Event:2015/11/23 Building
Jump to navigation
Jump to search
Omni Building WG Meeting Monday November 23, 2015
wall
- ed ordered caulk, it's in the mail
- most caulking is done, need to do it above the stairs mostly
- there's still quiet rock back there
- after caulking, we need an inspection
- they want to see the caulk and the electrical
- front door also needs inspection
- then we get the bookshelves up
- maybe dimmer on the mezzanine lights?
front door
- also needs inspection, maybe at the same time
- did the plans include a kicker? joe can't find them. they were somewhere in storage
- ada & casp want a 32" opening, but the electric strike sticks out into it
- did our permit expire? it's been more than 6 months. joe will call and ask
meeting times
- we should set a regular time again
- this week we did fundraising 5-6:30, building 6:30-7. don't need a full hour
- yar will tell the lists that that's what we're doing next week
- actually let's do just rodents 6:30-7 so patrik can make that. then rest of building wg at 7.
solar
- we can get free panels from sun-gevity if we own it
- pay em off in birthday parties
fire
- we need 4 panic bars
- fire alarms & smoke detectors at every exit sign. new info...
- lighting on the red stage
- rob: maybe. instead of running a whole circuit, maybe you could put a map on the wall
- rob is fwding our evacuation plans to firelady
- stephanie our fire consultant - yes that's actually written on her business card. FIRE LADY
- let's ask people for money
- urban ore?
- anarchristmas
wheelchair bathroom
- maybe we could have a motion sensing light instead of needing a lightswitch?
- but we should really work on the lightswitch before closing up the wall
- a motion sensor would be great for accessibility
- still can't have the rear bar until we close that other wall. makes sense to close both walls in one job
- where'd that glue go?
rats
- patrik brought little mousey guillotines and an electrocution chamber
- he's catching mice every day
- rats are getting smarter
- they haven't been doing any experiments because of rodents
- need teams for: patching holes, setting & checking tracks, and eliminating attractors (food left out)
- trash bins are overfilling - tuesday FNB has been taking it out
- yar still wishes we could keep them on the street
- easement issues, but we could try building a small fence around it. see how it goes.
- patrik's not convinced it would keep things cleaner
- maybe john won't like it. wait until we own it
- basement pantry - go around with flashing? right now they're breeding inside but first thing to do is close the outside
- rob: they're digging a hole under the tree and coming into the wall
- next ratpack meeting? patrik will make a doodle poll
- rob's incentive - whoever catches a rat, gets a beer
- dead rats go in the green bin
- joe heard if you're commercial you have to subscribe to these "green" poison traps or something. maybe it saves birds but not raccoons.
- but skunks are very brazen
- something stinks under the steps to the server area
- phat beets are leaving onions & garlic out, but they're probably still peeing on it. patrik wouldn't trust eating it
- yar made https://omnicommons.org/lists/listinfo/rodents
assignments
patrik would like a map of who's assigned to monitor what areas for rats
- patrik's doing ccl
- rob can do sudo
- yar can do part of the basement, but is only here a few nights a week
messes
- patrik: should we ban people for leaving messes? that's just as much a welfare/community issue. even someone who drops off free food donation and just leaves it in a bin.
- yar: maybe first step is articulating clear expectations...
- joe: maybe signs and a workshop
- separate trash
- judith is getting colored bins from stopwaste
- rob: there should be constructive criticism
- who's doing dropoffs? maybe a registry
- sudo & ccl have laminators. patrik can make signs
movies
- film screening / projectors need a permit
- not for copyright but for a public assembly space
- we can tack it onto the wall permit
- it's on pulleys attached to ceiling joists above the stage
- we have a structural engineer (peter) who'll draw it up & sign it off