==URGENT: ADA wheelchair lift==
Requirements:
Per the lease, all construction that we'll be reimbursed for 50% by our landlord has to be signed off by a licensed contractor
'''PORTABLE SYSTEM INSTALLED - see [[Wheelchair Lift]]'''
We plan to replace this system with a more permanent installation in the future, when building modification plans have settled a bit.


==URGENT: ADA bathroom==
==URGENT: ADA bathroom==
Line 42: Line 34:
File:4799 Shattuck - Fire Exit Signs & Extinguisher layout basement.png|Basement
File:4799 Shattuck - Fire Exit Signs & Extinguisher layout basement.png|Basement
</gallery>
</gallery>
==ADA wheelchair lift==
Requirements:
Per the lease, all construction that we'll be reimbursed for 50% by our landlord has to be signed off by a licensed contractor
'''PORTABLE SYSTEM INSTALLED - see [[Wheelchair Lift]]'''
We plan to replace this system with a more permanent installation in the future, when building modification plans have settled a bit.


==New exit from Bocce ball Ct to 48th str==
==New exit from Bocce ball Ct to 48th str==

Revision as of 21:44, 18 December 2014

Use this page to document planned or ongoing Omni construction projects. Please include floor plans and/or photographs so everyone knows exactly where any proposed construction is planned to happen. Consider creating a separate page for larger projects, but link to it with a short summary from here.

Use the Annotated Floorplan as the basis for your drawings (or the Detailed Drawings if you absolutely need specific details). And please use the names and numbers in square brackets on these floorplans to refer to specific rooms:

-->>> Omni building tasks and needs – running list <<<--

List of building repairs/improvements in no particular order

URGENT: ADA bathroom

Requirements: Per the lease, all construction that we'll be reimbursed for 50% by our landlord has to be signed off by a licensed contractor. For design requirements, see: http://www.bobrick.com/Documents/PlanningGuide.pdf

Construction almost done, but please don't use this bathroom yet until the floor tiles are patched up - wouldn't want to get any spills seeping into the fresh cement!

The door to the ADA bathroom is currently locked.

Niki:

I would talk to Ben [Burke] about this. I don't know all of the details but I am fairly certain that we are waiting on the permit before we can finish the bathroom (inspections require certain things to be open such as plumbing).Ben likely knows what the status of the permit is, I think.
I think DK has the key but Ben or Yar may also have one. This bathroom is not currently up to ADA code and we should not have folks using it until it is.

URGENT: Required upgrades for fire code

Fire extinguishers and exit signs

ADA wheelchair lift

Requirements: Per the lease, all construction that we'll be reimbursed for 50% by our landlord has to be signed off by a licensed contractor

PORTABLE SYSTEM INSTALLED - see Wheelchair Lift

We plan to replace this system with a more permanent installation in the future, when building modification plans have settled a bit.

New exit from Bocce ball Ct to 48th str

New sinks for CCL

Omni main floor CCLplumbing.png

Wishlist Projects

See also Parked ideas about the Omni.

  • Refinish (or just clean & polish) ballroom floor
  • Tear down marquee to open up ballroom windows
  • Roof garden
  • Strip garden along building facade on 48th