Event:2018/08/06 Delegates Meeting

From Omni Commons
Revision as of 22:32, 9 September 2018 by Lynnhowe (talk | contribs) (Created page with "Omni Delegates' Meeting - September 6, 2018 7pm-9pm for instructions on preparing and archiving these notes, please see the bottom === Agenda === * Introductions, Meeting R...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Omni Delegates' Meeting - September 6, 2018 7pm-9pm

for instructions on preparing and archiving these notes, please see the bottom

Agenda

  • Introductions, Meeting Roles, and Delegates Count [10 minutes]
  • Access Check-in [5 minutes]
  • Brief Announcements [5 minutes]
  • Bans [5 minutes]
  • Working Group Report-Backs [15 minutes]
  • Member Collective Updates (10 minutes)
  • Proposal X: [15 minutes]
  • Proposal Y: [15 minutes]
  • Discussion Z: [10 minutes]

Introductions

Introduce yourself: Name; Preferred Pronoun; Affiliation; any brief announcements; say whether you're a delegate; let us know about any access needs you have†

Access Check In

Is everybody able to participate fully in this meeting? Do people have unmet needs or concerns?

Meeting Roles

  • Facilitator/s: Lynn
  • Explanation of hand signals: "deaf applause", "raised hand", "point of process", "direct response"(wildcard), etc.
  • Stacktaker: Almaz
  • Timekeeper: Almaz
  • Notetaker/s: Jenny
  • Vibe Reader:
  • Next meeting's facilitator(s): Phil will facilitate next meeting

Delegates

  • BAPS: Julian (remote)
  • CCL:
  • CSC: Mary Ann
  • FNB:Phil
  • GWS:
  • LL: robb
  • Sudo: Jenny
  • GCEA: Almaz
  • Quorum: 6/7 active collectives

Brief Announcements

  • Jenny: Sudo Mesh recently received a $100,000 donation and have decided to allocate $30K to Omni and $10K to Sudo Room - to be spent as they wish :)
    • next kitchen meeting Wednesday, Sep 12 from 6-7:30pm - come thru!
  • Basement progress! tis nearly painted
    • may need to remove Basement Hall from event request form for a bit while renovations are happening (both kitchen and medialab)

New Bans

  • Add to list of people asked to leave
  • jenny: Possible issue with a guy arose last night, communicated over text message (friend of a friend), he was found in the kids room (not sleeping, just computing), asked to leave and was amenable to engaging in conflict resolution process. sudo discussing.
  • Almaz states that the delegates have approved a proposal to lock the classroom.
    • Where is this documented? There is evidence that the children's room may be being used inappropriately (bra found in room).
      • jenny: ah, that wuz mine. spent many hours over the past few weekends in there working with and helping babysit for franki and dragon's babies while we were working on their legal case, and it must've fallen out of my bag (i tend to be running late and throw "professional-garb" into my backpack before i leave, and ashoka likes to explore my bag when im not looking. also, it was a bathing suit top, meant to be worn under a neat tanktop [which wuz also in my bag], whereas i often head to omni in a sports bra and tshirt in the event i get to painting / sweating).
      • let the record stand that the room wuz actually being used completely appropriately as a much-needed commons space - an accessible, kid-friendly workspace for a comrade POC mother in our community. she appreciated the rooms very very much, as she does not otherwise have access to any kid-friendly workspaces. wuz also hooking her up with a laptop cuz ashoka tore all the keyboard keys off the last one i gave her :P
        • tldr, via jenny: talk to the community using your space, and don't assume ill will or inappropriate behavior - especially before declaring such a valued community space locked and off-limits.
    • Almaz made the proposal last year after things were stolen from the class room. After discussion in one meeting, she met with BAPS to see if they could reach an agreement, since BAPS uses the space and was opposed. Here is the relevant notes from the following meeting (ALmaz wasn't there so Julian reported):

"Our proposal is to add a lock with a code to the doors to the room. Anyone who wants to use the room when it is free can get the code from us. We have discussed this with BAPS and they are in agreement with this arrangement. We appreciate your attention to this request.

      • Julian: Almaz communicated with me that this proposal will largely be withdrawn by GCEA, but that we should return to it next time
        • we're going to find a locked cabinet for the space to see if that keeps things satisfactorily secure."

Working Group Report-Backs

Building & permits

Meetings: not currently happening

Commons

Meetings: Second and Fourth Mondays at 5pm

    • MEETING ADJOURNED AFTER FALLOUT BETWEEN ALMAZ AND JENNY / ROBB RE: ABJECT LIES OVER RECENT COMMONS WG INCIDENTS, COLLECTIVE AGREEMENTS AND GCEA'S $2400 IN UNPAID INVOICES. SORRY, ALL. **

Last Meeting Notes

https://omnicommons.org/wiki/Event:2018/07/19_Delegates_Meeting

End of Meeting