Meeting w/ DK 5/5/2015
- South wall - need architect and Brian the sound guy's input
- Pull permits from both front door and south wall - Valuation Threshold entails 20% on ADA improvements
- Need to replace the veneer with drywall, but that's a bit outside the scope of just building another wall
- Drawings should be ready any day
- Permit fee is typically 10% of the total cost
- Going to expedite an over-the-counter permit
- If they shelf it, DK will go back every morning and email folks to pressure them to expedite
- Front door
- Jim suggests we lower the slope by demo'ing the sidewalk and repouring it at an angle < 2%
- Would have to remove the Ligure Club tile and reset it
- Riley Doty, obsessive historic tile preservationist - dotytile@gmail.com
- If we grind down we don't need to have a kicker and it's more accessible
- Can get basic door hardware from Home Depot - 2 foot door we'd have to special order, 3 ft door @ home depot
- Can get away with a cheaper panic bar
- Probably will need a cement finisher to get the right slant in
- Need: 1 good door closer (return the one from home depot), panic bar, electric strike,
- Shattuck side doors need panic bars as well
- Kitchen
- For health, resurface the floor
- Water heater spec
- Fire will be easier, need to replace the vent for makeup air
- Finance
- We've spent $7-8K on building so far
- The $5K estimate for the hood is a big chunk right now
- Fire
- Tell John we can move ahead on the extinguishers
- Electrical
- TIL is going to pay Omni back for the hours Mike spent in their room
- Also need adequate lighting in the hallways - 3-way switches
- Need another light in the southeast corner of the ballroom
- Lights with cages, $30 each, we got a bunch of those
- Sudo needs one more exit sign on the platform
- Jake says he can probably do Saturday for the ballasts
- Should we replace the ones that are going as well?
- Southeast staircase needs 3-way switch - Jenny will ask Hol and Whitney, also broken light in hallway should be replaced w/ new fixture
- Staircase from La Commune to basement needs these light fixtures as well - ask if Matt or Brendan can do that
- Put in movement-activated switches - the new fixtures can be easily hooked up to a motion sensor
- $37 motion sensor at Emperor
- Plastic tube covers for the flourescents that seem low, remove flourescents and put them in these protective tubes, need black caps on the ends
- Cover all small holes in the building - one in the A/V room - just need drywall squares, mud and tape - back it first w/ Joe
- Ceiling tiles on top of the drywall in the basement near where black hole was slated to be
- Where to find those? - check urban ore first
- 3-Phase taken on by Scott the electrician and Whitney
- 4YE 3-Phase (not delta)
- Currently using residential electrical, they can charge us for commercial at any point
- Won't get charged for any of the pipe or trenching
- Check in w/ Whitney to take on 3-phase w/ Scott
Electrical Team:
- Are you capable of installing a 3-way switch?
- Can you bend conduit and are you comfortable with it?
- How many people do you need to help, if any?
- How familiar are you with codes?
Permits
- Meeting sometime this week
- Getting info on a general permit today - hopefully we get Dexter
- South wall, front door, plumbing in la commune, fire suppression
- Where to pull the suppression permit? Fire?
ADA Bathroom
- Voluntary upgrade relieves us of some reqs like a fixture count for the whole building
- Shawn and Yar could go down to the city next week
Action Items:
- Arrange electrical work party for Saturday
- Arrange mtg w/ Yar, Shawn, and the city re: ADA bathroom & permit - application needs to be reactivated
- How to address removal of toilets - providing one w/ someone w/ accessibility issues, it's worth it
- Dexter better than Sharif
- Get Jim involved
- South wall, general building permit
- Meeting w/ John on Monday @ 5pm to discuss drywall in La Commune and insulating the opening to the Disco Room