Electrical
This page provides a "living document" of the Omni Commons electrical system. It is not necessarily completely accurate, though it strives to be, and is always important to get updated!
6 of these panels are Federal Electric and need to be replaced ASAP: A, AA, AC, AD, AE, BAA
Also see our page on power usage
Timeline
- In 2021, Kent Cates (electrician) evaluated all our panels and wrote a brief report
Inspection of Electrical System at Omni Commons - 4799 Shattuck ave - 2/5/2021. Main Electrical service is 200 amps, Copper wire Thhn. There are 12 sub panels throughout the building , Feeder wires are Copper THWN and THHN wire. Found 1 small panel that had Aluminum wire. Panel types were General Electric, Federal Pacific, Siemons, Industrial Electrical. Sub Feed wiring is in Conduit and MCC, wire type is Copper Thhn, THWN and some cloth covered ires. No Aluminum wire was found. There was No Knob and Tube wiring found in the building.
Panels
- Main Panel (in ANV office, room E of rear [48th St] exit)
- Panel A (adjacent to main in ANV office)
- Panel AA (in ANV office, on E wall adjacent to Entrance Hall)
- Panel AB (in basement next to N staircase)
- Panel AC (in basement NW Kitchen Pantry, on E wall)
- Panel AD (located upstage left in N corner of W wall of ballroom)
- Panel ADA (in shower room on E wall)
- Panel AE (located in storage room S of stage in N corner of W wall of ballroom)
- Panel B (in Crow's Nest above stage in ballroom)
- Panel BA (in rear ballroom balcony near S wall)
- Panel BAA (on N wall of classroom between ballroom and Entrance Hall)
- Panel BAAA (behind Entrance Hall counter on S wall)
- Panel BAA (on N wall of classroom between ballroom and Entrance Hall)
- Panel BA (in rear ballroom balcony near S wall)
- Panel C (in Disco Room at base of ladder to DJ booth)
- Panel D (in ANV office on E wall shared with Entrance Hall)
- Panel A (adjacent to main in ANV office)
- CCL Panel - (Located next to door into CCL / sudo room area) - Apparently not yet documented here?
X = Disconnected
Main Panel
Label -> | Breaker # | Breaker # | <- Label |
---|---|---|---|
Panel B & Panel D 200amps | 1 | 2 | |
3 | 4 | ||
Panel A 200amps | 5 | 6 | |
7 | 8 | ||
X | 9 | 10 | Panel C 100amps |
11 | 12 | ||
Storage #5 / Trash Room | 13 | 14 | n/a |
15 | 16 | n/a | |
Storage #5 / Trash Room | 17 | 18 | n/a |
Counter Culture Labs (CCL) Closet |
19 | 20 | n/a |
21 | 22 | n/a | |
n/a | 23 | 24 | n/a |
Panel A
This panel is Federal Electric and needs to be replaced ASAP.
200amps
Label -> | Breaker # | Breaker # | <- Label |
---|---|---|---|
Panel AA (Entrance Hall) | 1 | 21 | Panel AE |
2 | 22 | ||
Panel AB | 3 | 23 | 220V plug (former rise above dryer) via Panel AA |
4 | 24 | ||
? Panel AC | 5 | 25 | Panel AD |
6 | 26 | ||
7 | 27 | ||
8 | 28 | ||
9 | 29 | ||
Upstairs (cafe mezzanine) kitchen light / Upstairs (cafe mezzanine) bathroom lights / Exit Sign at top of W cafe mezzanine staircase |
10 | 30 | Sudo Room outlets on South Wall |
Outlets along north wall of entrance hall | 11 | 31 | X |
Hood over oven in upstairs kitchenette (cafe mezzanine) / W Wall Kitchenette Outlet (R of sink) / W wall kichenette outlet (Above oven in alcove) |
12 | 32 | |
13 | 33 | ||
14 | 34 | ||
15 | 35 | ||
16 | 36 | X | |
17 | 37 | Blue Classroom S wall outlets | |
2 TIL Office Lights (upstairs) / Front Door Exit Sign / Two Lights on Beam at entrance |
18 | 38 | |
Light fixture and outlets in Blue Classroom alcove on N wall |
19 | 39 | |
Upstairs kitchenette (cafe mezzanine) S wall outlets / W Wall Kitchenette Outlet (L of sink) / N wall kitchenette outlets (at entrance) / Outlets under bar on S Wall of Disco Room near S Wal of Kitchenette |
20 | 40 |
Panel AA
This panel is a mystery to us. We could not identify any use for most of the breakers, other than #9. I suspect it may have fed the former bar area fridges, appliances & outlets which were demolished in 2015. Perhaps the overhead lights as well.
This panel is Federal Electric and needs to be replaced ASAP.
Label -> | Breaker # | Breaker # | <- Label |
---|---|---|---|
6 | 12 | ||
5 | 11 | ||
4 | 10 | ||
3 | 9 | wheelchair bathroom light & outlet, exit light at the west edge of entrance hall (exit to the hallway), secure storage & cleaning closet | |
2 | 8 | ||
1 | 7 |
Panel AB
Label -> | Breaker # | Breaker # | <- Label |
---|---|---|---|
20A basement furnace? | 8 | 16 | 15A |
7 | 15 | 15A Liberated Lens, other small basement rooms & adjacent outlets. | |
15A kitchen & pantry lights | 6 | 14 | 15A |
20A | 5 | 13 | 15A large basement meeting room - most outlets except on south wall |
20A | 4 | 12 | 15A lights in large basement meeting room & rear basement hallway |
20A Ballroom Furnace | 3 | 11 | 15A |
15A Entrance Hall Furnace |
2 | 10 | 15A basement flourescent lights |
30A kitchen outlets, fridges | 1 | 9 | 15A basement flourescent lights |
Panel AC
This panel is Federal Electric and needs to be replaced ASAP.
80A from Panel A
AFAICT this panel only powers the kitchen stove hood fan & light. Nothing else seems to be effected.
info | Breaker # |
---|---|
nothing | 4 |
nothing? | 3 |
nothing? | 2 |
hood fan & light | 1 |
Panel AD
This panel is Federal Electric and needs to be replaced ASAP.
Label -> | Breaker # | Breaker # | <- Label |
---|---|---|---|
Counter Culture Labs (CCL) E wall outlets |
2 | 1 | Stage Vanity Lights & NW Ballroom Bathroom Light & NW Bathroom Hallway Light |
Panel ADA (2 x 30A) Former Hot Tub in Mezzanine Shower Room |
4 | 3 | Stage Left Ballroom Floor Outlets |
6 | 5 | Stage Right Ballroom Floor Outlets & Stage Right Outlets | |
8 | 7 | Upstage Center outlet & Stage Left Outlet | |
10 | 9 | Crow's Nest Interior light/fan & SW Ballroom Staircase Light & Ballroom Mop Closet Light & Lights beneath Ballroom Mezzanine | |
SE Ballroom Bathroom Lights | 12 | 11 | GFI outlet (used for screen printing sink in Mezzanine Shower Room) |
Panel ADA
This panel is located upstairs in the "shower room" which also used to house a hot tub and laundry machines.
Label -> | Breaker # |
---|---|
Former Hot Hub | 1 |
Panel AE
This panel is Federal Electric and needs to be replaced ASAP.
Label -> | Breaker # | Breaker # | <- Label |
---|---|---|---|
Stage left floor outlet/s | 1 | 2 | Ballroom Under Bar Outlet #2 (from L) |
Stage right floor outlet/s | 3 | 4 | Ballroom Under Bar Outlet #1 (from L) Ballroom Shattuck Entrance's Exit Signs (3) |
Ballroom Under Bar Outlet #3 (from L) |
5 | 6 | Stage Storage Room (office #3) Outlets |
Ballroom Under Bar Outlet #4 (from L) |
7 | 8 | X |
Ballroom Balcony S Wall Lights & SW Staircase Exit Signs & SE Staircase lights / exit signs & SW Ballroom wall outlets |
9 | 10 | X |
X | 11 | 12 | X |
Panel B
100amps
Label -> | Breaker # | Breaker # | <- Label |
---|---|---|---|
X | 1 | 2 | X |
X | 3 | 4 | X |
X | 5 | 6 | Basement Vent |
X | 7 | 8 | |
Panel BA (Ballroom Balcony) |
9 | 10 | Sudo Equipment |
11 | 12 | ||
Sudo Room Servers | 13 | 14 | X |
Outlets in Room adjacent to Crow's Nest |
15 | 16 | X |
X | 17 | 18 | Exhaust Fans & Outlets in over-stage Crow's Nest |
X | 19 | 20 | Sudo Room outlets on South Wall |
Panel BA
Label -> | Breaker # | Breaker # | <- Label |
---|---|---|---|
Ballroom Fans | 1 | 2 | Balcony Chandelier (Single) |
Ballroom Rafter/Lattice Disco Ball |
3 | 4 | Ballroom Chandeliers |
X | 5 | 6 | |
Aux #4 | 7 | 8 | Panel BAA (Office #1) |
X | 9 | 10 | |
Ballroom Rafter/Lattice Disco Ball Lights |
11 | 12 | X |
Aux #1 | 13 | 14 | Aux #2 |
Aux #5 | 15 | 16 | Aux #3 |
Panel BAA
This panel is Federal Electric and needs to be replaced ASAP.
Label -> | Breaker # | Breaker # | <- Label |
---|---|---|---|
Panel BAAA in Entrance Hall |
1 | 2 | n/a |
3 | 4 | n/a | |
5 | 6 | X | |
n/a | 7 | 8 |
Panel BAAA
Label -> | Breaker # | Breaker # | <- Label |
---|---|---|---|
n/a | 2 | 1 | Outlet Under Counter |
n/a | 4 | 3 | Outlet next to Counter (1ft above floor) & Outlet under counter |
Outlet (twist lock) on counter |
6 | 5 | Outlet under counter (circuit 5 breaker nfg) |
8 | 7 |
This panel used to be under the entrance hall bar counter. When that counter was demolished, this panel was moved to the wall.
Panel C
100amps
I couldn't find this panel to take a picture --yar
Panel D
100 amps
Fan Panel
[yar will upload a picture]
230 amps, says "exhaust fan", we don't know what feeds it
Floorplans
- Panel Tree Diagram
{Placeholder}
- Annotated Floorplan
{Placeholder}
Documentation Protocol
Any building's electrical system is intended to serve the needs of the users of the building in a safe manner. However, we operate within constraints such as the historical developments of the electrical system, regulations, best practices, etc. In order to reduce ambiguity and risk, we must use a consistent documentation protocol throughout the system to understand and share knowledge of historical, current, and future uses.
Naming Convention
- Label the main electrical panel as "MAIN"
- Label the direct sub-panels of the main panel with a letter, e.g. "A", "B".
- Label each sub-panel that is connected to a first-tier sub-panel of the main panel.
- "origin panel letter" + "sub-panel letter" + ... (for each sub-panel add another letter) ...
- e.g. "AA" for the first sub-panel from panel "A"
- e.g. "AAB" for the second sub-panel attached to panel "AA"
- "origin panel letter" + "sub-panel letter" + ... (for each sub-panel add another letter) ...
- For each circuit, label each outlet, switch, and load with:
- the appropriate sub-panel name (described above) + "breaker number"
- e.g. All the outlets in one room that are on the same circuit should be labeled "CA4" meaning the circuit is on breaker 4 on panel CA, which is the first panel originating from panel C that connects to the Main panel.
- the draw on the curcuit
- e.g. 20 amps
- the appropriate sub-panel name (described above) + "breaker number"
Here is the OLD breaker panel diagram
Protocol
- We are especially (not exclusively) updating our electrical system documentation on a room-by-room basis.
- As you work throughout Omni Commons, you should only use the system described above to map the electrical system.
- All other systems will be overridden.
- You can print this page and the building floorplans above in order to document the labeling you make on the actual outlets, panels, etc.
- After labeling and writing on the printed building floorplan, deliver it to any member of the Building Working Group.