stuff in the building to fix
Ballroom Area
A/V Room
Electrical subpanel: Either replace broken breaker switches with with working ones, or install factory blanks.<-- MATT ALREADY DID THIS- Patch small hole above door where conduit is peeking through.
- Patch hole near floor in NW corner of this room near door jamb. <--In progress by kkr
Bar
- soffet-mounted ceiling light fixtures need: lightbulbs tested / replaced if necc
- Put up ABC signage req. for pub or private parties w/ alcohol re: cancer/pregnancy warning
- Determine fix for leaking sink in 3-sink (weld?) - southmost sink (on left if you are behind bar)
- Install floor sink under 3-sink as per health code
- Outlets on east/shattuck-side wall need to be: removed, wire-nutted, wrapped in elec tape, covered with blank faceplates. TURN OFF CIRCUIT FIRST. Note: furthest N outlet not disconnected, only outlet in the center of the wall
Ballroom-Shattuck Exit Area
- install closers to both inner doors.
- install panic bars to both inner doors.
- install panic bars to both outer doors.
- install light cover into flourescent panel (22"x3') - flourescents are 2x 2' bulbs
Stage
- Create wider storage openings under stage. Not insubstantial. See stage storage build plan.
Mezzanine
- SE staircase: Install new led strip lighting on ea. side of stair to replace dead lighting strips
- SW staircase down: motion detector installed onto light fixture.
- SW staircase up: Install new led strip lighting on ea. side of stair to replace dead lighting strips
- SW staircase up: Repair hole in south wall near floor immediately across from stairs (see south wall acoustic treatment)
- SW staircase up: Determination if 3-way switch needs to be installed at top of stair. Currently there is only a switch at bottom landing.
- SW staircase up: motion detector installed onto light fixture.
Mezzanine Bathroom
- outlet needs to be replaced with GFCI - Note: no ground; Gerald suggests decommissioning and installing new grounded plug in wall just above counter; go into wall from other side, need to locate grounded location
- active ventilation needs to be wired & installed (exhaust) in current ventilation window
- all exposed bulb fixtures need be replaced with covered fixtures (2x)
- install door stop so the door can be propped open sometimes.
Mezzanine "Book Room"
- 4"x4" Outlets affixed to top of Electrical subpanel must be removed from subpanel, and affixed to balcony (code violation) (3x)
- Electrical subpanel needs be moved to plywood wall south of panel, onto drywall, 2' from ground.
- 3-way switch wiring (for chandelier) inside subpanel needs to be removed and placed elsewhere as not ok in-panel.
- Install closer to Mezzanine room door
Crow's Nest
- Clear everything 3' in front of electrical subpanel including all cords, lighitng, etc
- acquire & install cover for light (fixture takes glass orb / cover around bulb, it is missing)
- Make main (east) door to this room better fitting / gasketed against all air gaps so it functions for soundproofing
- rebalance fan
- extend balcony railing to out in front of balcony hatch - on E side of R&J balcony (building & osha safety)
- Refinish & airgap-seal east wall above loft in this room so room functions as soundproofing / air barrier to exterior of bldg
- Install real doorknob, remove latch
- make north door to romeo & juliet balcony airtight (or better fitting) for turning this room into a soundproofing barrier
- Install closer to main (east) door
- Install closer to north / balcony door
- ensure balcony hatch is robust enough to support 300lb standing weight
Ticketbooth Room
- Remove giant bookshelf and all debris/material from this room. Call Emerson - ask them to get their table back, or are they donating to us ? :)
Make metal grille outside window openable, so the casement window can open.<== This would increase security risk and is not a building requirement- Install threshold plate to base of jamb (no more than 1/2" high as per ADA) to cut down on sound from ballroom
- Install closer to Ticketbooth room door (pref. good kind with long close time for wheelchair)
- Patch small hole in ceiling corner above ticket window where new conduit was run.
- install gaskets to door jambs to cut down on sound. (icarus)
Disco Room
- 4th window from main door as a broken pane
- 5th window from main door the window frame rub against the wall on E side
- light switch cover near 48th street door should be replaced by one with less-sharp edges (better-sized)
- weight load for high triangular shelves in corners to be assessed (julia) to determine if speakers etc can be placed there
La Commune
- install closer to basement stairs door
- cover floor sink behind front counter area w minimum 3/4" plywood cut out and sealant (trip hazard/health)
- fix broken glass pane in 4th window west of front door in La Commune
- replace all low uncover lights near entrance w cover lights x3
- take out and cap OR at least cover w small platform the copper water lines along floor behind the front counter
- locked storage - unplug and store all extension cords
Rise Above
- replace locking main door to Rise Above in hallway with twenty minute solid-core (fire-code)
- replace 2x hollow-core sliding doors with 20 minutes solid-core sliding doors (fire-code)
- replaced busted circuit breaker in every electrial panel (like in the 42 breaker panel) with either working breaker or factory blanks.
- put closer on main door to Rise Above
- remove 2x6 on ceiling on south side of room (COORDINATE WITH GABRIELA 1ST - move or cover all her stuff.
- stage left - install paper towel dispenser and paper towels.
Sudo
- created dedicated space for storing excess lumber (long pieces), pipe, metal pieces, etc so they are not in jumbles (fire code).
- Stairwell - sand down side of door so it does not stick closed so bad (belt sander optimal).
- west wall - run more 3/4" conduit further down west wall. Must know code.
Sudo/CCL
- along perimeter / walls do better job of affixing & routing low-voltage 'inside wiring' ie all ethernet, phone cabling
- ballroom door - put closer on this door
- basement door - if possible, put closer on this door (may not be possible)
- entire room perimeter - 5LB ABC fire extinguishers at correct height every ~75' - starting w under each exit sign
- hallway door - install panic hardware & lock to this door
- hallway door - install closer to door
- ticket booth room - install new outlet (existing is cracked and not attached to wall)
TIL (TI)
- cover exposed wires in east wall (near bookshelf). can use a plate
- get clear cover to put over wall switch for old electric timer in wall in big bookshelf unit in south wall of TL
Basement
- south wall: close holes in basement wall where opened to remove mold.
- identify stuff in bunker rooms & hallway: what is Phat Beets, Black Holes, what is junk/unclaimed?
- west wall: re-connect or newly connect toggle switch to basement ventilation fan in basement. Currently breakers turn it on.
- Phat Beets room ventilation doesn't work. people can suffocate in there.
ceiling
- Acquire & install light fixture covers for the 4' flourescent fixtures in basement offices (bunker rooms) - roughly ~48"x16".
- install protective bulb covers over remaining working 8' flourescents: 6x
- unscrew piece of broken lightbulb from East basement hallway, replace bare-bulb fixture with covered fixture
- re-attach and restore service to entire strip of 8' flourescents along west wall (closest to sudo) that had been decommissioned
- acquire and affix 1'x1' ceiling tiles in NW corner of basement, so lighting fixture & strip of lights can be re-connected. ~120 tiles
- Cut & attach drywall AND then also affix 1'x1' ceiling tiles to exposed ceiling areas in basement (2 areas)
- Replace bad ballast in any 8' flourescent fixture (that is not turning on. If not sure try lights in it that do work in another fixture.
kitchen
- Purchase and affix Class-K extinguisher at correct height
- Cover exposed wiring in FNB locked-pantry ceiling (with e.g. metal plate)
- Install Ansul fire-suppression in hood
- Replace entire 4' flourescent light fixture closest to stove (has 1x broken tube holder)
- Resurface kitchen floor, cover with quarry tile
- Knock out / expand west kitchen wall to next-west supporting pipe
- Fix or replace corroded window frames along shattuck
- Cut in mop sink in westmost pantry area
- Acquire and install tankless water heater, check gas line diameter & exhaust ductwork
- Acquire makeup air into kitchen (remove desk fan from duct, replace with something to code - 95% of hood CFM)
- Put closers on both basement kitchen doors
- Remove firred-out drywall, cover with FRP
- steam clean stove hood