers
 - Soundproofing:
- New soundproofing (major): Removable skylight covers: fabricated, hauled up to & installed on roof. Also will allow for daytime film screenings / daytime darkness in ballroom.
 - New soundproofing (minor): Finish moving bookshelves & library from basement and install to south wall of ballroom (floor & mezzanine).
 - Fixes & improvements necessary for existing Shattuck-facing soundproofing (window baffles):
 
 - Basement
 
Cosmetic Work
- Painting
 - Fixture covers
 - Storage
 - Organization (everything needs to be put away in a place it lives)
 - Hang art, especially on South Wall (downstairs, ballroom) via Contemporary Art Museum of Oakland (CAMO).
 
A/V and Stage Production
Basement
(kitchen + fnb + mpm + baps + bhc + omp + ?)
- Replace all missing fire insulation ceiling tiles
 - Tie up loose ends, any hanging fixtures, trim, etc needs to be re-affixed.
 - Lighting for both staircases
 
Kitchen
- Expand walls
 - Seal off pantry (give to black hole collective labs)
 - Install dish washer
 - Finish fixing up stoves & overhead
 - Build closet for mop sink and water heater
 - Coat / seal floor
 
Library
- Move all shelves and books up into the ballroom
 
Print Shop
- Preliminary ventilation (check existing vents)
- They're currently using non-toxic (green) solvents, low-odor, low-impact
 
 - Extensive ventilation for future printing purposes
- For operating the offset printing press (later).
 
 - ADA accessibility for walkways.
 - Safety demarcations for presses, etc
 - Keep back entrance to sudo clear.
 - Lighting improvements
 - Electrical audit
 
Middle Rooms
- Inspect past water leakages, damage
 - Sound-proofing
 - Electrical audit
 
Basement General
- Needs electrical outlets very badly (e.g. for meeting space)
 
Blackhole Labs
- Walls, doors
 - Insulation
 - HVAC, especially for ventilation
 - Repurposing of raised platform?
 - Electrical audit
 
Bocce Ball Court
(sudo + ccl)
- Pathways / walkways / ADA accessibility
 - Lighting
- Especially relevant during the night, lots of use at these times (daylight hours get light from skylights)
 - LED / power-efficient options?
- Color-changing eventualities!
 
 - Couple lighting better with architecture / layout of space
 - Could increase the number of fluorescent fixtures.
 
 - More shelving
- Free-standing storage structures
 - Catwalk for storage (along edge of room)
 
 
Counter Culture Labs
- Plumbing:
- Sink in NorthEast closet
 - Sink in East wall
 
 - Electrical
- Conduit and outlets on North and East walls.
 
 
Sudo Room
- Electical
- More conduit and outlets along walls
 - Safely reach center of room with power
 
 - Re-organize all the things
 - Manage wood / materials
 
La Commune
Mezzanine
(til + tiny-room + den + kitchenette + shower + bathroom)
Disco Room
Rise Above
Bike Kitchen
Walk-in Freezer
Omni - Throughout
- Implement new / upgraded trash system (Jenny)
 
Hallways and Thoroughfares
- Remove trash cans, store somewhere not in path of travel
 - Make tape-based paths for unclear areas to maintain accessible paths free from clutter.
 
Questions
- Do all doors need to be lockable? Do any need to be electrified? Why? No ballrom doors are primary access, right?