Event:2015/08/17 Building Working Group
Jump to navigation
Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
NOmni Building Working Group, August 17, 2015
who's here
- laura, matt, yar, daniel, mary, remote joe
work party
- how'd this week go? what'd we do?
- south wall romex removed, new wire not installed yet. joe & his son are working on a written plan. switching from MM to MC flexible metallic conduit, after joe checks with inspector (joel ortiz) to make sure
- a few sheets of drywalling on the first floor south wall
- more doors got marked and screwholes glued. ready to screw and hang next time yar has an extra hour
- LC roof fans inspected - pigeons and wasps need to be removed
- got rid of lots of stuff from basement, including red stage. dump runs yesterday, today, tomorrow
- upstairs kitchen bathroom light fixed - needs metal cage
- electrical supplies mostly sorted - still some needed
- Daniel and mary measured and labeled all the old Romex so it can be given or sold to another job, or used by Sudo
WHat went well:
- good number of volunteers, they always had something to do
- organizing tasks in advance helped
- organizers arriving early to get set up
- frame removed from west LC mezzanine staircase
What didn't go well
- yar got there late, jessie couldn't stay
- kerrie was sick
- couldn't tell what basement wall needed to be patched
- rob knows about this, did it partially
- need to patch the water leak on the outside
- also involves getting childrens hospital to repave their parking lot. need contacts from DK
- food never showed up. next time cook with FNB or just use their kitchen
what could we do on sat 22?
- hang doors
- more drywalling, patching holes
- mount mirrors
- retile bathroom
- basement ceiliing tiles
- install 1 paper towel dispenser in stage l bathroom
- buy 3 more paper towel dipsensers and install secret bathroom, upstairs kitchen bathroom, ada bathroom
- fix secret bathroom door
- finish off the pigeons and wasps
- put cage on upstairs kitchen bathroom, or replace bulb with shatter proof bulb
- really need to go over the paper list more
- floor repair
wheelchair bathroom
- Becoming Omni group has requested that we have the wheelchair bathroom ready in time. Probably end of September.
klaus
- laura and yar met with klaus a few weeks ago, forgot to report back
- he recommended we leave doors off the "intersection of doom" for now and pass fire inspection without them, then put new doors further into the ballroom later
- he also made us take down the stage curtail
Remaining Changes to pass fire inspection of ballroom
- Remove hardware from front shattuck doors and install panic bars with normal latching mechanism
- Reinstalling exit signs