NOmni Building Working Group, August 17, 2015
who's here
- laura, matt, yar, daniel, mary, remote joe
work party
- how'd this week go? what'd we do?
- south wall romex removed, new wire not installed yet. joe & his son are working on a written plan. switching from MM to MC flexible metallic conduit, after joe checks with inspector (joel ortiz) to make sure
- a few sheets of drywalling on the first floor south wall
- more doors got marked and screwholes glued. ready to screw and hang next time yar has an extra hour
- LC roof fans inspected - pigeons and wasps need to be removed
- got rid of lots of stuff from basement, including red stage. dump runs yesterday, today, tomorrow
- upstairs kitchen bathroom light fixed - needs metal cage
- electrical supplies mostly sorted - still some needed
- Daniel and mary measured and labeled all the old Romex so it can be given or sold to another job, or used by Sudo
WHat went well:
- good number of volunteers, they always had something to do
- organizing tasks in advance helped
- organizers arriving early to get set up
- frame removed from west LC mezzanine staircase
What didn't go well
- yar got there late, jessie couldn't stay
- kerrie was sick
- couldn't tell what basement wall needed to be patched
- rob knows about this, did it partially
- need to patch the water leak on the outside
- also involves getting childrens hospital to repave their parking lot. need contacts from DK
- food never showed up. next time cook with FNB or just use their kitchen
what could we do on sat 22?
- hang doors
- more drywalling, patching holes
- mount mirrors
- retile bathroom
- basement ceiliing tiles
- install 1 paper towel dispenser in stage l bathroom
- buy 3 more paper towel dipsensers and install secret bathroom, upstairs kitchen bathroom, ada bathroom
- fix secret bathroom door
- finish off the pigeons and wasps
- put cage on upstairs kitchen bathroom, or replace bulb with shatter proof bulb
- really need to go over the paper list more
- floor repair
wheelchair bathroom
- Becoming Omni group has requested that we have the wheelchair bathroom ready in time. Probably end of September.
klaus
- laura and yar met with klaus a few weeks ago, forgot to report back
- he recommended we leave doors off the "intersection of doom" for now and pass fire inspection without them, then put new doors further into the ballroom later
- he also made us take down the stage curtail
Remaining Changes to pass fire inspection of ballroom
- Remove hardware from front shattuck doors and install panic bars with normal latching mechanism
- Reinstalling exit signs