Event:2015/05/19 DK Brain Dump
Revision as of 00:10, 25 May 2015 by Tunabananas (talk | contribs) (uploaded 5/19 dk brain dump notes)
Mtg w/ DK - Tuesday, May 19, 2015 Present: Laura, DK, Joe, Sean L, Jenny
- Last night decided to divide up labor:
- David on front door, ventilation, noisefloor of the neighborhood, land use permit application
- Sean L and Joe on S Wall
- Anca and Dusty on ballroom doors
- Matt on electrical - we're 99.9% there
South Wall:
- Replace paneling with drywall
- Must make sure it's really well-attached
Ventilation:
- Bathrooms
- La Commune
- Could do 3 bathrooms with one fan
- Basement Kitchen
- Ask for someone to lead installation
- Sudo / CCL ventilation - integrated ducting - one fan could vent 2 skylights - build a cheap frame around skylight with rolling sunshade cloth would reduce the need
for ventilation (cost effective and simple) Doors:
- Jenny ordered a door closer, should arrive this week
- Ballroom doors second most important - also need closers
- OPD won't accept old clearance for assembly - definitely a priority
- Panic bars - Dusty and Anca - Laura will cat-herd
- Door set - Jenny will cat-herd and purchase one set
Electrical:
- CCL outlets
- Fan in the basement
- MPM's offset press - 30amps - ask MPM to pay Mike to hook it up (DK sent an email to Kate)
- 3 remaining ballasts in the basement
MSD:
- Hazardous materials list - Jenny will ask Jake and Adam to make a hard copy in a binder for sudo (eg ignitable metal powder)
ADA Bathroom:
- Yar will try to find time to drain the toilet this week
Goals for this week:
- DK:
- Submit permit for S Wall & Front Door
- Review list of tasks and update
- Schedule noisefloor tests w/ Seb
- Remaining electrical tasks, get Mike to come
- Sean: begin drywall on S wall
- Joe:
- Tape Disco Room window & work on S Wall
- Ensure plan is submitted to city
- Meeting w/ Mary & John tomorrow - finding stack of pictures
- Jenny:
- Order drywall
- Order electric strike, panic bar
- MSDS for sudo
- Ask Jake to finish basement ballasts
- Laura:
- Plan for 'anyone' tasks by priority
- Coordinate the door stuff
- Robb:
- Tear up the rug
- Assess mold situation
- Working on ballroom lighting
Fire:
- Private inspection in 2007
- Check against existing report
Tasks:
- Order drywall for S Wall - 45 sheets 5/8" drywall - Jenny and Sean after meeting
- ID last electrical tasks
- Joe will talk to Seb and Jim to clarify air gap size
- DK send spreadsheet to Jenny to put in cloud
- Jenny will cat-herd the door components: cafe to ballroom (2); shattuck door, sudoor and back door - order 5 electric strikes (one first)
- Electric strike, Beaglebone, arduino
- Ask Jake to come finish the basement ballasts
- Ask Whitney or Jake to prioritize the list
- Finish listing materials on the task spreadsheet