South wall
- Bottom level almost finished
- Walls framed for upstairs
- put wires up today (to hold up the fiberglass)
- shot foam into cracks near the west end
- Calvin Lee is our plan checker for the city. DK waiting until he is the engineer of the day to get permit.
- Laura and Yar + whoever will go to city tomorrow to finish permit, after talking to DK. Joe will orient on plans
- Joe is leaving this Saturday for 10 days (Sat 13th - Tue 23rd)
- We should aim for 1st inspection of framing the week of the 15th
what's left?
- joe's got another 3 days of work (not thursday)
- will hopefully finish the framing for inspection
- will get the two ends of the bottom wall, by the closet & staircase
basement
- rob cut out moldy parts of the drywall. too soggy to scrub.
- temporarily patched the holes with boards - foam, wood, etc
- used a steam cleaner + borax
- framing is still deteriorated - the footer wood is rotten, crumbling
- ideally we'd replace framing if we ever get more money
- priority is to pass fire inspection so let's just cover it with drywall, will look fine
- will that be fire safe?
- joe says it wouldn't be that hard to just put cripples on the bottom
doors
- anka & dusty working on doors tomorrow
- hallway door to sudo/ccl is poorly hung. frustrating.
front door
- nothing's happening
- city didn't like our idea
- they're putting in the opener
- it's too low but we're gonna do it anyway
bathroom
- yar still hasn't treated the concrete. trying to find the bucket of stuff again.
- do we need more womens' bathrooms?
- fire doesn't care about that. whole other can of worms.
DIsco Room
- Joe finished taping drywall facing LC
- empty socket with no bulb, no globe/cover, no exposed wires up in the ladder closet thingy
hole in the west wall
- should we insulate the DR hole before closing it? tyvek? denim? might need weather proofing
- will the drywall overlap? will that look bad? we could hang a picture or a mirror over it
- entire wall of the dance floor has a U-channel, all ready for mirrors. just need to set them in & tack them. just need to find them the right height or cut them.
- should we frame it? silicone it?
- no, as long as it's closed, it's fine. screws, spackle, done.
- but the edges will look weird
- we'll figure it out tomorrow
kitchen
- meeting tomorrow with max, sophia chang (the kitchener), sal (actual cafe)
Other Reports
- laura's working through the big list piece by piece
- talk about covering more lightbulbs
- gerald wants to get LC ceiling tiles gone, but those are necessary for the cafe to operate
- laura will contact gerald to take on some of the small electrical jobs and filling in ceiling tile
- roan has other stuff going on, unable to work right now
- ballroom bathroom grafitti's getting better. more diverse. because joe is writing it.
- storage closet shelves are caving in / bowing. need to be redone.
- trash room is a mess. people aren't sorting it because not enough bins clearly labelled. laura will buy some 3-in-1 bins
priorities
upcoming milestones
- fire inspection
- usable ADA toilet
dangerous distractions
- stage projector screen