Meeting Minutes 4/6/2015 These notes also at: https://pad.riseup.net/p/buildings Present: Laura T, Matt S, Joe L, amgo, DK, Sean F, Sean L, Jenny, Ali

SOUTH WALL SOUNDPROOFING

  • Sean is point person
  • Blow in insulation?
  • Joe: not industry standard anymore. Now insulate AND
  • how much Sound Transmission Coefficient/Noise
  • How much noise is leaking?
    • Spaz people did decibel reading
      • Didn't have
      • Sean will try to get that reading from spaz
    • 90 decibels might Cabaret law limit
  • Aiming to have this work done first 2 weeks in May
    • Sean's work

SEQUENCE OF WORK

  • Find out how much sound is coming out
  • get numbers about what sound deadening stuff works how much
  • DK is going to send an email to Brian and CC Sean Logan
  • DK: We should leave it to Brian's discretion
    • Maybe we can authorize a few hours professional labor for consulting
      • $150/hour for Brian
  • Jim (architect) might consult for cheap (up to now free)
    • Jim consult with Brian. Brian tell Jim what to mock up on Autocad
    • Contact Seb or Johnny to get decibel equipment and do a sound check under Seb's supervision
  • THINGS WE NEED
    • Lotsa sheet rock - Home Depot can drop it off
    • Sean must recruit a crew
  • ESTABLISH RELATIONSHIP WITH FACILITIES MANAGER OF CHILDREN'S HOSPITAL AND GET CLICKER FOR PARKING LOT

La Commune Wall

  • Joe is point person
  • Started today hauling stuff away
  • get rid of camper shell
  • if joe can get people to help him he can get some stuff
  • Get help from Jerome

PROFESSIONAL HUMAN RESOURCES

  • Jim-Architect- no charge
  • SEB - sound guy - has lotsa tools - loves OMNI\
  • BRIAN GLASSCOCK - Friend of Seb
  • BRIAN HOOD- Can no longer do it for free hoodconstructionco.com
  • Johnny Latimer - sound guy

NONHUMAN RESOURCES

  • 2 sets of scaffolding under stage

WORK DAYS

  • Door Day
  • Light day
    • install covers on all lights
  • Need to finish tracing conduit - FRIDAY?
    • Need at least 3 pple
    • extension cords
    • kinda confusing - can't trace all circuits on all subpanels in one day but we can start
    • need to be disconnected - any exposed conduit needs to be inflexible so all the stuff in walls must be destroyed

MAPPING ALL CIRCUITS

  • FRIDAY!
  • Needs at least 3 people
  • Need crew head
    • Matt, Patrik?, DK?, Jake?, Gerald?, Jerome, Rachel?, Liz?

La Commune

  • a row of countertop outlets
  • get counter height cuz don't want box below counter
    • height may be determined by sink

DOORS

  • APRIL 18 - DO ONE DOOR! marc juul - research all material needs BEFORE DOOR DAY
  • NEED DOOR DAY COORDINATOR
    • Who? DUsty? Liz?
  • ACCESS CONTROL
  • PANIC BARS
  • Maybe one day JUST panic bars
  • Marc Juul might be able to make panic bar/access
  • PREP
    • one set of access control equipment as prototype
    • Marc should finalize this list
  • MARC research panic bars! Panic bars need to be able to integrate with access control system

WHAT DO WE NEED PERMITS FOR

  • front door
  • lighting for la commune

FRONT DOOR

  • one wide door (at least 3' wide) and one 2' wide
    • need door to be 80" high for ADA
    • since we have to raise transom may as well change everything
    • for $5000 Ricky will do the door
  • Joe: T astrical as opposed to post
      • includes supplies
    • Seppy can't do the cool double door thing alone now too busy
    • LAURA WILL ASK FRIEND
    • DK WILL ASK A PERSON
    • DK knows a Doug the Anarchist Carpenter
    • DK friend Armel willing to do cool political stained glass thing for top

DEVELOPING RELATIONSHIPS WITH CITY PEOPLE

  • Passing lots of ppl onto Sean F., Joe
    • personal trust and getting along are most important

Building & Fire

  • discrete tasks
  • haven't yet had a building inspection

INSPECTIONS

  • If inspectors think we are using the building we get a set amount of time to finish project
  • If we are actually working on stuff it's not as scary
  • City wants us to succeed and probably won't send over surprise inspection BUTTTTT
  • Commercial Kitchen

BASEMENT KITCHEN

    • Involve Phat Beets
    • Make up air
    • stove - mechanical inspection - don't say we fixed it - it's grandfathered in
      • need to clean out pilot holes
      • may need new ranges
    • Ansel fire suppression - max knows a good person for $2k
    • Disassemble roof fire suppression
      • Disassemble exhaust hood on the roof for the kitchen stove fan, writing down the model number for the fan
    • windows
    • floors
    • knock out wall? When?
    • Ask Antonio to do official basement kitchen ($160/visit)
  • Price out kitchen fixes
  • Going to wait for building officials to tell us that we need to replace the stove.
  • Get Phat Beets involved, start a regular kitchen meeting with them?

Planning

  • abstract
  • they are kinda on our side and want us to succeed
  • DK, Sean f, and Joe will go over everything & puzzle out how all to deal with plans, and introduce to planners
  • Together make decisions about what kind of goals want to aim for

ADA BATHROOM

  • Can't get inspected til La Commune wall is done
  • Need to close holes (?)
  • Liasing with John Givens - Joe?
    • Should also be Board President
    • He loves candy
    • More frequent, short (less than an hour), frequent meetings are best. Perhaps meet on the weekly?
    • Replaced the skylights in sudo/ccl as a nice thing to do for us, could potentially be convincd to do the same thing for the ballroom
  • BID liaison - Sarah P?
  • Neighborhood Groups - JENNY
    • Town SquARED
    • Temescal Merchants Association
    • NextDoor
    • Yahoo group for Temescal
    • 48th Street group
    • Ultra
    • Nautilus
      • Developers, contact is Lindsay
  • 3-phase power with Nautilus - Whitney
    • New maintenance panel, try to get John to buy it
  • what if we make cost lists for all building projects and then point out ot JG what his $ responsibility
  • JG will suspect we don't really have to do it

CCL PLUMBING

  • Talk to friend of Laura t scott rector, licensed plumber
  • put mop sink in ADA bathroom
  • Running pipe under the hallway to sudo/ccl to the bathroom there
  • Need to make sure to get John's approval on all major building repairs
  • Any unlicensed contractor work we do must be done by a MEMBER
    • mechanics leins

MISC ACTIONS

  • Go down to Public Records and look at the redacted records for the building
  • Go file and run in the paper for 30 days 'Omni Commons' DBA
  • Update Wishlist on the wiki: https://omnicommons.org/wiki/WishList

FOUNDATION BASEMENT

  • south retaining wall leak
  • mold
  • MPM, Phat Beets, & Black Hole should work on that
  • take down all siding and dry wall against back wall
  • set up apptmt from facilities manager from children's hospital because may need to build a trnch cuz maybe coming from flower beds
  • SIKA Flecks??
  • plastic on both sides
  • the water table in Temescal is really high
  • oil-based primer over the mold areas after spraying with bleach and dumping a bucket of water on it
  • rip out the carpet in the basement