Mtg w/ DK - Tuesday, May 19, 2015 Present: Laura, DK, Joe, Sean L, Jenny

  • Last night decided to divide up labor:
    • David on front door, ventilation, noisefloor of the neighborhood, land use permit application
    • Sean L and Joe on S Wall
    • Anca and Dusty on ballroom doors
    • Matt on electrical - we're 99.9% there

South Wall:

  • Replace paneling with drywall
  • Must make sure it's really well-attached

Ventilation:

  • Bathrooms
    • La Commune
    • Could do 3 bathrooms with one fan
  • Basement Kitchen
  • Ask for someone to lead installation
  • Sudo / CCL ventilation - integrated ducting - one fan could vent 2 skylights - build a cheap frame around skylight with rolling sunshade cloth would reduce the need

for ventilation (cost effective and simple) Doors:

  • Jenny ordered a door closer, should arrive this week
  • Ballroom doors second most important - also need closers
    • OPD won't accept old clearance for assembly - definitely a priority
  • Panic bars - Dusty and Anca - Laura will cat-herd
  • Door set - Jenny will cat-herd and purchase one set

Electrical:

  • CCL outlets
  • Fan in the basement
  • MPM's offset press - 30amps - ask MPM to pay Mike to hook it up (DK sent an email to Kate)
  • 3 remaining ballasts in the basement

MSD:

  • Hazardous materials list - Jenny will ask Jake and Adam to make a hard copy in a binder for sudo (eg ignitable metal powder)

ADA Bathroom:

  • Yar will try to find time to drain the toilet this week

Goals for this week:

  • DK:
    • Submit permit for S Wall & Front Door
    • Review list of tasks and update
    • Schedule noisefloor tests w/ Seb
    • Remaining electrical tasks, get Mike to come
  • Sean: begin drywall on S wall
  • Joe:
    • Tape Disco Room window & work on S Wall
    • Ensure plan is submitted to city
    • Meeting w/ Mary & John tomorrow - finding stack of pictures
  • Jenny:
    • Order drywall
    • Order electric strike, panic bar
    • MSDS for sudo
    • Ask Jake to finish basement ballasts
  • Laura:
    • Plan for 'anyone' tasks by priority
    • Coordinate the door stuff
  • Robb:
    • Tear up the rug
    • Assess mold situation
    • Working on ballroom lighting

Fire:

  • Private inspection in 2007
  • Check against existing report

Tasks:

  • Order drywall for S Wall - 45 sheets 5/8" drywall - Jenny and Sean after meeting
  • ID last electrical tasks
  • Joe will talk to Seb and Jim to clarify air gap size
  • DK send spreadsheet to Jenny to put in cloud
  • Jenny will cat-herd the door components: cafe to ballroom (2); shattuck door, sudoor and back door - order 5 electric strikes (one first)
    • Electric strike, Beaglebone, arduino
  • Ask Jake to come finish the basement ballasts
  • Ask Whitney or Jake to prioritize the list
  • Finish listing materials on the task spreadsheet