Event:2018/03/19 Basement Kitchen Meeting

From Omni Commons
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Kitchen Meeting - 3/19/18 - 5-6pm

  • Lighting fixtures: want surface mount, need to look at ceiling
  • Plumber wanted to find out about corner of Phat Beets pantry where hot water heater used to be
    • where they branch down from 3/4 to 1/2 - from there 3/4 is run into the kitchen
  • Estimate from Alba Windows -
    • suggested inserting a flange to hold the windows, but that would cut down on window size substantially
    • concrete repair on that wall will be tricky
  • Plumber: Wants to see the drain exposed, for us to decide about our dishwasher
    • joe: going to ask tony about tearing up the concrete there
  • Floor: Word from inspector Antonio Gohler: Altor Safety Grip, Protect All, and Eco Grip are the only 3 roll on floors that meet code besides tile and 1/4 epoxy.
    • Joe got the company that just redid Natural Choice' floor: Polytech 707-745-2800.
    • Natural Foods had 1400sqft done for $9500

Do we have enough of a crew?

  • Joe: i'm worried. we need a crew
  • phil: less work party. brief training at beginning of a task.
  • joe: first we need to finish the plans. figure out water heater, floor, windows, dishwasher, lights, then we can draw the plans
    • building the new walls is the easiest job and very satisfying
    • do we have to make final decision re floor, or can we put two possible options

Campaign

  • Phase I ($25K) should be enough for walls, floors, windows, plans & permits, some of the wiring

Action Items

  • Design Review Exemption from Betty Morris (DK)
  • Measure ceiling height (Joe)
  • Take out a window to see how it's attached
  • pester dk (all)
  • ask tony about concrete/floor by drain (joe)
  • ask mandela contact about leads re: kitchen expertise (robb)
  • email list about meeting times (joe)